Principal Planning Engineer
Al‐Marasem International For Development
Total years of experience :13 years, 4 Months
-Preparing or reviewing/assessing the baseline time schedules loaded with resources.
- Follow up project time schedule and assign resources.
- Make resources leveling according to project requirements and cash flow.
- Preparing Progress Reports (Weekly & Monthly Reports) _ (XER - Excel).
Preparing, or reviewing/assessing the baseline time schedules loaded with
resources, doing or reviewing the periodical/regular updates and follow‐up.
Make Time schedule, updates and cost control for any construction project in all phases, all tasks obvious in detailed in my CV
Preparing Master and detailed Time Schedules for Engineering &Construction Stages and
allocate all resources and make cash flow by using Primavera 6 .
- Collect Data through Site visits and prepare project time status.
- Preparing Time Schedule Updates & evaluate actual vs. target.
- Meeting held every month with CEO of RME and discusses with me monthly Cost Report
and our Current position on Time Schedule according to our performance.
- Preparing Progress Reports (Daily, Weekly & Monthly Reports and submitted to limak Insaat).
- Cost control (Loss analysis & periodically Cost Forecasting).
- Handel in a lot of Works For Technical Office
Make time schedule for “ Sludge Lagoons & Supernatened underground Tank”
- Preparing Master and detailed Time Schedules for Engineering &Construction Stages.
- Collect Data through Site visits and prepare project time status.
- Preparing Time Schedule Updates & evaluate actual vs. target.
- Preparing Progress Reports (Daily, Weekly & Monthly Reports).
- Member in weekly meeting.
- Quantity Surveying based on B.O.Q.
- Advice Required Resources.
- Preparing cash flow.
- Cost control ( Loss analysis & Periodically Cost Forecasting ).
Assist in Quality Control.
Engineering Education - Mattaria, Helwan University, May 2011. - Project: ( project management) Make Schedule time and Update for Embaba Airport Project by using Primavera (6) (Grade: very good) - Graduation Grade: good (74.4 %)