mahmoiud mahmoiud, جيوفزيائي

mahmoiud mahmoiud

جيوفزيائي

داتا بتروليوم

Location
Egypt - Cairo
Education
Bachelor's degree, Geophysics
Experience
29 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 4 Months

جيوفزيائي at داتا بتروليوم
  • Egypt - Cairo
  • My current job since October 1995

Over 15 years experiences as a geophysicist. 8 years as seismic interpreter in different Oil and Gas companies in Egypt and Libya, 5 years as seismic processor in WesternGeco and 2 years in Cairo University as satellite data processor. Expert in development and exploration work to mature prospects and delineate wells for near field exploration & Development Objectives.

Senior Geophysicist at Data Petroleum Company
  • Egypt - Cairo
  • My current job since July 1995

July 2011 - Present: Senior Geophysicist in Data Petroleum Company
.
• Participating in Gravity & Magnetic Evaluation Tender & Participating in O Pool Concession 80 Study -FDP Tender AGOCO, Libya.

Senior Geophysicist at Data Petroleum
  • Egypt - Cairo
  • My current job since July 2011

 Participating in Gravity & Magnetic Evaluation Tender & Participating in O Pool Concession 80 Study -FDP Tender AGOCO, Libya.
 Complete 3D Seismic Evaluation of EGPC Bid-Round-2011-2012 & Scanning/ Vectorization of 24 seismic lines (38.000 Traces); Participating in 2D Special Seismic Re-Processing of 24 seismic lines (38.000 Traces) and Well logs digitizing of 8 wells.Sahara (SOG) Egypt.
 Responsible for inspection team to inspect HW and SW coming from WesternGeco in Cairo of complete processing system belongs to OGDCL SDP center in Islamabad

جيوفزيائي at OGDCL SDP center
  • Egypt - Cairo
  • My current job since January 1995

• Complete 3D Seismic Evaluation of EGPC Bid-Round 2011-2012 & Scanning/Vectorization of 24 seismic lines (38.000 Traces); Participating in 2D Special Seismic Re-Processing of 24 seismic lines (38.000 Traces) and Well logs digitizing of 8 wells.Sahara (SOG) Egypt.
• Responsible for inspection team to inspect HW and SW coming from WesternGeco in Cairo of complete processing system belongs to OGDCL SDP center in Islamabad,

جيوفزيائي at داتابتروليوم
  • Egypt - Cairo
  • My current job since January 1995

Over 15 years experiences as a geophysicist. 8 years as seismic interpreter in different Oil and Gas companies in Egypt and Libya, 5 years as seismic processor in WesternGeco and 2 years in Cairo University as satellite data processor. Expert in development and exploration work to mature prospects and delineate wells for near field exploration & Development Objectives.

at Zueitina B.V. Libya
  • April 2010 to June 2011

April 2010 - June 2011: Seismic Interpreter in planning Department, Zueitina B.V. Libya.
• Seismic interpreter on 2D concession called Satal bank located in Sirte Basin, concession NC29.
I was responsible to evaluate the Satal bank field using 2D seismic data.
After reinterpretation of the available data we recommend to acquire a new set of data which help us to delineate this kind of subsurface
• Seismic interpreter on 3D concession, called Sabah located in Sirte Basin, concession NC74F.
This field has more than 100 wells and I was responsible for follow up development wells, update the depth maps after acquiring new data. At the same time I was responsible to follow up new reprocessing running.

Senior Geophysicist at Zueitina B.V. Libya
  • Libya - Tripoli
  • April 2010 to June 2011

 Seismic interpreter on 3D concession, called Sabah located in Sirte Basin, concession NC74F.This field has more than 100 wells and I was responsible for follow up development wells, update the depth maps after acquiring new data. At the same time I was responsible to follow up new reprocessing running.

at Seismic Interpreter in Exploration Department, Mellitah Oil & Gas B.V. Libya
  • October 2007 to January 2010

October 2007 - January 2010: Seismic Interpreter in Exploration Department, Mellitah Oil & Gas B.V. Libya
• Seismic interpreter in 2D&3D seismic data area Bu Attifel and KK with the objective of producing maps valid as input for Static model in Concessions 82 & 100 which is highly geological complexity of the central graben marginal areas (volcanic intrusion, strik-slip faulting, wedges, pinch-out, etc.) . This work includes interpretation, evaluation of prospects, analysis of fault juxtaposition, and volumetric calculations up to writing well proposals.
• Seismic interpreter in the El feel field concession NC-174 in MURZUQ basin south of Libya.
• Responsible for the development work in Bouri field Located in block NC41 in the Libyan offshore known as the Gabes-Tripoli.Basin about 120 km from the Libyan coast at an average water depth of about 150 m. in el Bori field in the 174 concession marine data.
• Participating in acquisition design and the office operations of a 2D & 3D seismic acquisition program.
• Follow up the final processing, participation in decision maker in processing steps from the data transcription up to migration then final deliverables of the final data.
• Follow up the cross well seismic which have been done to delineate the volcanic body which replacing the sand reservoir in the area B concession 100 from the data acquisition up to the interpretation of the final data.
• Attended two TCM (Technical commute meeting)
• Was responsible for the exploration location selection resulting in oil production of 3000 bopd.

Senior Geophysicist at ENI Oil & Gas B.V. Libya
  • Libya - Tripoli
  • October 2007 to January 2010

 Seismic interpreter in 2D&3D seismic data area Bu Attifel and KK with the objective of producing maps valid as input for Static model in Concessions 82 & 100 which is highly geological complexity of the central graben marginal areas (volcanic intrusion, strik-slip faulting, wedges, pinch-out, etc.). This work includes interpretation, evaluation of prospects, analysis of fault juxtaposition, and volumetric calculations up to writing well proposals.
 Seismic interpreter in the El feel field concession NC-174 in MURZUQ basin south of Libya.
 Responsible for the development work in Bouri field Located in block NC41 in the Libyan offshore known as the Gabes-Tripoli.Basin about 120 km from the Libyan coast at an average water depth of about 150 m. in el Bori field in the 174 concession marine data.
 Participating in acquisition design and the office operations of a 2D & 3D seismic acquisition program.
 Follow up the final processing, participation in decision maker in processing steps from the data transcription up to migration then final deliverables of the final data.
 Follow up the cross well seismic which have been done to delineate the volcanic body which replacing the sand reservoir in the area B concession 100 from the data acquisition up to the interpretation of the final data.
 Attended two TCM (Technical commute meeting)
 Was responsible for the exploration location selection resulting in oil production of 3000 bopd.

QC at Exploration Department, Badr Petroleum Company (BAPETCO, a Shell
  • May 2004 to October 2007

May 2004 - October 2007: Seismic Interpreter, Exploration Department, Badr Petroleum Company (BAPETCO, a Shell joint venture)
• Seismic Interpretation of 3D seismic data located in the Western desert.During that I was responsible to write proposal for new prospect at the south from our main field and follow up the well while drilling and it was success well (17 MMscf/d at AR/E and 30 MMscf/d from lower Bahariya)
• Worked with Shell in Data Management team in order to come up with a new Western desert project of proper, clean, safe, QC, database & contain the seeds that enable the geological & the geophysical studies to propose safely some exploration & development wells
• Participated in the Field Development Plan of a new discovery after the success in new play in the Abu El-Gharadig Basin in the western desert. The work plan includes defining the main uncertainty and key risks of the interested prospects, Formulate recommendation for farther well activities, delivered the interoperated (fault, horizon and polygons) to build a fit for proper static and dynamic model.

Responsibilities: Participated in design and the office operations of a 2D & 3D seismic acquisition program, followed up the final processing, Seismic data loading using Post-Stack as well as well's data using ASCII loader and curve loader, generate Synthetic seismograms for seismic-to-well, worked on a regional project to produce maps valid as input for basin modeling, Velocity analysis and Depth conversion using different techniques Stacking velocity, Well Time Depth, Interval Velocity and V0K then calculated the uncertainty, initiated the check-shot, VSP (zero-offset and walk-away) programs to model structural and stratigraphical features, calculating Volumetrics using Fast Trak (Shell software), Petrel as well as manual calculation.

Senior Geophysicist at Shell JV (Badr Petroleum Company)
  • Egypt - Cairo
  • May 2004 to October 2007

Participated in design and the office operations of a 2D & 3D seismic acquisition program, followed up the final processing, Seismic data loading using Post-Stack as well as well’s data using ASCII loader and curve loader, generate Synthetic seismograms for seismic-to-well, worked on a regional project to produce maps valid as input for basin modeling, Velocity analysis and Depth conversion using different techniques Stacking velocity, Well Time Depth, Interval Velocity and V0K then calculated the uncertainty, initiated the check-shot, VSP (zero-offset and walk-away) programs to model structural and stratigraphical features, calculating Volumetrics using Fast Trak (Shell software), Petrel as well as manual calculation

Jenoir Geophysicist at Schlumberger (WesternGeco).
  • Egypt - Cairo
  • June 1998 to July 2003

 I have five years experience in WesternGeco at Cairo Data Processing Center and my major experience is in Seismic 3D Land Processing as:
 2D data processing, for Saudi Armco.
 3D land data processing, for BABETCO, Obayeid project.
 3D land data processing, for APACHE, North Alamein project.
 Refraction Statics for 3D project for Khalda, Khalda1998, Khalda2001, Khalda Offset, Ras Kanayes, Tarek, Ras ElHekma, Matruh East, South West Khalda, Umbarka, South Umbarka, North Umbarka, Ozoris and Cleopatra projects.
 3D land data processing, for Bed16, 15, 3 3D, BAPETCO.

Geophysicist at WesternGeco
  • Egypt
  • January 1998 to July 2003

Jan. 1998- July 2003: Geophysicist, WesternGeco.
• I have five years experience in WesternGeco at Cairo Data Processing Center and my major experience is in Seismic 3D Land Processing as: • 2D data processing, for Saudi Armco.
• 3D land data processing, for BABETCO, Obayeid project.
• 3D land data processing, for APACHE, North Alamein project.
• Refraction Statics for 3D project for Khalda, Khalda1998, Khalda2001, Khalda Offset, Ras Kanayes, Tarek, Ras ElHekma, Matruh East, South West Khalda, Umbarka, South Umbarka, North Umbarka, Ozoris and Cleopatra projects.
• 3D land data processing, for Bed16, 15, 3 3D, BAPETCO.

Geophysicist at Cairo University
  • Egypt - Cairo
  • January 1997 to January 1998

 Studied the urban invasion in the Nile delta and the rate of Mediterranean sea invasion on the Nile delta and studied the best location for constructing Cities used satellite image and Geographical Information System (GIS).

Education

Bachelor's degree, Geophysics
  • at Cairo University
  • January 1994

Specialties & Skills

Seismic
Seismic Interpretation
EXPLORATION
INTERPRETER
OPERATIONS
Seismic Processing

Languages

English
Expert
Arabic
Native Speaker