Maaz Bin Abid Kamalvi, Manager Electrical

Maaz Bin Abid Kamalvi

Manager Electrical

Islamabad Group of Companies, Pakistan

البلد
باكستان - لاهور
التعليم
بكالوريوس, BS (Electrical Engineering)
الخبرات
15 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 4 أشهر

Manager Electrical في Islamabad Group of Companies, Pakistan
  • باكستان - إسلام أباد
  • أشغل هذه الوظيفة منذ ديسمبر 2015

• Reporting to Managing Director.
• To handle all Electrical and Diesel Generators related matters.
• Recently completed fully automated layer unit with M/s BIG DUTCHMAN, Designed the complete unit i.e., Power house, Main panels, MCC, power and control cables selection, Prepare BOQ and ensured material deliveries accordingly. Successfully executed and commissioned the whole unit in all aspects related to E&I.
• Operation and maintenance of generators (CATERPILLAR, CUMMINS, PERKINS, JOHN-DEERE and VOLVO) having capacities of 30 KVA to 1 MW.
• Supervision of 208KW on grid solar project consists of Huawei Sun 2000 (110KW) Inverters and Jinko 545W Solar Panels.
• Currently working on 4MW solar projects at different sites based on power purchase agreement.
• Implemented Energy efficiency techniques to save electrical cost.
• Coordinate with DISCO’s (Electrical supply companies) in case of any problem such as: Power failure, Electricity Bills, Meter problem, legal matters etc.
• Maintenance of transformers at all sites.
• To look after all purchase related matters to electrical department

Sr. Project Engineer في AMS Power and Industrial Engineering
  • باكستان - لاهور
  • أكتوبر 2014 إلى ديسمبر 2015

I worked on EPC project of 14.5MW cogen power plant.

My areas of experience includes:

•Working as project in charge for E&I activities.
•Review electrical and instrumentation related details of Wartsila L9W34DF and CAT C175-20 gensets
•To review/analyze all technical details given in tender documents
•After reviewing Prepare shop drawings accordingly.
•Review the design and coordinate with consultant, client, and engine supplier for execution.
•Preparation of Electrical Layouts Like Electrical Equipment Layout, Earthing Mesh Layout, Engine Hall & M.V Room Lighting, Equipment Earthing, Cable Trays, Control Room etc.
•Execution of Earthing mesh in M.V Room and Engine Hall with CAD weld.
•Preparation of BOQ for Cable Trays with accessories, Earthing, CAD Weld material, M.V/L.V Cables, Control Cables, Cables termination accessories, Lighting material and other equipments etc and give go ahead to procurement team for further action.
•To prepare termination plan for M.V, L.V and control cables.
•Project scheduling/planning in accordance with procurement data.
•To prepare technical submittals according to approved manufacturer list.
•Arrange samples as per consultant/client requirements.
•To ensure the execution of complete job according to design.
•To raise RFIT (request for inspection/testing) after execution of respective job.
•To prepare daily progress report, with reference to DPR analyze the daily work scenario and take remedy action immediately where required (Like manpower, ensure material availability, Transportation of material etc.).
•Coordination with all other MEPs during shop drawing preparation and execution phase.
•Testing of all electrical equipment according to standards.
•Installation and Testing of CAT EMCP-4.2
•Installation, Testing and commissioning of WARTSILA CFA, CFC, BJA, BFA panels.
•Supervision of M.V cables laying/testing/termination kits.
•Installation, Testing and commissioning of L.V panels according to standards.

Sr. Electrical and Instrumentation Engineer في Sitara Chemicals Industries Limited
  • باكستان - فيصل أباد
  • يونيو 2010 إلى أكتوبر 2014

• Worked as E&I project engineer for installation of new 135 MT caustic soda plant.
• To ensure smooth operation and maintenance of 132/11KV Grid station at Sitara chemical.
• To prepare maintenance schedule of grid station and plan shutdown jobs.
• Installation and testing of 20/26MVA transformer and SF-6 breaker of 3100A.
• Setting of Micom 121&127 O/c, E/f relays according to requirement.
• Maintenance and troubleshooting of 11KV V.C.B’s Areva PIX model.
• Operation and maintenance of MCC’s with motor control and power circuits upto motor rating of 200KW.
• To prepare daily load report and monthly energy report to monitor energy consumption at whole plant.
• To ensure the preparation of daily motor performance sheet and plan the maintenance schedule accordingly.
• Motor starter circuits design and troubleshooting.
• Installation, testing and commissioning of SUPCON DCS with more then 1000 I/O’s.
• Programming and Troubleshooting of SUPCON DCS.
• Installation and troubleshooting of SIEMENS S-7 300 PLCs.
• Programming of SIEMENS S7-300 PLC using SIMATIC MANAGER.
• Programming of SIEMENS S7-200 PLC in MICROWIN.
• Programming of Mitsubishi alpha series PLC.
• HMI programming in PROTOOL and WINCC FLEXIBLE.
• Programming of PIC, ATMEL and Motorolla microcontrollers using C language.
• Relay logic circuit design.
• Thorough knowledge of ABB inverters.
• 14 KA, 16 KA and 13KA, 480V DC Rectifiers maintenance and troubleshooting (i.e Thyristors, Thyristor Gate driver and gate pulse generator cards).
• Automation and control of different field instruments used in process industry, such as (Valves, RTD, Thermocouples, Level transmitters, Flow Transmitters, Pressure switches etc.).

Transformer Design and testing Engineer في AB Ampere PVT Limited
  • باكستان - لاهور
  • مارس 2009 إلى يونيو 2010

My areas of experience includes :

• Complete designing of transformer according to customer requirement and IEC standards.
• Material planning for transformer manufacturing
• Aware of all IEC standards regarding to transformer design
• Complete testing of transformer i.e. Impulse Test, Short Circuit Test, Temperature Rise Test, High Voltage Test, Induced Over Voltage Test, No Load and Full Load Test etc. according to requirements.
• Worked as team leader in complete transformer manufacturing process
• Supervision of complete manufacturing of transformers at different stages i.e. Core cutting, H.T & L.T Winding, Core-Coil Assembly, Tank designing, Painting and Testing.
• Also worked here as ISO 9001:2008 coordinator and successfully implemented it.

الخلفية التعليمية

بكالوريوس, BS (Electrical Engineering)
  • في University Of Lahore
  • نوفمبر 2008

I have done my my 4 years BS Electrical Engineering with specialization in electrical and electronics.

Specialties & Skills

Project Management
Electrical Design
Maintenance Services
PLC/DCS Programming
MS Office
Project Execution
Designing
Electrical Maintenance
AutoCAD
Electronics
Electrical Engineering
Electrical Testing
Electrical Controls
Project Management

اللغات

الانجليزية
متوسط
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Registered Engineer
  • May 2009

التدريب و الشهادات

Registered Engineer (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
January 9999

الهوايات

  • Playing Cricket, Internet, Technical Content, Watching T.V, Tourism.