Professional Planning Engineer, Cost Control, Claims and Delays Analyst (Roads and Infrastructure)
NOOR AL SAHARA GENERAL CONTRACTING
Total years of experience :9 years, 7 Months
Preparation and Development of Master Planning, Design, Engineering, Procurement, Tender and Construction Schedules together with Associated Information Required Schedules.
Identify Stakeholder Key Tasks in the Baseline and Detailed Schedules.
Review Schedule Data - identify and acquire Information needed to complete Work Logics to interface between Project Teams.
Identify significant supporting for all Milestones and Identify and develop Critical Path for Each Project Sections and Activities. Liaise with the Project Manager and Quantity Surveyor to indicate Cost and Return Forecasts at the Agreed Payment dates and throughout the Contract.
Clarify Activities that have a Critical Impact on the Schedule; Prepare the Critical Items Action Report.
Monitor Schedule Deviations, recommend Corrective Action/Work-around any Issues that may arise to the Project Managers.
Monitoring all required Logs in project like (Materials, Shop Drawings, Method Statements, Procurement, Delivery, Sub-Contractors).
Liaise with Supplier / Sub-contractors for non-Deliveries, Quality or breached Terms & Conditions.
Liaise with Accounts for Advance Payment; provide Payment requirements for Suppliers.
Coordinate Project Activities with Subcontractors and monitors the Implementation of Subcontract Agreements in line with Programme.
Monitor & Report all Work being carried out by Project Teams and Sub-contractors to ensure Compliance with the Specifications of the Project and in a Timely Manner Through KPIs.
Responsible for Implementing Schedule and Earned Value Management (EVM) Across a Selection of Projects, in Coordination with Project Managers and Engineering Leads.
Develop Project Dashboard Reports in MS Excel, MS Power Point, or other Reporting Tools
Review the Schedules and related Documents from the Designers, Consultants and Sub-Contractors including Weekly & Monthly Reports and analyze the content to ensure compliance with Project Objectives.
Prepare Cash Flow, Manpower Histogram and Equipment Histogram with respective S-Curve.
Prepare Weekly, Mid-Month and Monthly (or any Period Agreed with the Management) Reports about the Status of Project Progress.
Prepare Recovery Work Programs in case of Delays to mitigate of Impacts of Schedule Problems and Assist in Developing Recommended Appropriate Modifications.
Participation of Monthly Valuations, Evaluation of Variations, Project Status Reports, Tender Invitation, Process & Evaluation, Evaluation and Negotiation of Suppliers Quotations.
Attend Meetings with the Client, Consultant / Project Management representative.
Maintain Awareness of Contracts Financial Status.
Job Responsibilities as Claims, and Delays Analyst
Preparing English and Arabic letters related to Delays, Obstructions, Claims and Programs.
Keep Records, includes Drawings, Field Notes, sketches, reference manuals and any other Engineering Materials and making sure that they are noted in the Contract, and that all information is dictated.
Identifying Factors Leading to Project Extension and Timely Notification of the Same to the Engineer/Client.
Review Schedules to Identify Delay and Risks and Recommend Appropriate Mitigation Actions.
Participate with Project Team in Preparation Extension of Time Claims (EOT) with Full Supportive Documents or Major Change to The Schedule & Prolongation Cost.
Handle Issues with Contracts. During each stage of development, problems with contracts can arise, and he must be able to resolve them.
Follow the Events Which Caused the Delay of the Project.
Studying the Impact of the Different Events on the Delay of the Project.
The Ability to use Different Delay Analysis Techniques for example: Impacted as Planned, Time Impacted Analysis (TIA), As Planned Vs as Built Method and Time Slice & Window Analysis Method (TSWA) Based on The SCL Protocol & AACE 29R-03.
Job Responsibilities as Professional Planning Engineer, Cost Control:
Pre-Contract
Assist in the Preparation and Management of Overview and Strategic Programs, Including Design, Procurement, Tender and Construction Schedules Together with Supporting Information Required Schedules.
Lead the Preparation of Tender, Prequalification and Project delivery plans.
Maintain a record of Tender / Project Risks, Planning Issues, Actions and Resolutions and track these to a conclusion.
Produce, develop and maintain high quality Primavera Preliminary Plans, including Contractual Milestones and other all Site Activities.
Develop Preliminary Cash Flows, Manpower Histograms for Budgeted Resources.
Post Contract
Coordinate the Preparation and Development of Master Planning, Design, Engineering, Procurement, Tender and Construction Schedules together with Associated Information Required Schedules.
Develop Project Dashboard Reports in MS Excel, MS Power Point or other Reporting Tools
Review the schedules and related documents from the Designers, Consultants and Sub-Contractors including Weekly & Monthly Reports and analyze the content to ensure compliance with Project Objectives.
Follow up on all the Construction Activities in the Sites and Ensuring that Work is done properly and in a Timely Manner.
Identify delays, Critical Path, Areas of Concern and propose Corrective action to the Project managers.
Job Responsibilities:
During This Work We Constructed a lot of Buildings and Villas in many Areas such as ( El-Shrouk - TamrHena
- AlNarges- Al Banafseg - Zahra El Lotus- Al Yasmin- El Andlus Buildings) Cities.
Construction Buildings According to the Egyptian Assembly to Secure the Civil Liability of the Dangers of Construction Work.
Planning, Scheduling and Controlling a lot of Projects by using Primavera Program
Site Supervision and Co-ordination of the Construction works.
Following the progress, creating daily report and sharing it with responsible
engineers to achieve Construction in accordance with the Contract Documents.
Monitor Staff Specialists' Field Reports and Guide Field Personnel.
Prepare and Document Design Calculations Under Principal Engineer's Direction.
Coordinate with Suppliers and Sub-contractors about Different Works
Review Design Consultants' Drawings and Integrate in Project.
Ensure Safety Goals are achieved on the project.
Understand and implement project specifications effectively.
Organize field work and communicate with large teams and Strong construction coordination knowledge and
assign technicians and staff specialists to tasks.
Follows up with the Consultant for NOCs and Building Permit.
Follows up with the subcontractor for the preparation of design, shop drawings (if needed).
Coordinates the drawings of all disciplines for consultancy.
Grade: Excellent I had published my Research Article in "International Journal of Current Engineering and Technology" INPRESSO UNITED STATES OF AMERICA (USA) and INDIA You can find my Research Article in Search Engine Google under name: "Enhanced Properties of Crumb Rubber and its Application in Rubberized Concrete"
Graduation Project: Soil Mechanics and Foundations Project Degree: Excellent The project had consisted of: (Isolated Footings- Raft Foundation- Pile Foundations - Designing Elevated Water Tank where it's Capacity 1000 m3).