Kirankumar Parmar, Contractor Coordinator in Maintenance

Kirankumar Parmar

Contractor Coordinator in Maintenance

Petrochemical Conversion Company

البلد
الهند - فادودارا
التعليم
دبلوم,
الخبرة
6 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :6 years, 3 أشهر

Contractor Coordinator in Maintenance في Petrochemical Conversion Company
  • المملكة العربية السعودية - الجبيل
  • ديسمبر 2006 إلى فبراير 2013

Currently working in PCC (Petrochemical Conversion Company) Jubail, KSA as Coordinator (maintenance) from Sept.2012
PCC is owned by Chevron Phillips and SIIG.

Manufacturing Team Member في SABIC Innovative Plastics Ind. Pvt. Ltd
  • الهند - فادودارا
  • ديسمبر 2006 إلى سبتمبر 2012

Principal Accountabilities
➢ Coordinating the plant/Utility maintenance and Project work.
➢ Ensuring complete maintenance services (preventive, breakdown and predictive) for the capital equipment, undertaking enhancements to reduce downtime and incidence of repetitive parts failure.
➢ Supervising the contract workers, maintaining discipline and ensuring their positive contribution
➢ Part of P & E (Projects and Execution) Team, accountable for executing work as per requirement of company.
➢ Making PM plans for equipment maintenance, LOTO procedures for individual equipments,
➢ Implementing Lean-Kaizen process related to Maintenance, production and EHS.
➢ Key member of Global Star Program (H & S system)
Environment, Health & Safety
➢ Ensuring adherence to Safety, Environment and Health standards in all functional areas.
➢ Conducting job safety analysis for ensuring safe and accident free operations and achieved Zero defects from EHS & Legal point of view.
➢ Incident/Accident process reporting, and helping in complete investigation and documentation.
➢ Implementation of work permit systems,
➢ Member of LOTO (Lock Out Tag Out), Job Safety Analysis, High Risk Operation (HRO)
➢ Preparing Standard Operating Procedure.
Significant Achievements
➢ Received three management awards for excellent work.
➢ Team member of LEAN-longs & fines project. Whose key responsibility is implementing steps and methods to reduce COT.
➢ Team member of LEAN- process stop reduction team whose key responsibility is implementing steps and methods to reduce process stops.
Major Projects
➢ Errection and commissioning of new line ZSK 40 line with 250 kg/hr granulation capacity.
➢ Carried out end to end project execution of RO-DM plant, Nitrogen plant, Co2 plant installation
➢ Implementation of PSM related projects like rupture disc provision in DCS system, sensor provision in Heaf ducting etc.
➢ Carried out the Installation of Atlas copco make screw compressor.

الخلفية التعليمية

دبلوم,
  • في M.S.University Baroda
  • يوليو 2006

Diploma in Mechanical engineering From Polytechnic, M.S.University, Baroda with in 2006

Specialties & Skills

Equipment Maintenance
Compounding
Mechanical Analysis
ACCOUNTABLE FOR
COMPOUNDING
CONTINUOUS IMPROVEMENT
DOCUMENTATION
EQUIPMENT MAINTENANCE
MAINTENANCE

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الغوجاراتية
متمرّس
المراتي
متوسط
العربية
مبتدئ

العضويات

SABIC Innovative Plastics Ind. Pvt. Ltd.
  • Manufacturing Team Member
  • December 2006
LOTO (Lock Out Tag Out), Job Safety Analysis, High Risk Operation (HRO)
  • Member
  • December 2006
Petrochemical Conversion Company
  • Coordinator (Maintenance)
  • September 2012
Petrochemical Conversion Company
  • PSSR (Pre startup safety review)
  • September 2012

التدريب و الشهادات

Forklift safe operation (تدريب)
معهد التدريب:
Forklift Academy of India
تاريخ الدورة:
January 2010
Vibration Measurement and analysis (تدريب)
معهد التدريب:
MEIRC SAUDI AREBIA
تاريخ الدورة:
January 2013