FTTH Engineer
Abr alkhaleej telecommunications
مجموع سنوات الخبرة :4 years, 8 أشهر
Guarantee safety regulations and following the execution of the civil work according to the given map.
Installation supervisor & Commissioning
Give (500 520 560 562 720 740 750 760 Description Front/Rear Load Lobby Cash Dispenser) Automated Tailor Machines ATM technical support ( maintenance, preventive repairs) at all modules :
- Presentation :
1/ computer hardware and software (main computer, CCA).
2/ Mechanical (card reader, printers, presenter etc.. )
- Dispenser (Mechanical):
pickers and cassettes.
- Communications and networking (IP addressing).
- Reporting to projects managers by all the procedures which has been taken, as well as, the recommendations that could helps in improving the quality of services to satisfy the inspiration of the costumers.
Network management and troubleshoot.
- Give the all department end users the necessary instant technical support to make sure all given systems are working as they managed to be.
- Add new users to a required module with a required polices and authentications.
- make sure all hardware equipment s are always operational and working properly and they are in a good environment (servers, desktops and printers) .
- Reporting to IT manager ( every 3 months ) about the conditions of all given equipment s and an update of what has been done among this period, in addition to a list of recommendations that could take place to improve the performance of the given system.
1/ BTS (Base Transceiver Station) site equipping and operating
Which includes the following temptations:
- Ericsson Radio Base Station (RBS) installation.
- GSM Antennas assembling and installation.
- Radio Feeders installation and management.
- RF Cable installation and management.
- BBC (power supply unit) installation and cabling.
- Traffic node installation.
- E1 cabling and management.
- RBS commissioning and operating.
- Call test checking.
- Drive test checking.
2/ Expansion:
- SIU equipping and integrating along with VISAT system (WAN).
3/ Planning:
- Site acquisition (locating new Base Transceiver Stations BTS).
- 3G survey (on air site).
4/ tools supply.
- Reporting to project manager by all the procedures which has been taken, as well as, the recommendations that could help in improving the quality of services to satisfy the inspiration of the costumers.
Involved in site repair and Site civil quality management (indoor and outdoor units):
Outdoor :
- General tower structure management.
- Tower and runways cabling management checking and make repairs if necessary .
- Antennas tilting and azimuth measurements.
Indoor :
- General shelter structure fixtures management.
- Make sure that all systems and equipment s are working properly and in a good environment.
- Doing survey for additional new equipment s to take place indoor.
- Indoor cabling features and management.
- Indoor AC system status checking.
- Reporting to projects managers by all the procedures which has been taken, as well as, the recommendations that could helps in improving the quality of services to satisfy the inspiration of the costumers.