Maged Rezkalla, Technical Manager (Acting Operation Manager)

Maged Rezkalla

Technical Manager (Acting Operation Manager)

Mace Group

Lieu
Qatar - Doha
Éducation
Etudes secondaires ou équivalent, Electrical Power and Machines Engineering
Expérience
25 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :25 years, 11 Mois

Technical Manager (Acting Operation Manager) à Mace Group
  • Qatar - Doha
  • Je travaille ici depuis juillet 2019

Leadership and management of Hard services and soft services as per IFM-SLA and meet client satisfactions, monthly Audit, Reports, KPI, Payments, Lifecycle, Assets Managements.
• Overseeing and coordinating planning and reaction to 'Mechanical and electrical technical service' delivery for buildings, facilities and equipment across the client’s estate.
• Study, propose and apply Energy Saving which save up to QAR 1.5 million per year.
• Undertaking regular client meetings and team meetings (Technical, Soft services, and Security).
• Performance management of the FM service contractors for various hard services disciplines.
• Formulating develop and implement maintenance strategies (PPM and reactive).
• Developing and maintain technical/operational standards and quality assurance processes.
• Providing technical input into the development of the 'CAFM' system and 'FSI GO' mobility.
• Propose, prepare specs and related sketches for minor projects, including technical review, value engineering and inspect the execution of work till completion certificate.

MEP Manger à Design Management Group – DMG
  • Qatar - Doha
  • Je travaille ici depuis mars 2018

Lead MEP teams (Seniors and Inspectors) to achieve the target performance and improve KPI index (Quality and Time)
Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work to meet design and operator requirements as well.
Review bi-weekly Project Time Schedule (MEP activities) and Dashboard to ensure the construction activities within time frame and highlighting the critical activities and proper recovery plan if required
Review and approve all IPC and VO compared to Contract documents
Reviews and gives approvals for all electrical related submissions shop drawings, method statements, MEP coordination drawing, material approval and all related executed site work.
Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Ensure that BMS interface with all required system and recommended others if not mentioned in IFC specs for proper operation and avoiding lots of faults due to the unique project environment

Sr. Elec. Engineer à Arab Engineering Bureau – AEB
  • Qatar - Doha
  • mai 2012 à mars 2018

Reviews and gives approvals for all electrical related submissions shop drawings, MEP coordination drawing, material approval request, Method statement of installation, Testing and commissioning submittal, As-Built drawings and OEM manuals.
Verifies that materials, manufactured goods, machinery, equipment, etc. Supplied to the job site are in line with projects specification, local authorities requirements and granted approvals.
Directing Electrical Engineers/Inspectors team
Achieve the executed work to get authorities approval, Kahramaa substation, Transformer rooms and HV installation.
Coordinate all work for proper installation, HVAC systems, AHU’s, FCU’s, chillers, Chilled water pumps to meet project requirements and approved ACMV as per QCDD.
Service Tunnel installation supervision (Kahramaa substation, HV cables installation/trenches/tunnel ventilation and Jet Fans work.
Liaising with CS team, Client, PM, FM and contractors, when required
Review and recheck all maintenance process as a facility management after handling the project for one year warrantee.

Sr. MEP Engineer à Egyptian Consultant House (MZECH)
  • Egypte - Le Caire
  • octobre 2010 à mai 2012

Ensures that the MEP drawings are coordinated and in line with other discipline design drawings of the project prior proceeding with work and to highlight to the PM of any discrepancies for necessary actions.
Coordinate and review on time all electrical shop drawings, material submittals, WMS, RFI and close-out documents.
Reporting to PM included site progress, performance, LOGs and delay Directing MEP team to solve problems with alternative solutions at minimal cost /time impact.
Liaising with CS team, Client, PM and contractors, when required

Electrical Manager à Al-Shafar General Contracting - ASGC
  • Egypte - Alexandrie
  • octobre 2009 à octobre 2010

Management and coordination the electrical work (executed by sub-contractors) for 254 Villas,
Prepare, Review shop drawings /coordination drawings and materials submittals prior to consultant approval
Preparing the RFI, technical issue, materials required, cost control, progress report and payments certificates
Reporting to the GM daily/weekly progress/technical/payment/VO
Prepare / Reviews all electrical related shop drawings, coordination drawings, material submittals and WMS prior consultant submission.
Verifies materials, manufactured goods, machinery, equipment, etc.
Supplied to the job site are in line with projects specification, local authorities’ requirements and granted approvals.
Directing Electrical Engineers/Inspectors team and assisting in solving site problems in alternative solutions.
Providing interpretations and clarifications to RFI’s upon client/contractor requested.

Sr. Elec. Engineer à Dimensions Engineering Consultant(DEC)
  • Émirats Arabes Unis - Dubaï
  • octobre 2006 à octobre 2009

Review Design drawings before tendering stage to avoid any conflict or uncoordinated to meet Authorities’ regulation, DEWA substation
review and approve the work shop drawings and materials submittals for various projects including the follow-up and supervision of the site works according to the design drawings, specifications, standards (BS, NFPA, EN, IEE….) and authorities’ regulations (DEWA, JAFZA, Etisalate, Du and Tecom) for Dubai Projects’ and EDD (for Bahrain Projects), As following:
Twin Towers (JAL Hotel “2B+G+55+4Mech”, MUT “B+G+45+3Mech” & 2No. Parking each 2B+10), Project Cost 750M Dhs.
KG Tower in Dubai Marine, (2B+G+19), 100M Dhs, Residential
Fortune Tower in JLT, (4B+G+34+Mech), 120M Dhs, Offices
New Dubai Gate Tower in JLT, (6B+G+39+DF), 180MDhs, Residential
Fortune Executive in JLT, (4B+G+34+Mech), 120M Dhs, Offices
134 Villa (Discovery Garden), Nakheel
Barsha Complex (2 Buildings “2B+G+12+HC+RF”)
Seasons Community in JV (4 plots)
Q.Sami Tower in Business Bay (4B+G+3P+28+HC)
Landmark City View in Bahrain (G+5P+16+HC+RF)
Reef Island, Bahrain (3 Buildings”2B+G+6+RF)

Sr. Projects Eng. à Tarsheed Consultant Office (NECE)
  • Egypte - Le Caire
  • octobre 2005 à novembre 2006

Review, supervision and monitor site work of Port Ghalib District Cooling Plant (7200TOR), 160 Million LE cost (Kharafi National at Marsa Alam).
MEP Design review for Power Station of New AUC Project "Co-generation Power Station 8MVA".
Reports preparing for various factories which will modified or renovated with the cooperation of FEI sectors “Federation of Egyptian Industries” such as ECO “Environmental Compliance Office” and IMC “Industrial Modernization Center” based on surveying reports.

MEP Maintenance Engineer à Misr Invest. Co. Misr Bank Group
  • Egypte - Le Caire
  • septembre 2002 à octobre 2005

Facility management and maintenance of the bank Tower.
Achieve the bank requirements, improvement and developments, as this Tower consider the Heart of Misr Bank and Routers News Agent.
Supervision and follow-up for preventive maintenance achieved by the responsible companies Agents, like Generators "4Nos. Cummins - 720Kva", Chillers "3Nos. Carrier X500 TOR", 14Nos. Of Express Elevators (UK), Central UPS System "4*120Kva" and FA System.
Responsible and follow-up for the renovation of old systems (i.e. FA system, Busbars, Panels, ...etc.)
Replacing of 3 busduct risers 1250A/IP42 by 1250A/IP56 for 25 floor
Replacing 18 no's. Of ACB/MCCB ranges from 1200A to 5000A
Creation of central alarms panel which collect most of systems for 30 floors tower, collecting from cooling tower water tank, chillers, pumps, lift stations, domestic water tanks, etc.
Install new P/A system in conference room in 24th Floor.
Maintenance of Systems by Banks technicians like domestic water/ hot water / chilled water /condenser water pumps, boilers, suction and extract fans, electrical doors, firefighting pumps and AHU’s.

Acting Facility Manager. à Sol Y Mar for Hotels& Resorts
  • Egypte - Charm el Cheikh
  • août 1999 à septembre 2002

I was promoted from Maintenance Engineer to Acting Chief Engineer (Acting Facility Manager) for Various Hotels/resorts based on SolYMar.
Hotel/resort preventive maintenance as per annual plan, reporting to Area Chief Engineer
Finishing the 100 Rooms, 32 Chalets and Time-Share 45 Villas for Hotels Opening by the maintenance staff and outsourcing technicians.
Leading the maintenance staff for repairing the emergency cases of breakdown and achieving preventive maintenance schedules
Manag all required materials, spare parts, stock control in stores and tools for maintenance plan that's according hotels/resort budget.
Operate and maintain Hotel/resorts system and equipment like Gen-sets, Boilers, Chillers, Pumps, Fans Fire Alarm, Public Address, PABX, MATV, Swimming Pools Pumps, sewage station blowers, Water Booster Sys., SPA machines, Kitchen and Laundry Equipment.
Water treatment of swimming pool, hot water and chilled water sys.
Testing and commissioning of various Systems for soft-opining also the Grantee Certifications according contracts per each Contractor.

Sr. Elec. Engineer à ORASCOM Construction Industries "OCI"
  • Egypte - Le Caire
  • mai 2001 à septembre 2002

Responsible for electrical installation works, other discipline coordination, team supervision and monitoring to the MEP Manager.
Installation of the electrical work according to approved shop drawings with accommodate of Master Time Schedule of the project.
Installation of LV networks cables, trays, busbars, LV Boards, MV switch-gear, Transformers and ELV like, FA, PA, MATV and PABX.
Installation of Domestic Water Station, Boilers, Fire Fighting and Swimming Pool pumps rooms

Elec. Engineer à ORASCOM Projects& Tourism Developments
  • Egypte - Hurghada
  • juin 1998 à août 1999

Finishing the 100 Rooms, 32 Chalets and Time-Share 45 Villas for Hotels
Opening by the maintenance staff and outsourcing technicians.
Leading the maintenance staff for repairing the emergency cases of
breakdown and achieving preventive maintenance schedules
Manage all required materials, spare parts, stock control in stores and
tools for maintenance plan that's according hotels/resort budget.
Operate and maintain Hotel/resorts system and equipments like Gensets,

Éducation

Etudes secondaires ou équivalent, Electrical Power and Machines Engineering
  • à Cairo University
  • mai 1996

Electrical Engineering

Specialties & Skills

Electrical Engineering
Technical Coordination
Problem Solving
Electrical Maintenance
MICROSOFT OFFICE
QUARK XPRESS
ROUTERS
SUPERVISORY SKILLS
CUSTOMER RELATIONS
DIMENSIONS
DIRECTING
MACHINERY

Langues

Arabe
Expert
Anglais
Expert
Français
Expert