Planning Engineer في Alrawaf Contracting - NEOM
  • المملكة العربية السعودية - تبوك
  • أشغل هذه الوظيفة منذ مارس 2023

Planning Engineer

PLANNING & COST CONTROL ENGINEER في Egyptian Maintenance Company (EMC) (Oil & Gas Co.)
  • العراق - البصرة
  • يناير 2018 إلى مايو 2021

Field : Construction
•DURATION : FROM: 01-Feb-2021 To: 15-Aug-2022
•PROJECT : Construction of 18 Residential Building @ Al Mansoura Al Gadida City-Dar Misr Project
•LOCATION : New Mansoura City - Egypt
•CLIENT : New urban Committee Authority
•SCOPE OF WORK:
-Maintain & Update the time schedules, Progress Measurement System & Resources histograms.
-Monitoring time Schedule for all Works in the site using Control Sheet, S-Curve & Programmed software. (Primavera P6).
-Providing measurements weekly/monthly productivity of the project construction of the field stuff compared with the amounts of work.
-Follow up the work Progress & compare it with the planned to grantee best performance for the project executions to highlight in case of deviation.
-Trending & forecasting costs & work hours required to complete the project.
-Providing revised time schedules.
-Maintain recovery plan to compensate the slippage if any as a fast tracking or crashing.
-Preparing & review of the projects budget & Cost. (Materials, Subcontractors, Manpower (Internal/External), Equipment).
-Review Stuff transfer according to budget and cost centers.
-Follow up project's requisitions.
-Preparation of variation orders request.
-Preparation CTR considering productivity rates and nature of the work.
-Prepare delay analysis study for the project and full support analysis for claims for EOT with all supporting documents

PLANNING ENGINEER في Shams Al Sabah General Contracting Co. Ltd (SAS) - IRAQ
  • يناير 2018 إلى يوليو 2019

Field: Oil & Gas
•DURATION : FROM : 01-04-2018 TO 16-07-2019
•PROJECT: Zubair Permanent Power Generation Plant (ZPPG), 319MW (3x GT13E2+1 spare GT) + BOP for 600MW on full EPC basis.
•LOCATION: AL ZUBAIR, Southern area of Iraq, 20 km from Basra city.
•Client: GE/ENI
•SCOPE OF WORK: -
-Monitoring & Control the Master Time Schedule (Civil, Electrical, Mechanical).
-Update the Time Schedule with Actuals and forecast plan in close coordination with construction manager/team.
-Create S-Curves for Progress of Concrete, Steel Structural, GRE Pipes, cable pulling in close coordination with engineering team.
-Monitor & update manpower & equipment for best maneuvering to achieve the project in high performance.
-Develop / update the DRAFT progress measurement system.
-Attend the daily/weekly & monthly Progress Meeting. (7 non-technical Building, 3 technical building, 10 steel structure building, 7 tanks, GRE, CS, SS Pipes, 4 Gas Turbines with their BOP, 4 diesel generators)

PLANNING & COST CONTROL ENGINEER في Egyptian Maintenance Company (EMC) (Oil & Gas Co.)
  • مصر - القاهرة
  • يناير 2012 إلى فبراير 2018

Field : Residential
•DURATION : FROM: 01-Feb-2021 To: 15-Aug-2022
•PROJECT : Construction of 18 Residential Building @ Al Mansoura Al Gadida City-Dar Misr Project
•LOCATION : New Mansoura City - Egypt
•CLIENT : New urban Committee Authority
•SCOPE OF WORK:
-Maintain & Update the time schedules, Progress Measurement System & Resources histograms.
-Monitoring time Schedule for all Works in the site using Control Sheet, S-Curve & Programmed software. (Primavera P6).
-Providing measurements weekly/monthly productivity of the project construction of the field stuff compared with the amounts of work.
-Follow up the work Progress & compare it with the planned to grantee best performance for the project executions to highlight in case of deviation.
-Trending & forecasting costs & work hours required to complete the project.
-Preparing & forecasting the cash flow (Cash Call) (In/Out).
-Providing revised time schedules.
-Maintain recovery plan to compensate the slippage if any as a fast tracking or crashing.
-Preparing & review of the projects budget & Cost. (Materials, Subcontractors, Manpower (Internal/External), Equipment).
-Review Stuff transfer according to budget and cost centers.
-Follow up project's requisitions.
-Preparation of variation orders request.
-Preparation CTR considering productivity rates and nature of the work.
-Preparing Invoice & AMP (Application for Milestone Certificate)
-Prepare delay analysis study for the project and full support analysis for claims for EOT with all supporting documents

PLANNING ENGINEER في Egyptian Maintenance Company (EMC) (Oil & Gas)
  • يناير 2018 إلى يناير 2018

Field: Oil & Gas
•DURATION: FROM 01-01-2018 To 01-04-2018
•PROJECT: Manufacturing, Welding & Installation of Pipes at Zohr Project
•LOCATION: Port Saied, Egypt
•CLIENT: PETROJET/PETROBEL/ENI
•SCOPE OF WORK:
-Monitoring & Control the Time Schedule.
-Update the Time Schedule with Actuals and forecast.
-Monitoring productivity rates and equipment maneuvering.
-Create S-Curves for Progress in close coordination with engineering team.
-Create manpower histogram.
-Develop / update the DRAFT progress measurement system
-Attend the daily/weekly & monthly Progress Meeting Carbon Steel Pipes (from 2" to 42" / Cathodic protection Steal Structure Pipe racks / PT / RT)

TEAM LEADER ELECTRICAL ENGINEER في International Co. For Engineering (ICFE)
  • يناير 2015 إلى يناير 2016

Field: Oil & Gas
•DURATION: From 01-07-2015 To 01-02-2016
•LOCATION: Industrial Area - 6 October City - Giza - Egypt
•SCOPE OF WORK: Responsible for production line of Electrical power & Control panels under the umbrella of Schneider Electric Egypt (as a partner) in accordance to Schneider Co. policy & Norms. (Part Time)

ELECTRICAL DESIGNER ENGINEER في Engineers Consultant Group (ECG)
  • يناير 2013 إلى يناير 2013

Field: Oil & Gas
•DURATION: From 01-01-2013 To 01-03-2013
•LOCATION: Nasr City - Egypt
•SCOPE OF WORK: design indoor & outdoor lighting through manual calculation & DIALUX Software, design AutoCAD electrical drawings according to the Egyptian electrical Code & IEC.

الخلفية التعليمية

, Engineer
  • أبريل 2023

بكالوريوس, B.Sc. of Electrical Power and Machines,
  • في Faculty Of Engineering, Cairo University
  • سبتمبر 2012

Specialties & Skills

Cost Control
Budgeting
microsoft project
Primavera P6
Planning and scheduling
CONSTRUCTION
DERIVATIVES
METHANOL
FORECASTING
FOURGEN COMPUTER-AIDED SOFTWARE ENGINEERING (CASE) TOOLS
MANAGEMENT
OSMOSIS
PRIMAVERA (SOFTWARE)
TURNKEY (BUSINESS)
WATER TREATMENT

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

نقابة المهندسين المصرية
  • عضو
  • October 2012

التدريب و الشهادات

PMP (تدريب)
معهد التدريب:
Engineering Tracks

الهوايات

  • القراءة