Project Engineer
Electric Power Systems Engineering Company
Total des années d'expérience :17 years, 4 Mois
As Projects Engineer, participated in these projects during this duration:
Load Flow and Short Circuit study for Suez Oil Company (SUCO) in Z/B Filed at Gabal El Zeit
Power Optimization Project for Rasheed Petroleum Company (RASHPETco) including the following activities:
- MV cable routing and cable sections
- Control cable routing and cable sections
- Lighting cable routing
- Earthing layout
- Lighting layouts and block diagrams design
- Distribution panel design
AL Shabab (8 x 125 MW) and Damietta (4 x 125 MW) Simple Cycles Gas Turbines Power Plants
- MV Switchgear design (Specs, BOQ and CAD Drawings).
- LV Switchgear (MCC) design (Specs, BOQ and CAD Drawings).
- Overall Single line Diagram for the power station.
- Cable Sizing (MV and LV).
- Auxiliary Transformers Sizing.
- Cable Schedules and Tagging.
- Cable Routing.
- Participated in Load Flow and Short Circuit Calculations on ETAP.
Karama Power Plant (Qarun Petroleum Company) (6 x 4.1 MW) Simple Cycle Gas Turbine Power Plant
- Main SLD design review
- MV Switchgear bid evaluation
- MV Switchgear design review
- LV Switchgear design review
- Black Start Diesel bid evaluation
- MV & LV cables design review
East Oweinat Diesel Power Stations (3 x 4 MW)
* at Office
- Layout Design and drawing
- Single Line Diagram Design and drawing
- Tender specifications preparation and conceptual design.
- Design review for Electrical Systems (Step Up transformer, auxiliary transformer, MV SWG, MCC, MV Cables, LV Cables, Earthing system, DC system, Lighting, … )
- Factory Tests for Switchgear and Transformers.
- Project management and provide technical support to the site.
* at Site
- Supervision on electrical erections (MV SWG, MCC, auxiliary transformers connections, Step Up Transformers, Cables laying, cable connections, connections for mechanical auxiliaries, earthing system, lightning System, Emergency lighting, Common lighting for interiors and outdoor lighting)
- Commissioning and Testing for electrical Equipment :
• Meggering for transformers and cables
• Generator Protection Relay (Diff., SC, OC, EP, UV, OV, UF and OF)
• Diesel Engine Protections (Over speed, Lube oil, Bearing Temp., Cooling Water)
• Checking for alarms signals
- Preparing the weekly project progress reports
- Preparing the Monthly project Electrical Erection Invoice
Southern Sudan Diesel Power Plants
• Wau diesel Power station extension (2x1.2 MW)
• (Bor, Rumbek & Yambio) Diesel Power Stations (6x1.4 MW)
* at Office
Responsible for
- Design review for Electrical Systems (Generator, MV SWG, MCC, Cables, auxiliary systems, DC system...)
- Preparing of monthly progress reports
- Reviewing the contractor invoices
- Project management and provide technical support to the site.
* at Site
• through three periods in southern sudan
May 2008 Wau diesel Power station extension (2x1.2 MW)
March 2009 Bor diesel Power Stations (2x1.4 MW)
May 2010 Yambio diesel Power Stations (2x1.4 MW)
- Supervision on electrical erections (MV SWG, MCC, auxiliary transformers connections, Cables laying, cable connections, connections for mechanical auxiliaries, earthing system, lighting)
- Attended the commissioning and tests for (diesel engine units and their electrical and mechanical auxiliaries including generator inspection, switchgears, diesel engine sensors, cables testing, motors rotation, … )
- MV and LV Networks surveying.
- Preparing the weekly project progress reports
Zaafarana Wind Farms (JBIC Project) (120MW)
- Design Electrical programs for Cables (SC, Voltage drop &Power Loss) Calculations
- In site (cable testing, SWG and kiosks inspections)
- Factory Tests for project electrical equipment (transformers, cables, ..... )