petroleum geology
Badr el-din petroleum company
Total years of experience :10 years, 11 Months
Participation in the evaluation of the cementing calculations that also includes pipe capacity calculations and volume height math, plug landing pressure etc. Also, Equipment lay-out rig up / rig down operations on locations, Operation of mixing equipment, cement pumping, centrifugal pumps. Maintenance of the Cement Pump truck and data acquisition devices attached to the treating lines.
Grade: Very good with honor, (Rank: 9th). (CGPA: 3.33)