خالد إبراهيم, Head of project and sale  department

خالد إبراهيم

Head of project and sale department

Icf international crane factory

البلد
مصر
التعليم
بكالوريوس, Mechanical power engineering
الخبرات
23 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 10 أشهر

Head of project and sale department في Icf international crane factory
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ مايو 2020
Site Project Manager في ITS group
  • مصر - القاهرة
  • سبتمبر 2018 إلى مارس 2020

MEP project management

ittifaq steel في ittifaq steel
  • المملكة العربية السعودية - الدمام
  • يناير 2012 إلى يوليو 2018

• Perform engineering Stress calculations for pipelines According To International Codes and standards
• Perform engineering for procurement, including preparing material specifications, material and purchase requisitions
• Produce in house Detail Design Document, General Arrangement DWGs, Piping Plan, Piping Isometric, Equipment Selection, Equipment and Piping Material Data Sheet, Piping Class
• Generate Concept Design, Identified Problem & Solution
• Support The Construction Field Requirements
• Prepare / Review Cooling Water And Media Demand And Hydraulic Calculation
• Prepare / Review PFD, P&ID
• Provide Heat Balance and Mass Balance Calculation and Propose Design Modification To Optimized Existing System Operation and Running Cost
• Perform Design Calculation For Degusting System Along With Equipment Selection And Supported DWGs
• Produce/ check material quantity take-offs
• Review Vendor Print, Tender Document and Design Calculation
• Design of fire Water and Sprinkler System

Project manager في ITS Group
  • مصر - القاهرة
  • أغسطس 2011 إلى يناير 2012

• Carry out Site Mobilization, Organization and Resource Utilization
• Attending Progress, Safety Meeting With Client
• Carry Out Correspondence, Communication With Client and Supplier
• Coordination of Technical Submittal and Drawing Approval
• Prepare Various Documentation Including, Project Schedule, Method of statement, Reports, Cost Estimation, etc.
• Ensuring all materials used and work performed are as per Contract specifications
• Overseeing the selection and requisition of materials
• Overseeing quality control, health, and safety matters on site • Produce and Follow up Invoices, Payment and Variation Order
• Monitor, Review the work progress
- Project Name: Sharm El Sheikh Resort
Client: MEP Contractor Drake & Scull, Main Contractor: CCC, Owner: Qatari Diar

Sr. Project Engineer في AES arabia
  • المملكة العربية السعودية - الرياض
  • أغسطس 2009 إلى أغسطس 2010

• Handle the Kick off Meeting for All Project
• Produce Project Schedule
• Review Engineering Document and Drawing
• Manage Engineering Activity
• Prepare Technical Submittal and Get Client Approval
• Manage Procurement Activity
• Manage QC Activity and Coordinate PIM (Pre Inspection Meeting)
• Manage Installation and Commissioning Activity
• Communication with Client and Inside Company
• Cost Control and Prepare Invoice
• Prepare Project Final Dossiers
• Prepare Material Data Sheet and Guide Material Selection
• Communicate With Supplier for Local and Off Shore Material
- Project Name - Chemical Injection System (Manifa Gas Facilities), Saudi Aramco - Acid Neutralization System (Corporate Data Center), Saudi Aramco
- Demulisifier Injection Skids (Manifa Upstream Offshore Pipe Line), Saudi Aramco
- Scale Inhibitor and Corrosion Inhibitor dosing skids, Saudi Aramco
- STP (Sewage Treatment Plant (MBR)) & RO Plants (GOSI Office Park), GOSI
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- STP (Sewage Treatment Plant, RO and Filtration System (Al-Samaria Farm), Saudi Oger
- Fountain and Swimming Pool (Ayhar Villa), Saudi Oger.
- Fountain and Swimming Pool (Yamama Family Villas), Saudi Oger.

Site Manager في Trading and Agency Services LTD. (Trags)
  • قطر - الدوحة
  • أغسطس 2004 إلى يوليو 2009

• Managed a team of 150 people, and assigning them task
• Liaised and assist contract manager in order to ascertain the cost for the construction work
• Quantity surveying for (Piping, Steel Structure, Equipment, Painting, Scaffolding, Insulation, RT, PWHT, PMI, )
• Dealing with day to day contract and site issue for construction
• Plan, control and monitor the work progress, quantity and quality of the construction work to ensure Compliance to design specification
• Identified necessary corrective action and prepare the technical query
• Check all of construction work package drawings (P&ID, Piping Plan, ISO DWG, Others)
• Prepared reports for project manager
• Prepared the costing sheet for all constriction activity (piping, equipment, scaffolding, and Steel Structure)
• Prepared the costing of material and equipment related to the construction work
• Performed Site Supervision for new modification (Equipment erection, piping modification, Instrument and electrical Modification)
• Quantity surveying, Material Take off and cost estimation
• Measuring actual work and Produce as built drawing
• Carried out preparation of lifting plan (LP), method statement (MS) and job safety analysis (JSA) for Equipment Installation and Piping Fabrication and Erection
• Dealing with subcontractor and supplier
• Check subcontractor invoice and submitting CWR invoices to client
• Prepare bill of material (piping, structure, instrument and electrical)
• Manage, coordinated and follow up all material controlling at site
- Project Name
-5 year unit rate maintenance contract at Qatar petrochemical Company (QAPCO)
- Replacement of ESD Generator & installation of plate exchanger during QAPCO GSD
- Replacement of quench water new air Cooler in Ethylene plant lactated at QAPCO
- July-Aug., 2005 Equipment engineer for Pul Hanin (PS 3) offshore shutdown
- May-June, 2005 Equipment engineer for Maydan Mahzan (PS 2) offshore shutdown
- Feb.-Mar., 2005 Engineer In-Charge for Boiler and gas turbine shutdown at Ras GAS
- Nov., 2004, Mechanical supervisor for train 3 shutdown at RAS GAS
- Shutdown engineer for exchangers cleaning (Hydro jetting) in Qatar Vinyl Company (QVC)
- Piping engineer for construction of New Caustic Soda line in (QVC)

Mechanical Engineer في Porcelain International
  • مصر - الإسكندرية
  • أكتوبر 2003 إلى يوليو 2004

• Provided site supervision for equipment erection (Static, Machinery, Tunnel Kiln)
• Provide site supervision for piping fabrication and erection
• Produce fabrication Procedure for Tanks, Silo
• Provided Installation supervision for piping fabrication and erection
• Maintained of fluid power system
• Planned and identified lubrication schedule
• Prepare bill of material and purchase request
• Prepare Spare Part List
• Prepare Lubrication Schedule and List

Project Material Controller Manager في Samsung Engineering CO., LTD. ,
  • إيران
  • يونيو 2001 إلى نوفمبر 2002

• Monitor, coordinate and report on material related activities from estimates through preparation of bill of materials, ordering, transportation, receiving, installation and surplus disposition. Responsible for logistics, warehousing and facility
• Verifies that the documentation on each order matches the freight description
• Maintain auditable records of receiving and issuance data, non-conformances, shortage material and warranty necessary for documenting the material control and warehousing processes.
• Receive all incoming shipments. Make arrangements for and oversees unloading and handling of goods.
• Prepare warehouse requests; removes goods from storage for authorized consumption and utilization; bags, tags, and otherwise prepares goods for issuance; and makes the goods available at the point and time of need.
• Control issuance of equipment and goods to subcontractors.
• Identify, receive approval for, and disposes excess materials. Prepares close-out documents at the end of projects.
- Project Name
ABS Project(Tabriz Petrochemical Company)

Mechanical Engineer في Daelim Industrial CO., LTD at El-Ameriya, free zone.
  • مصر - الإسكندرية
  • سبتمبر 2000 إلى أبريل 2001

• Performed Site supervision for equipment erection (Static Equipment & Machinery)
• Carried out mechanical inspection for equipment installation (Static Equipment & Machinery)
• Implemented Mechanical Supervisor for pre-commissioning and commissioning
• Mechanical Inspector for compressor, Turbine and pump alignment, performed the performance test of centrifugal Pump
• Engineer in-Charge for refinery catalyst loading, and installation of structure packing
• Working with vendors supervisor During Commissioning
- Project Name Middle East oil refinery, Midor Co., LTD.

Equipment Engineer and Commissioning Engineer في Samsung Engineering CO., LTD. ,
  • مصر - الإسكندرية
  • سبتمبر 1999 إلى أغسطس 2000

• Unpacking inspector (inspection of construction material, equipment and spare parts)
• Material expeditor
• Prepare martial issuing plan according to site demand
• Mechanical Supervision for equipment erection
• Jointed pre-commissioning and commissioning for mechanical supervision
• Coordinate with vendor for equipment installation
• Preparation of inspection document and close out document
- Project Name
Sidi Kerir Petrochemical CO., LTD., 200, 000 MT/Y polyethylene

Mechanical Engineer في Egyptian Air Force
  • مصر - الإسكندرية
  • مايو 1998 إلى يونيو 1999

• Maintenance of Diesel Generator
• Maintenance of electrical distribution Pane

الخلفية التعليمية

بكالوريوس, Mechanical power engineering
  • في Alexandria University
  • مايو 1996

Specialties & Skills

Quantity Surveying
Estimation
Project Work
COMMUNICATION SKILLS
AUTOCAD
MICROSOFT OFFICE
PUBLIC SPEAKING
Primavera P6

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

saudi engineering council
  • consultant
  • January 2013

التدريب و الشهادات

Bearing Failure (تدريب)
معهد التدريب:
SKF
Piping Design ASME 31.3 (تدريب)
معهد التدريب:
ASME