Khalid Saeed Malik, Interface Manager / Associate Utilities

Khalid Saeed Malik

Interface Manager / Associate Utilities

WSP Middle East Qatar

Lieu
Qatar - Doha
Éducation
Etudes secondaires ou équivalent, Water and Wastewater Engineering
Expérience
35 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 7 Mois

Interface Manager / Associate Utilities à WSP Middle East Qatar
  • Qatar - Doha
  • Je travaille ici depuis juin 2014

Managing interfaces between the various design teams and the construction teams for the track works of People Mover System (PMS) (Light Rail) Project for Education City Qatar. Project Cost 500 Million USD

Associate Utilities à WSP Middle East
  • Qatar - Doha
  • octobre 2012 à juin 2014

From: Oct. 2012 To date
Employer: WSP Middle East (www.wspgroup.com)
Position: Associate Utilities

• Manage a multidisciplinary team of Engineers and sub-consultants for the delivery of utilities infrastructure design projects in Qatar
• Manage client interface
• Manage approvals/NOC obtaining process
• Participate in business development activities
• Provide construction support

Current Projects:
Ashghal Contract 2 Qatar North Local Roads and Drainage Projects and Ashghal Contract 3 (buildings department) utilities assessment and reports.

Projects and Design Manager à Tenix Australia Pvt. Ltd
  • Australie
  • octobre 2011 à octobre 2012

From: Oct. 2011 Oct. 2012
Employer: Tenix Australia Pvt. Ltd. (www.tenix.com)
Position: Projects Design Manager

• Prepare design plans/programmes and manage the whole design process involving in-house design team and sub-consultants
• Manage client input
• Manage construction input and provide construction support to construction teams
• Vendor evaluation and selection for equipment supplies for construction
• Manage design quality and performance outcomes and ensure designs are adequate for construction
• Safety in Design/HAZOP, sustainability and technical reviews of deliverables including technical reports, technical specifications, data sheets and drawings

Projects completed:
Cannonvale and Proserpine Sewage Treatment Plants (MBR and SBR respectively) - $45 Million

Project Manager à COWI A/S
  • Qatar - Doha
  • novembre 2010 à octobre 2011

From: Nov. 2010 To: Oct. 2011
Employer: COWI A/S Qatar (www.cowi.com)
Position: Design Manager

• Management of in-house project design team and design consultants for three Design and Build contracts for providing sewerage networks (approx. 270 km) for Musaimeer and Ain Khalid areas in Doha
• Overall responsibility for design reviews, approvals and issuing of construction drawings
• Constructability review and providing technical support to the field staff for construction
• Interpretation and resolution of D & C contractual issues
• Project Cost: 250 Million US$
• Participation in business development activities

Technical Support Manager (Acting) from Nov à Haya Water Oman
  • novembre 2009 à novembre 2010

Position: Technical Support Manager (Acting) from Nov. 2009 to Nov. 2010
Managing/Leading a team of in-house senior professionals and external Consultants for: • Designing and tendering of all Haya Water Projects
• Planning and phasing of rehabilitation/renewal projects
• Provision of professional/technical services to construction/site activities and other departments
• Review of roading and other utilities designs for issuing Haya NOCs

Setting the team's tasks/targets and facilitating/mentoring the team members to complete their tasks/targets professionally and on time.

Managing Design Consultants for concept, preliminary and detailed designs, Value Management, HAZOP for pumping stations and Sewage Treatment Plant (STP), financial modelling, EIA, consents/approvals/NOCs, preparation of four construction tender packages, tender cost estimation, tender evaluations and contract negotiations/awards for Al Amerat Wastewater Project. Project Cost: 500 Million US$

Senior Project Engineer Haya Water à Managing Design Consultants
  • juillet 2004 à septembre 2009

Senior Project Engineer Haya Water from July 2004 to Sept. 2009

Project Manager of a Design & Build Contract for the construction of vacuum wastewater collection networks for A'Seeb coastal area (Muscat) . The project involved 270 km of vacuum sewers, 10 vacuum stations and 8500 property connections. Contract Cost: 226 Million US$

Managing Design Consultants for concept, preliminary and detailed designs, value management, financial modelling, EIA, consents/approvals/NOCs, prequalification of contractors, preparation of five construction tender packages (2 for gravity/treated effluent networks, 1 for vacuum sewers and 1 for Pumping Stations and Sewage Treatment Plants), tender cost estimation, tender evaluations and contract negotiations/awards for A'Seeb Wastewater Project. Cost of project: 1 Billion US$.

Prequalification, terms of reference and tendering for the engagement of design and construction supervision consultants for the above project.

Preparation of a tender package for Al Ansab 1 & 4, Darsait and Ruwi Wastewater Project: for appointment of design and construction supervision consultants. Estimated cost of project: 52 Million US$.

Wastewater Project Engineer à Water Services, North Shore City Council
  • Nouvelle Zélande
  • mars 2000 à juillet 2004

From: Mar 2000 To: July 2004
Employer: Water Services, North Shore City Council, New Zealand (currently Auckland Council)
Position: Wastewater Project Engineer

Planning of the capital works design, resource consents (environmental impact assessments and permits) and construction programs to meet the annual plan requirements of Water Services Department.
Ensuring that the capital programs were implemented to meet long-term needs by using best project and program management processes.
Ensuring that the delivery of the capital projects for the Water Services networks met the customer and environmental performance outcomes.
Developing and sustaining customer service and key relationships to ensure good long term and day-to-day outcomes for the City.

Project Management of the following significant projects (including planning, design, consents/permits, construction, commissioning and hand-over to Operations Department):
• Wairau wastewater storage tank (Capacity = 6500m3) a fully automated tank to prevent wet weather overflows. Construction completed in June 2004. US$ 5 Million
• Trunk Sewer 4A (TS4A) - Construction of approximately 1 km of 900mm dia sewer with microtunneling using polycrete pipes. US $ 4.2 Million
• Several projects related to wastewater pumping stations including Health & Safety Improvements, Ventilation Systems, Access Security System, Odour Control Systems, Noise Control, Backflow Prevention compliance and Seismic strengthening of pumping stations super structures. US$1 Million
• Trunk Sewer 10 (TS 10) Augmentation. Construction of 650mm i/d, 432m long concrete sewer by trenchless and open trench methods. US$420, 000
• Trunk Sewer 6 (TS 6) Upgrade. Re-lining of existing 570mm i/d concrete sewer with 500mm o/d SDR 17 PE pipe by slip-lining. US$200, 000
• Upgrade of three existing Trunk Wastewater Pumping Stations (PS 7 Alma Rd., PS 9 Mairangi Bay and PS 56 Shea Terrace) . US$345, 000
• Sulphur Beach Wastewater Storage Tank. US$150, 000
• Trunk Sewer (TS 27) Oteha Valley Rd. Albany US$450, 000
• Maunganui Rd. Storage tank - Accessway construction and tank rehabilitation. US $200, 000
• Flow Meters Installation at 8 Trunk Pumping Stations.US$150, 000
• Inlet Sewers Upgrade for Pumping Station 9 at Mairangi Bay. US$165, 000

Resident Engineer à Engineering General Consultants Ltd
  • Pakistan - Lahore
  • mars 1998 à octobre 1998

From: 03/98 To: 10/98
Employer: Engineering General Consultants Ltd. Pakistan
Position: Resident Engineer

As Resident Engineer for the augmentation of water supply for scattered areas of Lahore city, completed the construction of 14 deep wells (each with a pumping capacity of 113 l/s and depth up to 200m) with associated pumping stations and network connections. US $ 0.7 Million

Assistant Director Punjab Rural Water Supply & Sanitation (PRWSS) Project à Public Health Engineering Department
  • Inde
  • mars 1996 à février 1998

From: 03/96 To: 02/98
Employer: Public Health Engineering Department (PHED), Punjab, Pakistan
Position: Assistant Director Punjab Rural Water Supply & Sanitation (PRWSS) Project.
As Sub-Divisional head of an independent site office with almost fifty staff, project managed the planning, design and construction of many water supply and sewerage/drainage schemes.

Management of institutional strengthening of the organization by supervising the local and foreign consultants for the preparation of water supply and sewerage engineering designs and estimates, design and construction manuals, design criteria and specifications enhancements, development of Management Information System (MIS)

PRWSS project was sponsored and funded by Asian Development Bank (ADB) . Total project cost: US$60 Million

Civil & Environmental Engineer à Summit Grade Ltd
  • Thaïlande
  • septembre 1994 à août 1995

From: 9/94 To: 8/95
Employer: Summit Grade Ltd. Part. Thailand
Position: Civil & Environmental Engineer

Project Management for the construction of 1m dia, 45km long (MS) steel water supply pipeline.

Project Management for the preparation of a bid package for EPC/turnkey construction of Nongkhaem-Phasicharoen and Ratburana wastewater treatment plant and sewage reticulation system in coordination with six joint venture companies; a project of Bangkok Metropolitan Administration (BMA) Department with an estimated cost of 280 Million US$.

Design of wastewater treatment plant with a capacity of 28, 000m3/d for Pattaya city.

Assistant Engineer (Planning & Design) à Public Health Engineering Department, Punjab, Pakistan
  • Inde
  • octobre 1993 à août 1994

From: 10/93 To: 8/94
Employer: Public Health Engineering Department, Punjab, Pakistan
Position: Assistant Engineer (Planning & Design)

Project management of feasibility study and reporting on Punjab rural water supply and sanitation (PRWSS) sector development with Wardrop Inc. of Canada and local consultants. Ensuring viability of the proposals for constructing water supply and sewerage facilities for their planning, design and estimation.

Sanitation Department Manager à Saur Thai Co., Ltd
  • Thaïlande
  • février 1993 à septembre 1993

From: 2/93 To: 9/93
Employer: Saur Thai Co., Ltd. Thailand
Position: Sanitation Department Manager

Construction supervision of wastewater infrastructure works (sewers, pumping stations and sewage treatment plant) and the stormwater network (storm drains, lifting stations and balancing lagoons) for Muang Thong Thani, a new town located near Bangkok Airport comprising an anticipated population of 150, 000. Commissioning of the above-mentioned works in collaboration with the consultant and contractor: cost of project US$ 20 Million.

Environmental Consultant à Clean Technology Co
  • Thaïlande
  • juin 1992 à janvier 1993

Please see attached CV

Project management à Clean Technology Co. Thailand
  • Thaïlande
  • septembre 1990 à mai 1992

Project management for the design of extended aeration wastewater treatment plant for Rajvithi hospital, Bangkok with a peak daily flow of 4000 m3/d; estimated project cost of 3.6 million US$.
Researching and reporting on the treatment of wastewater generated by National Starch Industries of Thailand; using Anaerobic/Oxic (A/O) process with bench scale reactors.
Preliminary designs and cost estimates for various projects for proposal purposes.

From: 9/90 To: 5/92
Full time student of master of engineering and Research Assistant at Asian Institute of Technology, Bangkok

Sub-Divisional Engineer/ Assistant Engineer (Planning&Design) à Public Health Engineering Department, Punjab, Pakistan
  • Inde
  • octobre 1987 à août 1990

From: 10/87 To: 8/90
Employer: Public Health Engineering Department, Punjab, Pakistan
Position: Sub-Divisional Engineer/ Assistant Engineer (Planning&Design)
Construction management of Shujabad sewerage and water supply schemes covering a town of 100, 000 persons and many associated villages.

Scrutinized and checked plans, designs and estimates for various water supply and sewerage/drainage projects for several villages and towns of the Punjab province.

Junior Engineer à Water & Power Development Authority
  • Pakistan
  • juin 1987 à octobre 1987

From: 6/87 To: 10/87
Employer: Water & Power Development Authority (WAPDA)
Position: Junior Engineer

Training on design, hydraulics, and construction & monitoring of large dams at Water Wing Technical Training Institute at Terbela Dam site.

Junior Engineer à National Engineering Services of Pakistan
  • Pakistan
  • novembre 1986 à mai 1987

Geometric design of roads for Farms to Market Roads Project.

Éducation

Etudes secondaires ou équivalent, Water and Wastewater Engineering
  • à Asian Institute of Technology
  • avril 1992

• M. Engg. (Apr. 1992) from Asian Institute of Technology, Bangkok, Thailand (major in Water and Wastewater Engineering)

Master,
  • à Asian Institute of Technology, Thailand
  • avril 1992
Baccalauréat, Civil Engineering
  • à University of Engineering & Technology
  • septembre 1986

• B.Sc. Civil Engineering (Sept. 1986) from University of Engineering & Technology, Lahore, Pakistan

Specialties & Skills

Environmental
Infrastructure Projects
Project Management
mANAGEMENT
ENGINEER
ESTIMATION
PROJECT ENGINEER
TREATMENT PLANTS
WASTEWATER
WATER SUPPLY
Project Management

Langues

Thaï
Débutant
Anglais
Expert

Adhésions

Institution of Professional Engineers New Zealand (MIPENZ)
  • Chartered Professional Engineer
  • June 2004
Associate Member of Australian Institute of Project Management (AAIPM)
  • Member
  • September 2012