ABB
Total years of experience :15 years, 4 Months
Participating with electrical and I&C teams in the electrical package in contract
package 117 in Abu Qir thermal power plant 1x750 MW as the followings:
1‐ Prepared the RFQs the below items
2‐ Study the offers from the suppliers
3‐ prepared the evaluation report for the supplier offers
4‐ Coordination between the suppliers and the consultant of the project for the
following items:
● Transmitters ( Temperature, Pressure, Flow and Level )
● Gauges (Pressure and Level )
● Switches ( Level )
● Temperature, Level controllers and A/D converter
● I \ O list
● Load List
● Hook-Up drawings
Brand Names Deal with.
●
responsible for.
● Change all damaged Instrumentation (Pressure, Temperature, Flow, Level and
Analyzers)
● Change all damaged fittings and tubing.
● Change all damaged Actuators of Valves (Pneumatic and Motorized)
PROJECT: El Sokhna Thermal Plant (2x650 MW).
Client: PSP /WDEPC
power system projects “subsidiary of El Sewedy Cables” (PSP) power system
project Company (www.psp.com.eg
responsible for.
● Revising of systems P&ID.
● Selecting types of Instrumentation.
● Hook-up drawings and fitting .
● Continuous Emission monitoring system (CEMS)
PROJECT: North GIZA Combined Cycle power Plant I, II and III
(3x750 MW).
Client: PSP /
responsible for.
● Revising of systems P&ID.
● Selecting Instrumentation types (Pressure, Temperature, Flow, Level and
Analyzers).
● Handling Continuous Emission monitoring system (CEMS)
● Issuing Hook-up drawings and BOQ of Fittings & Tubing.
● Handling Fuel Gas System (Filtering, Metering and Purging )
● Mixed Bed for water treatment
PROJECT: El-Mahmoudiya Simple Cycle (2x160 MW).
Client: PSP /
responsible for.
● Revising of systems P&ID.
● Selecting Instrumentation types (Pressure, Temperature, Flow, Level and
Analyzers).
● Handling Continuous Emission monitoring system (CEMS)
● Issuing Hook-up drawings and BOQ of Fittings & Tubing.
● Handling Water Treatment.
PROJECT: El Tebbin Rehabilitation Thermal Power Plant (2x300
MW).
Client: PSP /CEPC
responsible for.
● Handling Instrumentation Spare Parts (Pressure, Temperature, Flow and Level)
PROJECT: Eldiwanya Simple Cycle in IRAQ(4x125 MW).
Client: PSP /MOE
Participating with electrical and I&C teams in the electrical package in contract
package 118 in Abu Qir thermal power plant 1x750 MW as the followings:
1‐ Prepared the RFQs the below items
2‐ Study the offers from the suppliers
3‐ prepared the evaluation report for the supplier offers
4‐ Coordination between the suppliers and the consultant of the project for the
following items:
● Transmitters ( Temperature, Pressure, Flow and Level )
● Gauges ( Temperature, Pressure, Level and Flow )
● Switches ( Temperature, Pressure, Flow and Level )
● Flow Elements
● Temperature Elements
● Instrument Tubing, piping, Valves and Fitting.
● I \ O list
● Revising of systems P&ID to confirm that instrumentation cover processes.
Brand Names Deal with.
● Tecsas Italy,
Participating with electrical and I&C teams in the electrical package in contract
package 117 in Abu Qir thermal power plant 1x750 MW as the followings:
1‐ Prepared the RFQs the below items
2‐ Study the offers from the suppliers
3‐ prepared the evaluation report for the supplier offers
4‐ Coordination between the suppliers and the consultant of the project for the
following items:
● Transmitters ( Temperature, Pressure, Flow and Level )
● Gauges (Pressure and Level )
● Switches ( Level )
● Temperature, Level controllers and A/D converter
● I \ O list
● Load List.
Brand Names Deal with.
● ABB, and Wika
● HY-lok, Parker and schoeller bleckmann (Fitting and Tubing)
PROJECT: BANHA Combined Cycle power Plant I (1x750 MW).
Client
Participating with electrical and I&C teams in the electrical package in contract
package 118 in Abu Qir thermal power plant 2*650 MW as the followings:
1‐ Prepared the RFQs the below items
2‐ Study the offers from the suppliers
3‐ prepared the evaluation report for the supplier offers
4‐ Coordination between the suppliers and the consultant of the project for the
following items:
● Temperature Instruments
● Pressure Instruments
● Flow Instruments
● Level Instruments
● Water Analyzers
● Continuous Emission Monitoring Systems .
● Instrument Tubing, piping, Valves and Fitting.
● I \ O list
●Load list
● Hook-Up drawings
●Instrument Air network.
Site work
1-
‐ Instrumentation and Control (I&C)
the field of Power Plants involved in service systems like
Fuel Gas, LDO, Solar, Mazout and water treatment handling below items:
● Temperature Instruments like Thermowells, RTD, Transmitters, Controllers.
● Pressure Instruments like Gauges, Switches and Transmitters .
● Level Instruments Like Radar, Floating, D/P and controllers .
● Flow Instruments Like Coriolis, D/P and Variable area.
● Flow Instruments Like Coriolis, D/P and Variable area.
● Gas Analyzers Like NDIR, Chromatograph, Opacity and Chemiluminescence.
● Continuous Emission Monitoring System (CEMS).
● Water Analyzers like conductivity (specific and cation), silica and sodium.
● Steam and Water Analysis System (SWAS).
● Fuel Gas System (Filtering, Metering and Purging ).
● Issuing Hook-up drawings and BOQ of Fittings & Tubing.
● Pneumatic Valves (On-Off and Control ).
● Mixed Bed for water treatment.
● Revise P&ID.
● Estimating prices and tendering.
● Pneumatic Valves (On-Off and Control).
● I/O List.
● Load List.
PROJECT: Attaka Simple Cycle (4x160 MW).
Client: PSP /