مجموع سنوات الخبرة :15 years, 7 أشهر

sr project surveyor في AJsaudi
  • المملكة العربية السعودية - الرياض
  • يناير 2019 إلى يناير 2020

Tatweer Education programs (TBC), Riyadh Group 53, KSA.

Directs or conducts surveys, prepares data, charts, plots, maps, records, and documents related to surveys, verifies the accuracy of survey data, including measurements and calculations conducted at project sites.
Ensure full inspection to specification.
Follow up all site instruction, NCR at site.
Serve as the site person responsible for coordinating the daily site survey. works. Staking Global Positioning.
Submit daily report on site survey activities as directed by the Resident Engineer / Project Manager.
Supervise and remain vigilant regarding all aspects of the survey works. Topographic surveys, Building Location Surveys, Land Development.
Respond with appropriate and necessary levels of survey works to provide quality assurance in accordance with Contract Documents.

project surveyor في ARABTECH JARDANEH
  • المملكة العربية السعودية - الرياض
  • يناير 2018 إلى يناير 2020

Tatweer Education programs (TBC), Riyadh Group 53, KSA.

 Directs or conducts surveys, prepares data, charts, plots, maps, records, and documents related to surveys, verifies the accuracy of survey data, including measurements and calculations conducted at project sites.
 Ensure full inspection to specification.
 Follow up all site instruction, NCR at site.

 Serve as the site person responsible for coordinating the daily site survey. works. Staking Global Positioning.
 Submit daily report on site survey activities as directed by the Resident Engineer / Project Manager.
 Supervise and remain vigilant regarding all aspects of the survey works. Topographic surveys, Building Location Surveys, Land Development.
 Respond with appropriate and necessary levels of survey works to provide quality assurance in accordance with Contract Documents.

Senior Land Surveyor في NKY Engineering & Architecture Project Management Consultancy, KSA
  • المملكة العربية السعودية - الرياض
  • سبتمبر 2014 إلى ديسمبر 2019

King Abdullah Project for Development of Security Services MOI KAP-2A
KSA.
 Monitor the construction work and construction site for compliance with safety standards
 Provide technical, full-time, on-site inspection of the progress and quality of the construction work performed.
 Directs or conducts surveys, prepares data, charts, plots, maps, records, and documents related to surveys, verifies the accuracy of survey data, including measurements and calculations conducted at project sites.
 Leading the surveyors team onsite
 Coordinating with the contractor surveyor for site issues
 Controls accuracy of all the survey operations carried out on the projects by survey teams of the contactors building and infrastructure.
 Ensure full inspection to specification
 Follow up all site instruction, NCR at site
 check and coordinate full project building and infrastructure setting out.

Senior Surveyor & Civil Inspector في DAR AL RIYADH Consultant Engineering & Architecture KSA.
  • المملكة العربية السعودية - الرياض
  • فبراير 2010 إلى أغسطس 2014

KAFD Zone-4 (King Abdullah Financial District city) Riyadh and Jabal Omar Development Project, Phase-2, Zone - S3 & S4: Makkah

 A multi billion Riyals development design built currently being developed in the heart of Riyadh, once completed will be the biggest hub for financial activities of the entire Gulf States. Dar Al Riyadh consultancy has been awarded 30 Parcels (Tower buildings of varying heights). This has been divided into Four Zones. Each zone have between 6 to ten Parcels. I am currently looking after Zone 4 which has Ten Parcels. I have been assigned 5 Parcels, which consists of Mix use high rise towers ranging from 21 story to 35 story Towers including One 5 Star Hotel. My role and responsibilities involved:

 Review and approval of Shop drawings prepared by Contractor for implementation on Site.
 To verify lay-out of buildings according to provided Datum.
 On Site supervision to ensure horizontal and vertical alignments with latest instruments for all structural items like slabs, columns, core walls, ramps, beams.
 Preparing of weekly and monthly Reports for surveying activities for Client.

Senior Land Surveyor في LINDNER / DEPA Interiors, UAE
  • الإمارات العربية المتحدة - دبي
  • فبراير 2009 إلى أكتوبر 2009

 Serve as the site person responsible for coordinating the daily site survey works.
 Prepare responses to the sub-Contractors when required.

 Submit daily report on site survey activities as directed to Project Manager.
 Supervise and remain vigilant regarding all aspects of the survey works.
 Coordinate with the consultant for any survey works.
 Observe the safety procedures followed by the Client and consultants.
 Traversing Survey, Topographical Survey.
 Calculation of vertical & horizontal alignment.
 Layout of substation, water pipe line, link roads to substation.
 Dealing with sub-contractors, client & consultant.
 The land title surveys, Boundary Surveys, horizontal and vertical control Surveys. Land planning Survey. Land Development Surveys, staking Global Positioning.

Senior Land Surveyor في DUTCO BALFOUR BEATY LLC, UAE
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2008 إلى فبراير 2009

 Doing topographic Survey using Leica GPS GNSS 1200 inside the Dry Dock doing Traversing work and adjusting the traverse, Setting out of Core walls for the Building, Verticality Checking by using Optical Plummet machine, Checking the setting out and cut off levels of piling work as a consultant surveyor, giving levels for bulk excavations and Roof Slab Leveling by Invert Staff.
 All kind of survey work traversing Survey, sating out & calculations.
 Layout pipe line at tender drawing, supervision & control Surveyors team.
 Layout of substation, water pipe line, link roads to substation.
 Dealing with sub-contractors, client & consultant.
 The land title surveys, Boundary Surveys, horizontal and vertical control Surveys.
 Topographic surveys, Building Location Surveys.
 Foundation Location Surveys, Utility and Pipeline Surveys, Land planning Survey.
 Road and utility design surveys, Subdivision.
 Surveys, construction staking Global Positioning.
 Provide assistance site Engineer/ site surveyors and report Project manager.
 Calculate levels and coordinates prepare necessary site repots and calculations for site surveyors.

Senior Project Surveyor في SAUDI TUMPANE Co Ltd, KSA
  • المملكة العربية السعودية - جدة
  • أكتوبر 2006 إلى يونيو 2008

1. The Shuaibah Phase-3 IWPP Project (the “Project”) is the first of the IW(P)Ps developed in Saudi Arabia and represents a major development in Saudi Arabia’s water and power sector to help satisfy the increasing national demand for power and water. The Project serves as a template for similar undertakings by Water & Electricity Company (“WEC”). Shuaibah Phase-3 IWPP has been developed by Saudi Malaysian Water Electricity Company (SAMAWEC) which owns 60 % of the Project Company. The project is currently on full production.
2. The Project is based on BOO (Build, Own & Operate) basis under a 20 year PWPA agreement for the design, construction, commissioning, testing, ownership, operation and maintenance of a new 900 MW, light crude oil-fired power and 880, 000 m3/day (194 MIGD) desalination plant and associated facilities based on about 80:20 debt to equity project financing.
3. The Project is located adjacent to the existing SWCC Shoaiba power and desalination complex 110 km south of Jeddah, on the western coast of Saudi Arabia.
4. The project serves the water requirements of Makkah, Jeddah, Taif and Al-Baha cities and the electrical requirement of Western Electricity grid.
Industrial Wastewater Treatment Plant (IWTP) at Jubail.
The project calls for expansion of Industrial Wastewater Treatment Plant 8 (IWTP 8) at Jubail Industrial City, Phase 3.

The expansion will add 55, 000 cubic metres per day (cm/d). Waste water from Jubail Industrial City is collected through a pipe line network into 220 Lift stations and 58 Pump Stations Industrial

Supervisor في MAQBOOL ASSOCIATES PVT LTD PAKISTAN
  • باكستان - كراتشي
  • يناير 2004 إلى مارس 2005

 Construction of Grade Separated Intersection at shahrah-e-Faisal & Korangi Road Intersection (F.T.C Flyover)

 My Responsibility is coordination and supervision of their workers. provide schedules for their workers and assign tasks to construction laborers. coordinated. Supervisors translate blueprints into plans, organizing the equipment and manpower necessary to complete the project. I’m also responsible for maintaining safety and quality standards, as well as keeping detailed records of construction site activities.

Project Surveyor في GOVT OF PUNJAB IRRIGATION & POWER DEPT PAKISTAN
  • باكستان - سيالكوت
  • مارس 2003 إلى يناير 2004

 Chenab Canal, Head Marala Rehabilitation of Upper Chenab Canal, Head Marala Project Sialkot, Pakistan.

Surveyor في NATIONAL LGISTICS CELL PAKISTAN
  • غير ذلك
  • يوليو 2002 إلى فبراير 2003

الخلفية التعليمية

دبلوم, civil surveyor
  • في 1. Diploma in Surveying Qureshi Technical Centre, Punjab Board Of Technical Education Lahore, Pakist
  • يناير 2002

Specialties & Skills

اللغات

الانجليزية
متوسط
العربية
متوسط
الأوردو
متمرّس