Work Experience

Total years of experience :23 years, 10 Months

Project control
  • February 2012 to January 2015

POWER PLANT, OIL & GAS PROJECTS:

•Erection of Gas Turbines, Generators and it’s Piping including Electricals, Instrument & Controls in power plants, oil and gas plants.

•Erection of HRSG’s(Heat Recovery Steam Generators) Modules and Harp Bundles, HP, LP Drums,

•Erections of diverter damper, by pass stacks and stacks of HRSG.

•Fabrication and erection of utility piping of power plant.

•Application of heat shrinks sleeves, Coating & wrapping for underground piping.

•Inspection of completed piping systems & attending punch list for remaining work.

•Witnessing and conducting hydro tests, pneumatic tests, leak tests etc.

•Erection of supports for piping systems.

•Tracked development / Approval of P & ID, Isometrics, Detail Drawings.

•Conducting all type of inspections such as alignment checks, punching piping/systems, witnessing pressure tests, witnessing bonder, lamination qualifications, witnessing hydro test of qualification specimens etc as per inspection test plans in piping.

•Material inspections, verification of test certificates, positive material inspections.

•Having exposure in Fabrication and installation of fiber glass pipes of GEI and Bondstrand pipes.

•Involved in pre-fabrication of RTRP spools in workshop for installation.

•Having experience in handling high pressure pipes in bonding and key lock pipes.

•Witnessing bonder and lamination qualification test in RTRP.

PROJECT MANAGEMENT.
•Monitoring piping, construction activities of the sub-contractor as per project specifications and international codes & standards.
• Monitoring Erection and Commissioning of the equipments at Site.

•Progress monitoring against schedules and verification of progress payment certificates.

•Identifying and resolving engineering Queries and tackling construction problems.

•HSE inspections, site safety walkouts and weekly assessments.

•Updating three weeks look ahead schedule and reporting.

•Verification and review of test packages, compilation of inspection reports as per Inspection test plans.

•Review of field request notes and updating comments as per site conditions.

•Leading shutdown activities including preparing schedules, monitoring, preparing plan for isolation of systems with appropriate spades blinds & purging locations.

•Interacting with operations and technical service team members of the client for tie-in isolations.
DOCUMENTATION.
Experience in preparation of construction documents with good skills in
•Preparing daily/weekly/monthly progress reports.

•Preparing overall construction schedules look ahead schedules, mobilization/de-mobilization plans, and manpower/equipment plans.

•Preparing various execution packages such as Tie-in, Hydro test etc.

at Ministry of Electricity & Water (MEW)
  • Bahrain
  • June 2010 to January 2012

Erection of power plant, refinery & petrochemical plant.
•Construction Management.
•Maintenance and Commissioning
•Quality Management

Construction Manager at ALI AL-GHANIM & SONS GROUP CO
  • Kuwait
  • January 2008 to June 2010

Job Profile
:
Worked as Construction Manager in the conversion of Open Cycle Gas turbine (OCGT) to Combined Cycle Gas Turbine (CCGT) at Meena Al-Zoor, Kuwait.


•Review Piping drawings/ isometric for the erection of Pipe Works of Main Steam, Feed Water, D.M. Water, Compressed Air, Recirculation & Dosing Pumps, Auxiliary Boiler, Condensate system.
•Erection of Pipe works including all testing’s for the above mentioned system.
•Solely responsible for all technical & financial aspects of the Project to execute smoothly to the full satisfaction of client.
•Managing the site independently to expedite the project within the desired time frame.
•Ramp Coordination & monitoring control measures for fit up & welding continuation.
•Prior arrangement & making advance preparation for fit up & welding of continuing pipe work. This includes anticipated requirement of Overhead Crane, scaffoldings, excavation, Permit to work, HSE concerns & adequate safety measures.
•Request / and making follow-ups for requirement’s such as Valves, Flanges, SPL’s Gaskets, Elbows etc. of varying size’s prior to proceeding for Fit Up schedule.
•Walk Down inspection of Piping Erection with the main client & punch creation for the remaining work

Deputy Manager at SK E & C Co
  • Kuwait
  • January 2005 to November 2007

Job Profile
:
Worked as Deputy Manager for Facilities Modernization and Up Gradation project in 10 GC’s 1, 2, 9, 10, 11, 16, 17, 19, 20, 22 & BS170

•Providing equipment supports for technical field problems.
•Dealing with contractors / internal departments for coordinating work activities.
•Studies and analyzes information about installation, repair and maintenance work as per contract documents and recommendation of Inspection. Plans installation, repair and maintenance schedule for concerned work.
•Preparation of test packages, compilation of inspection reports as per Inspection test plans.
•Materials take off and spool marking in ISO’s considering the erection possibilities.
•Conducting all type of inspections as per inspection tests plans
•Material inspections, verification of test certificates, positive material inspections.
•Preparation of maintenance reports as per maintenance plans, updating plans as per progress.
•Prepares concerned works specifications, drawings and technical data for the above facilities.
•Studies, reviews and check specifications, drawings and terms of tender documents submitted by contractors to ensure compliance with work specifications, drawings and technical data for concerned work.
•Prepare and compiles daily reports on concerned work progress. Prepares the report on work progress, manpower and equipment.
•Attends start-up and test runs of concerned units and coordinates with the operational maintenance group concerned and the contractor regarding any overhaul work problems.
•Revises drawings or related reference and specifications about system modification and equipment changes when required.
•Maintains all catalogues, drawings and related references for assigned equipment

Mechanical Engineer at AGRA
  • Kuwait
  • June 1997 to November 2004

Job Profile
:
Worked as Engineer Mechanical for Desludging, Cleaning, Repairing & Painting of Tanks (Tank Maintenance)

Experience in preparation of construction documents with good skills in
•Coordinating daily activities and progress monitoring.
•Preparing daily/weekly/monthly progress reports.
•Preparing overall construction schedules look ahead schedules, mobilization/de-mobilization plans, and manpower/equipment plans.
•Preparing various execution packages such as Tie-in, Hydro test, Hot-tap etc.
•Project control and quality control documentations.
•Preparing Field request note (FRN) & Request for instructions (RFI).
•Preparing turnover package for system completion and submitting to client.
•Reviewing client & sub-contractor queries and replying through letters.
•Preparation of Inspection test plans, Technical work instructions.
•Monitoring piping, construction and maintenance activities of the sub-contractor as per project specifications and international codes & standards.
•Progress monitoring against schedules and verification of progress payment certificates.
•Identifying and resolving engineering Queries and tackling construction problems.
•Updating three weeks look ahead schedule and reporting.
•Verification and review of test packages, compilation of inspection reports as per Inspection test plans.
•Review of field request notes and updating comments as per site conditions.
•Interacting with operations and technical service team members of the client for tie-in isolations.
•Monitoring activities as per project specifications and international codes & standards.
•Planning and scheduling of all activities.
•Assuring implementation of HSE policies and standards.
•Resolution of FRN, raising inspection requests and following its implementation.
•Reviewing work calculations, invoice payments as per progress.
•Overseeing the selection and requisition of materials for use in the project.
•Administering material requirements, reviewing quotations in line with best economical competitive offers.
•Provide Technical support for Tenders and Projects.
•Responsible for timely production of technical documentation (calculation, drawings, manuals and BOQ when required) during order stage in coordination with REUs and other suppliers.
•Provide technical advice for equipment selection and project optimization.
•Maintain detailed documentation of the project including correspondence, time sheets, progress, variation orders and turn in all required paper work and report in a timely manner to the project manager

Mechanical Engineer at Swayeh Co. Ltd
  • India
  • December 1994 to November 1996

As an engineer mechanical undersigned was responsible for the following:

•Maintenance and Commissioning of Compressors, Pumps, Generators and Heavy Construction Equipments, Transmission and Hydraulic System.
•Controlling the workshop Manpower, Machines and Materials, Controlling Maintenance and Repair procedure to expedite the overhauling and Troubleshooting of Machines and Equipments.
•Rush to the Project site on receiving information of sudden failure, ramp co-ordination, spare parts management and rectification of the trouble at spot for proper operation and Maintenance of Equipments.
•Writing Maintenance Records, Preparing Technical Reports, Allocating Job order and maintaining History-file for Equipment.
•Co-ordinate and Report to Managers of the Company for Maintenance and Repair planning improvements.
•Prior Arrangements of spare parts requirements, records keeping material controls, Employee supervision, Proper Maintenance Planning for the failure likely to happen to avoid stuck up.
•Management work scheduling, Providing Technical Assistance and Supervising the Troubleshooting to keep all Machines & Equipments in good running condition

Project Engineer at Gherzi Eastern Limited
  • India
  • July 1990 to October 1994
project engineer
  • to

mechanical undersigned was responsible for the following:

•Managing complete project, project activities, and management issues.
•Performing site meetings with clients and contractor engineers for project activities and clarifications.
•Coordinating execution of construction and fabrication works.
•Implementation of actual project on site, its supervision, work performance /quality as per standards.
•Coordination and resolving day to day technical and non tech. aspects related to project.
•Updating management with all project issues, scheduling updates.
•Inspection for Laying & Joining of Carbon steel Pipes, Medium Density Polyethylene Pipes.
•Checking quality fittings, pressure testing of the pipes.
•Testing and commissioning of the service regulators.
• Preparation of necessary documents, surveying area, providing Support / supervise feasibility studies.
•In house engineering for the projects.
•Procurement of Materials, strictly following the standards required, at competitive prices.

Education

Bachelor's degree, Mechanical
  • at Jamia Millia Islami
  • January 1990

(

Specialties & Skills

CUSTOMER RELATIONS
DOCUMENTATION
LETTERS
LOTUS NOTES
MANAGEMENT
MATERIALS MANAGEMENT
PROGRESS
QUALITY CONTROL
REPORTS

Languages

Arabic
Expert

Hobbies

  • Telling people about ALLAH and Follow the words written in Quran.