Mahmoud Bakr, Electrical /  Instrumentation section head

Mahmoud Bakr

Electrical / Instrumentation section head

ARCHIRODON GROUP

Location
United Arab Emirates - Abu Dhabi
Education
Bachelor's degree, Industrial Electronic Engineer
Experience
26 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 0 Months

Electrical / Instrumentation section head at ARCHIRODON GROUP
  • United Arab Emirates - Abu Dhabi
  • My current job since August 2018

Project Value: 86000000 US $
Prepare & review all material submittal, operation & maintenance
manuals, document / drawings ( wiring, logic diagram, cable
schedule ….etc. ) to approved from the client for Electrical,
instrumentation & control system and Fire Alarm System
Supervision of erection, Pre-commissioning, commissioning &
Startup, operation for all Electrical, instruments, control valves and
control system (PLC & DCS systems ) and Fire Alarm & Gas
Systems, hand over the plant to the client .

QA/QC Engineer at 2012 ARCHIRODON GROUP
  • January 2010 to April 2010

PAKEG- 5A
Project Value: 285000000US $
• Preparation of quality documents (Inspection and Test Plant
(ITP's) for Electrical & Instrumentation activities, preparing all
the required forms for inspection process. All construction
activity method statement, quality control plans, Certificates,
Qualification… etc.
• Prepare all material submittal, operation & maintenance
manuals, document / drawings ( wiring, logic diagram,
cable schedule ….etc. ) to approved from the client for
instrumentation & control system and Fire Alarm System
• Supervision of erection, Pre-commissioning,
commissioning & Startup, operation for all instruments,
control valves and control system ( PLC & DCS systems )
and Fire Alarm System
• Prepare all As-Built Document /Drawing for
instrumentation &control Systems and Fire Alarm System &
Gas Systems

Instrumentation Engineer at ARCHIRODON GROUP
  • United Arab Emirates
  • October 2006 to January 2010

FGD PROJECT in SWCC power plant in Jeddah stage 4
Project Value: 81000000 US $
❖ Prepare logic diagram, loop diagram, I/O list, and cable
schedule for five Electrostatic Precipitators along with soot
conveying system, duct works, dampers, booster fans, two
new Flue Gas Desulphurization units, new seawater
pumping station, & blower house.
❖ Installation of five Electrostatic Precipitators along with soot
conveying system, duct works, dampers, booster fans and
4 | 8
CV-Mahmoud Bakr-4th January 2019
associated control system.
❖ Installation of two new Flue Gas Desulphurization Plant
(capacity 900, 000 Nm3/Hr with 90% overall removal of
SO2) to handle five existing boilers and up gradation of
two existing stacks.
❖ Construction of new seawater pumping station, & blower
house, post reaction chamber, Electrical Distribution
system and associated control systems.
❖ Installation of new DCS (ABB-Hartmann Symphony DCS)
and HMI for the new FGD plants and interface with the
existing DCS and Honeywell Boiler Control Systems.
❖ Preparation of quality documents (Inspection and Test
Plant (ITP's) for Electrical & instrumentation activities,
preparing all the required forms for inspection process. All
construction activity method statement, quality control
plans, Certificates, Qualification… etc.)
❖ . Prepare, study and evaluation all technical / Price
tenders specification for instrumentation, control valves
and control system " DCS - PLC " by the update
technology and Fire Alarm System
❖ - Design and Check all PID’s, loop diagram and function
analysis according process description.
❖ Prepare all material submittal, operation & maintenance
manuals, training courses to the client and document /
drawings ( wiring, logic diagram, cable schedule …hook-
up ….etc. ) to approved from the client for instrumentation
& control system and Fire Alarm System.
❖ Supervision of erection, commissioning, Startup,
operation for all instruments, control valves and control
system ( PLC & DCS systems ) and Fire Alarm System
Prepare all As-Built Document /Drawing for instrumentation &control
Systems and Fire Alarm System

  • July 2006 to December 2009
at Armant cane sugar
  • July 2006 to December 2009
at Egyptian Sugar and Integrated Industrial company -ESIIC - Egyp
  • January 1997 to September 2006
at Salman Farsy Factories cane sugar
  • September 2004 to December 2004
Instrumentation Engineer at N/A
  • United Arab Emirates
  • December 2003 to September 2004

Main technical office - in Hawamdia city
Project Value:

section head at Electrical and I&C ) OIL& GAS YST
  • to January 2004
Export at OIL& GAS YANBU
  • to January 2004

TERMINAL SP-7 (
YASREF )
Electro-Mechanical EPC Project
Project Value: 150000000US $
• Preparation of quality documents (Inspection and Test Plant
(ITP's) for Electrical & Instrumentation activities, preparing all
the required forms for inspection process. All construction
activity method statement, quality control plans, Certificates,
Qualification… etc.
• Prepare all material submittal, operation & maintenance
manuals, document / drawings ( wiring, logic diagram,
cable schedule ….etc. ) to approved from the client for
instrumentation & control system and Fire Alarm System
• Supervision of erection, Pre-commissioning,
commissioning & Startup, operation for all instruments,
control valves and control system ( PLC & DCS systems )
and Fire Alarm System & Gas Systems
• Prepare all As-Built Document /Drawing for
instrumentation & control Systems and Fire Alarm System &
Gas Systems

  • to January 2004
  • January 2001 to January 2002

PLC system

at ABB Elsag Bailey / Krohne / Endress + Hausser
  • January 1997 to January 1999

PCC / Auma / ARCA, Control valves and INFI 90 Bailey DCS
system equipment in Egypt as :-
a) Abo Korkas Beet Sugar Factories

at Delta Beet Sugar
  • January 1997 to January 1998
Programmer at Alamag Group
  • Saudi Arabia
  • October 1992 to December 1996
Programmer at EGYPTIAN ARMY - Egyp
  • October 1989 to April 1992
Mechanical construction Project at ARCHIRODON GROUP
  • United Arab Emirates
  • to

Onshore / Offshore ( 9
clusters )
Supervision of erection, Pre-commissioning, commissioning &
Startup, operation for all Electrical, instruments, hydraulic / electric
control valves and control system ( DCS systems ) and Fire Alarm
& Gas Systems, hand over the plant to the client .

section head at ARCHIRODON GROUP
  • United Arab Emirates
  • to

Facilities Phase

Education

Bachelor's degree, Industrial Electronic Engineer
  • at Bsc of industrial electronic engineer
  • January 1989

Specialties & Skills

Field Operations
Systems Review
Fire Alarm
Job Design
Logic Programming
CABLEADO
CUSTOMER RELATIONS
SPECIFICATION
SUPERVISORY SKILLS
GRAPHIC DESIGN
HUMAN RESOURCES

Languages

Arabic
Expert
English
Expert