magdy fathy hammam abou alkheer, Environmental

magdy fathy hammam abou alkheer

Environmental

Civil Engineering Consulting Center

Location
Egypt
Education
Higher diploma, civil engineer
Experience
36 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :36 years, 5 Months

Environmental at Civil Engineering Consulting Center
  • My current job since August 2006
Project Manager / Sr.Project Manager / Avp Projects (Building Projects) at Aljazeera project company for contractor
  • Saudi Arabia - Alqunfithah
  • April 2015 to January 2016

Center of Civil Engineering For Research & Studies (CCERS)
Faculty of Engineering - Cairo University. Project :Alazhary Sewage Project Beny Suef Governorate-Egypt The Total Cost Of Construction Is LE24.00Millon.
Which contains:-
Under gravity pipe lines(V.C.- -uP.V.C ), Pump station and three under crossing of 2200m.m R.C. Pipes Tunnels to pass ductile Pipe line of dia.500m.m under railway, roads and canals
The Funding Agencies: American Agency for International Development. Owner :Beny Suef Economic General Authority For Water And
Sanitation (BEGAWS).
Contractor

Project at Chemonics Egypt. Dr Ahmed
  • January 2005 to August 2006

El-Marg Potable water purification plant
With a total production mass 600, 000 m3/day and with overall cost 600 million L.E
The water treatment plant is located in Elmarg and the intakes located on El-Ismailya water canal. The project, with estimated area is 450m X 50 m consists of:

New intake 2Ø1800 mm for raw water beside the existing intake of Moustorod water treatment plant.
Raw water pumping station beside the new intake with 8 pumps 1350 l/s each (6 working and 2 stand by)
2Ø1800 mm prestresed concrete pipes to convey the raw water to the treatment plant with overall length 14 km.
6 clarifiers, 2 distributors and 20 filters with up to date technology are assigned to treat the raw water.
Ground reservoir.
Chemical and Chlorination buildings
treated water pumping station with 8 pumps 1200 l/s each (6 working and 2 stand by)
scum collecting tank
1Ø1000 mm ductile iron line with overall length 4 km to discharge the scum to El-Ismailya water canal in case it is forbidden to discharge by gravity on filters.

Project at Engineering Consulting Bureau DR. Zaher Abdalla Consulting Engineering
  • August 1996 to December 2003

Gable El-Asfar Village Waste Water Project. Which contain:-
Under gravity pipe lines (V.C.-R.C.-uP.V.C ), Pump station and two under crossing of 2200m.m R.C. Pipes Tunnel to pass ductile Pipe line of dia.900&100m.m under railway
Owner: The Organization Of The Execution Of The Greater
Cairo &Alexandria Potable And Waste Water Projects .

Resident Engineer at Naser General Contracting (HASSAN M. ALLAM)
  • September 1992 to August 1996
Field Engineer at The Nile General Company for Reinforced Concrete (SPECO)
  • July 1991 to September 1992
Consultant at Egyptian Italian consultant office ( Egytalic)
  • July 1989 to July 1991
Supervisor Engineer
  • January 1987 to July 1989

Through this period worked in military department of contractors, bids and tender for the armed forces projects.

Consultant at The world bank (International Development Association (I D A)
  • to

Engineering And Administration.
Project : Sohag Rural Development Project.
This project involves caring out sub-projects such as: -
infrastructure projects.ِِ A-
1-Sanitation scheme using oxidation ditch technology.
2-Integral system for potable water.
3-Covering canals in inhabitant areas.
B-The human development projects.
1-Schools
2-Rural Hospitals Health Centers
3-Women center clubs.
The funding agencies

Infrastructure specialist at International Food &Agricultural Development (IFAD)
  • to

.A member of teem work named technical Assistance Unit (T.A.S.).
1-Responsible for preparing bids documents, sharing in evaluate offers committee, negotiate contracts, Follows up progress of projects and permit payment certificates
2-T.A.S. submitted detailed quarter reports for the Funding Agencies (IDA & IDFA) review, summarizing Project Operations and utilization of Project funds - TAS will maintain and monitor the cost of sub- projects and physical works.
3-T.A.S. would be responsible for monitoring the efficiency and quality of sub-projects evaluation system.

Project at AMBRIC
  • to

Gabal El-Asfar Wast Water Treatment Plant Contract (16/2) The
Contract Is Join Venture Between Hassan Allam and Two Italian Companies (ANSCO AND FOCHI)
Plant Is Made To Treat One Million Cubic Meter Of Sewage Per Day.
Owner :The Organization Of The Execution Of The Greater Cairo &
Alexandria Potable And Waste Water Projects.
Consultant: The Consultant Is The American

Project Shared
  • to

Participated in executing of:-

Extension of delta steel mill company, Moulding units, Automatic casting

units, And its Auxiliaries. Also the net of industrial disposal

Owner at Delta Steel Mill Company, Moustored
  • United Arab Emirates
  • to
Project at Engineering Consulting Bureau DR.Zaher Abdalla Consulting Engineering
  • to

Improving of sanitation of EL- shorfa, EL-Nozha and Nor EL-
zalam cities.
Owner: The Organization Of The Execution Of The Greater
Cairo &Alexandria Potable And Waste Water Projects.

Education

Higher diploma, civil engineer
  • at Faculty of Engineering Ain Shames University
  • August 1991

حاصل على دبلوم الدراسات العليا قى الهندسة الانشائية مدة الدراسة سنتين انتظام

Bachelor's degree, Structural
  • at Engineering .Ain Shames University
  • January 1991

In

High school or equivalent, Civil Engineering
  • at Zagazig University
  • January 1986

.

High school or equivalent, Civil Engineering
  • at Zagazig University
  • January 1986

.

Specialties & Skills

civil engineer
تنفيذ محطات المياه والصرف والشبكات
ASSETS RECOVERY
CONSULTING
CONTRACT MANAGEMENT
ENGINEERING
MICROSOFT OFFICE
RESEARCH

Languages

Arabic
Expert
English
Intermediate
Italian
Beginner

Memberships

نقابة المهندسين
  • 580/13
  • September 1986