KRISHNAKUMAR راماكريشنان, Production Planning And Control

KRISHNAKUMAR راماكريشنان

Production Planning And Control

Motherson Automotive Technologies & Engineering

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Automobile Engineering
الخبرات
16 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 10 أشهر

Production Planning And Control في Motherson Automotive Technologies & Engineering
  • الهند - تشيناي
  • يناير 2014 إلى أبريل 2017

As a Production Planning Engineer. The Main responsibilities include preparing production plan & schedule for weekly and daily basis as per customer’s requirement, Project Tracking, Resource allocation, Man hour estimation, Material Handling and Controlling, Sub contract handling, and follow ups for expediting & MIS reporting for higher authorities. Receiving orders from the client and preparing budget for machines, materials and consumables on yearly basis. Maintaining 4M. I am a good team player, work as part of a team and collaborating very well with other team members. I have good communication skills, and am able to think strategically to ensure that projects are delivered on time and on budget.

Project Engineer في Nivi Elevators
  • الهند - تشيناي
  • فبراير 2013 إلى ديسمبر 2013

As a Project Engineer Responsible for Installation, Testing and Commissioning & Maintenance of Escalators and Moving Walks. Responsible for site coordination with the Main Contractor and Other Subcontractor. Attending Site Coordination Meetings. Responsible for raising Trouble Reports to principals on technical matters. Responsible for handling re-construction, Investigation & Technical Query received from principals. Responsible for safety related matters at site .Planning of work process and arranging of facilities at site. Supervision of installation works. Control of materials and manpower at site. Checking of materials received at site. Taking corrective and preventive measures at site. Reporting to Installation Manager regarding progress, field staff welfare & safety. Responsible for stage-wise inspection and co-ordination with QA/QC Dept. Responsible for reporting / identifying any non-conformance related to product. To Furnishing site reports to the Installation Manager.

Purchase Executive في Core Plasto Enterprises
  • الهند - تشيناي
  • مارس 2011 إلى يناير 2013

As a purchase executive I manage and report day- to-day functioning of the purchasing department, which calls for complete visibility on Open Purchase and Job Work Orders, Quotations, Pending Receipt - Suppliers/Subcontractor etc. Developing long-term partnership with suppliers; negotiating contracts and managing day-to-day supplier performance to ensure meeting of service, delivery and quality norms. Conducting supplier’s audits on a regular basis to measure supplier performance against Contractual standards and implement necessary corrective action. Conduct meeting with vendors to resolve pending issues.(Two vendors per month). Liaising and negotiating on rate with vendors for timely procurement of materials.
Cost reduction activities initiated by consolidating vendor base, negotiating with vendors and process improvements at vendor place. trying alternate materials and processes, increasing no. of cavities and standardizing raw materials. Implemented cost saving measures to achieve substantial reduction in terms of raw materials, transport solutions and clearances ensuring compliance of various quality measures.

Material Engineer في United Industries
  • الهند - تشيناي
  • يونيو 2009 إلى فبراير 2011

As a Material Engineer Receiving they materials as per document, Raw material received by invoice Qty To Preparing for GRN, Material should be place in specific location, Maintain for 5s & 3c in stores, Stock level indication for FIFO BOARD, Every day cross verify inventory (perceptual inventory), Raw material issued by PPC PLAN, Material stock taken every end of month, Raw material maintain FIFO SEQUENCE, Raw material stock every day reporting to MD. To full fill the ISO/TS - 16949:2002 System Requirement such as 3C, 5S Maintenance, etc. Controlled receipt of materials from vendor through dynamic day wise schedules. Streamlined stores operations to ensure optimum inventory levels, maintain stock accuracy and quick issue to production.
Made vendors to maintain minimum inventory at their end and reduced inventory at our plant resulting in saving of inventory value and space. Conducting routine inspection & stock audits to ensure reconciliation of physical stock at the warehouse; carrying out disposal of surplus/ obsolete stock.

production Engineer في Sri Mugambigai Industries
  • الهند - تشيناي
  • يوليو 2000 إلى مايو 2009

As a Production Engineer to maintains staff by recruiting, selecting, orienting, and training employees; developing personal growth opportunities. Maintains work flow by monitoring steps of the process; setting processing variables; observing control points and equipment; monitoring personnel and resources; studying methods; implementing cost reductions; developing reporting procedures and systems; facilitating corrections to malfunctions within process control points; initiating and fostering a spirit of cooperation within and between departments. Completes production plan by scheduling and assigning personnel; accomplishing work results; establishing priorities; monitoring progress; revising schedules; resolving problems; reporting results of the processing flow on shift production summaries. Maintains quality service by establishing and enforcing organization standards. Ensures operation of equipment by calling for repairs; evaluating new equipment and techniques.

الخلفية التعليمية

بكالوريوس, Automobile Engineering
  • في Madras institute of Technology, Anna University
  • مايو 2009

دبلوم, Mechanical Engineering
  • في Sri Balaji Polytechnic
  • أبريل 2000

Specialties & Skills

AUTOMOTIVE
BUDGETING
CAD AND CAM
CONTRACT MANAGEMENT
COST CONTROL
DELIVERY
HYDRAULICS
INVENTORY MANAGEMENT

اللغات

الانجليزية
متمرّس
التاميلية
متمرّس
الهندية
مبتدئ

التدريب و الشهادات

ISO 9001 2008 QMS (الشهادة)
تاريخ الدورة:
August 2011
CAD AND CAM (تدريب)
معهد التدريب:
Central Institute Of Plastics Engineering & Technology
تاريخ الدورة:
November 2012
المدة:
400 ساعة
MECHATRONICS (Hydraulics & Pneumatics ) (تدريب)
معهد التدريب:
Advanced Training Institute
تاريخ الدورة:
January 2012
المدة:
80 ساعة
CNC MACHINES ( Programming & Practice) (تدريب)
معهد التدريب:
Central Polytechnic
تاريخ الدورة:
December 2001
المدة:
64 ساعة

الهوايات

  • Playing Cricket
  • Reading books