construction manager
Salini impregilo
مجموع سنوات الخبرة :18 years, 10 أشهر
Project : Meydan 1 Mall project
The project develops 280, 000 square meters through the excavations and building of the sub- and super-structures for the complex, including the foundations for a ski slope and the concrete support for the steel structure above the Mall.
- Client: Meydan
- Consultant: AE7
- Position: Construction Manager
Project: Doha Metro Redline north
- Client: Qatar Rail
- Consultant: Jacobs
Job Role:
- Supervision on concrete and civil works at site.
- Technical evaluation and Reporting.
- Ensuring quality as per specification.
- Ensuring all safety regulation at site.
Project
Bujagali Hydropower Project (250MW) Run-Of-River plant on the river Nile near the town of Jinja.
Description:
The facility will use the power of falling water from a 30m dam to generate electricity. Major project components include earth fill dam across Victoria Nile with intake and power house structure
Client: Republic Of Uganda
Consultant: Fichtner
Position: Structure Engineer
Job Role:
- Coordination between the technical office and the site activities.
- Following the installation of the structures as per drawings and specification and hand over to the client.
- Supervision on all the concrete works in the site.
- Responsible for preparing the steel reinforcement in the steel yard.
- Responsible for installing the steel reinforcement for all the structures.
- Responsible for the carpentry workshop.
Project
- Renovation of the Italian Embassy in Kampala the capital of Uganda
(Turnkey project of 6 months duration)
Job Role:
- Supervision on all MEP works
- Supervision on all finishing works including floorings, ceilings, walls, Joinery and furnishing.
Project location:
Comprehensive Improvements of the Parallel Roads Contract R881/2C- Dubai
Description
The project involves the construction of precast segmented and cast in situ bridges to allow free flow of traffic for high volumes of traffic that will access new developments such as world trade center.
The total cost of the project is 900 million AED.
Client: Road and Transportation Authority (RTA)
Consultant: Parsons De Leuw Cather Overseas Limited
Position: Structure Engineer
Job Role:
- Coordination between the technical office and the site activities.
- Following the installation of the structures as per drawings and specification and hand over to the consultant and to the client.
- Supervision on all the concrete works in the site from the deep foundation (piles), excavation, pile caps, piers up to the bridge deck
Project location:
New Ain-Shams Academic Hospital
Description:
The Project Involves the construction of a hospital occupying 800 beds at the center of Cairo the capital of Egypt
Client: Ministry Of Health
Consultant: Shaker consultancy group
Position: Site Engineer