الخبرات
5 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 7 أشهر

Planning & Progress tracking Engineer في Jacobs Zate
  • المملكة العربية السعودية - الجبيل
  • أكتوبر 2012 إلى أكتوبر 2015

• Progress monitoring of projects on a regular basis. Anticipate and resolve any problems, bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to achieve on time or earlier deliveries to keep the project on schedule.
• Monitor progress throughout the implementation process and compare actual against planned work.
Plan and supervise the entire program of work and foresee a contract's demands in terms of work force, materials, and equipment and technical challenges.
• Review and analysis of Contractor submitted 3 week look ahead and 90 days look ahead schedule against Master project schedule and also by taking into consideration of current site conditions.
• Participant of the Work shop held for preparation of project master schedule in line with the proposal requirements through the application of the primavera P6 software.
• Follow up with contractor for project controls related issues like Schedule update, MOM, Progress Reports, Material Reports, Manpower Reports, etc. Consolidating all the reports and update the project status to the top management.
• Interface with Client, project team and sub-contractors to ensure successful project delivery.
Understand contractual matter, earn value method, familiar with scope management and change control.
• Finding the areas of concern and providing solution to top management and coordination with construction manager/ Site superintendent for site related issues.
• Perform resource planning and analysis. Forecast the demands of various types of resources including labor, materials, and equipment over the course of the project.
• Monitor material status reports against construction schedules and review them with procurement and construction manager as well as the project manager.
• Co-ordinate internal project team reviews followed by an approval and review by the client of the work schedule, progress measurement and reporting systems. Review status reports, modify schedules, plans as required & keep the management, Project director apprised of the progress on a regular basis
• Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project.
• Researched and resolved billing discrepancies.
• Documentation as per the understanding of the company procedure and maintain as per company document moment System.

Site engineer & Quantity surveyor في Proton construction LTD.
  • الهند
  • سبتمبر 2011 إلى مارس 2012

• Preparation of BOQ (Bill of quantity) for the different items like earth work, masonry, plastering, concreting, Steel work, finishing works etc…
• Taking daily site work measurement and preparation sub contractor’s bill.
• Preparation client bill and taking approval for the same from the consultants and clients.
• Site work execution for the construction of commercial and residential building as per drawings and ISI specifications.
• Drafting of billing related auto cad drawings, giving line out for the column, giving levels for the slab beam and staircases shuttering, preparing bar bending schedule (BBS) etc…
• Preparing the time schedule for the particular item of work before work commencement.
• Preparation of material reconciliation chart at end of each and every month.
• Maintaining the records of daily site work progress and reporting to the senior authority.
• Preparation of cost control chart to enhance cost requirement for the different items of work before the commencement of work.
• Interpreting clients' requirements, identifying and addressing design parameters and engineering problems and ensuring solutions are implemented.

Site engineer في Seeco construction Pvt Ltd.
  • الهند - بنغالورو
  • أكتوبر 2009 إلى سبتمبر 2011

• Site work execution for the construction of commercial and residential building as per drawings and ISI specifications.
• Supervising and coordinating project work in accordance with contract conditions, working within budget and time constraints.
• Making arrangement of labours, drafting subcontractor’s agreement and awarding contract to the nominated sub contractor.
• Preparation of technical specification for the project under turnkey basis for commercial and residential building and enhancing cost requirement for the total completion of the particular project.
• Preparation of work schedule for the project under turkey basis by using M.S excels.
• Analysis of rates for different items like earth work, concretes, steel works, masonry works, plastering, finishing work to quote rates for client prior to the agreement.
• Giving line out for the column, giving levels for the slab beam and staircases shuttering, preparing bar bending schedule for pile cap, beams and slab etc…
• Preparation of BOQ (Bill of quantity) for the different items like earth work, masonry, plastering, concreting, Steel work, finishing works etc…

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Vivekananda College of Engg
  • يناير 2009
دبلوم, Civil Engineering
  • في Karnataka polytechnic Mangalore.
  • يناير 2006
الثانوية العامة أو ما يعادلها, Karnataka Secondary Education Examination Board
  • في Sri Sharada high school, Panemangalore
  • يناير 2003
الثانوية العامة أو ما يعادلها,
  • في Institution/University

Course Institution/University Year of Passing Percentage of marks

Specialties & Skills

Site Planning
Estimates
ARCHITECTURAL
AUTO CAD
EARTH WORK
ENGINEER
ESTIMATION
MASONRY
PROGRESS
SURVEYING
Primavera P6 Professional R8.3

اللغات

الهندية
متمرّس
الملايام
متمرّس
الانجليزية
متمرّس
الكانادا
متمرّس

التدريب و الشهادات

Primavera P6 (الشهادة)
تاريخ الدورة:
September 2011
صالحة لغاية:
December 2020