Splicer
Al-Falak
Total years of experience :11 years, 7 Months
• Monitors and supervise technicians during the implementation inside plant (ISP) IT, Saudi Aramco wide projects.
• Conducts project site survey (Data Canter) documentations of various active Equipment (Transmission, switches, data and power), passive termination devices (MDF and ODF), Data/Voice Node, Power Panel, CPE (Customer Premises Equipment) and transmission media and connectors used at Telecommunication Room/Data Room of Saudi Aramco as scope of their ISP network upgrade for the whole kingdom of Saudi Arabia.
• Conducts field inspection and investigation in any areas in case of any complaint in installation and recommend to construction manager for proper actions to be done.
• Prepares daily, weekly and monthly accomplishment report.
• Prepares as-built and red line drawings of completed Fiber and Copper installation projects.
• Interface with other discipline personnel to streamline the construction activities.
• Inspects equipment of telecommunication room fiber optic connectivity utp/tp cable organizing.
• Installation/pulling of fiber optic and copper cable.
• Testing of fiber optic cable before laying, after laying and after splicing.
• Splicing of 24F, 48F, 96F using fusion machine (Fujikura 60s, 70s).
• End to end attenuation loss testing and continuity testing using light source/power meter (Expo).
Industrial Electronics Technician Capitol Institute of Technician I HEREBY certify that the above information are true and correct to the best of my knowledge and belief. LOUIE ARIAS DEVARAS Applicant