floor man
national drilling company
مجموع سنوات الخبرة :7 years, 4 أشهر
Modern safety procedures have made the job safer than it was in the past although there are risks in all of the jobs that the roughnecks do .
Align and manipulate sections of pipe or drill stem from a platform on the rig derrick during the removal and replacement of strings of pipe .or drill stem and drill bit
Assist in setting up . taking down and transporting drilling and service Rigs
Operate and maintain drilling rig diesel motors. Transmissions. Pumps and drilling mud systems. And mix mud chemicals . cements and read gauges To monitor Pressure. Density. Rate and concentration and adjust pumping procedure as required additives.
Record mud flows and volumes and take samples.
I am assist in other jobs and work on the derrick as well
General information about the rig I was work in
Rated drilling depth : 16, 400ft …w\5 DP
Gross capacity : 700, 000 lbs - hook load : 700, 000 lbs height 147ft.
Rotary : 37-1\2 rotary speed 300 rpm.
Mud pumps : 2 single triplex : model f-1600 available power : 1500 HP for Ea max prees : 5000 psi
BOP : 21-1\4 2000Psi single + double +annular 13-5\8 10000Psi : single + double + annular
Top drive system : TDS - 11 SA
Application : medium and small rigs.
Motor : Reliance Electric Dual AC motor 2, 400 HP.
Capacity : 500 ton
Stock up height : 18ft
Max RPM : 228
Elevator links : 350 ton Api
Suez High School Industrial Technical School for Boys and I have industrial high school diploma (major electricity)