Senior Electrical Engineer at ECG Engineering Consultants Group
  • Qatar
  • My current job since July 2012

Review the contract documents and advises the Project Manager of any deficiency.
• Review Contractor's submittals and ensure its compliance with concept design, contract requirements and properly coordinated with other disciplines.
•Review shop drawings and ensure its compliance with design requirements, contract requirements, properly coordinated with other disciplines and submitted as per the approved schedules.
•Review and approval of Materials ensuring compliance with contract requirements and submitted as per approved Project Construction schedule. Any deviation from the project specification shall be notified to the Project Manager.
•Regular visits to the Project site to ensure the quality of work follows contract requirements, good construction practice, only approved materials are used, compliance with shop drawings, and report any deviations to Project Manager.
•Make sure that the Contractor has submitted the Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP) before starting the relevant activity. Inspection & Test Plans and other Quality Verification Forms address all necessary information outlined in the project specification or the Manufacturer recommendations.
•Review and approval of Method Statement (MS), Quality Control Procedure (QCP) and Inspection & Test Plan (ITP) as submitted by the Contractor and ensure its compliance with all contract requirements.
•Monitor the work being taken by site Engineers and site Inspectors, taking any necessary remedial action to ensure full compliance with Contract Documents, Specifications, Method of Statements, Policies, and Procedures. Resolving any unexpected technical difficulties and other problems that may arise.
•Ensure that work practices are compliant with policies and procedures i.e. local labor laws and safety procedures taking appropriate corrective action and/or reporting where non-compliance is identified.
•Coordinate with COMPANY Senior QA Engineer to establish the intervention point in the proposed Inspection and Test Plan.
•Technical support and assessment to Contracts Engineer and Cost Engineer of Trend Notices approved variations and claims (when raised by Contractor).
•Advice PMT Quality and Safety Engineers as well as Project Manager of noticed non-compliance cases during site visits.
•Regular spot checks of material delivered to the site and direct the relevant Inspector/ Engineer to continue inspection of stored materials on-site to ensure it is as per approved materials and in good condition.
•Closely monitor inspector/engineer performance and advises the Project Manager in case of deficiency or poor performance.
•Attend Technical Meetings with Contractors, and Weekly Progress Meetings if required by Project Manager.
•Ensure full coordination between all other disciplines / Trades has been carried out for all External and Internal MEP services.
•Take a decision related to the conflicts between proposed material samples and literature submitted by contractors against the contract specification, drawings, BOQ and costing.
•Review spare parts, operation & maintenance manuals of trades related to his discipline and ensure compliance with contract requirements.
•Participate with PMC disciplines in reviewing the Closeout Report as submitted by the CONTRACTOR.
•Review As-Built drawings submitted by the Contractor. The as-built drawing shall be properly coordinated with the site Inspection Team to make sure that it matches all site changes.
•Witness pre-commissioning & commissioning activities and ensure full compliance with project requirements.
•Make sure that any non-conformity has been reported through a Non-Conformance Report (NCR). All NCRs shall be coordinated with the PMT Senior Quality Assurance Engineer.
•Verifies that all designs, drawings, and documents are to current codes and standards and following organization policies and standards.
•Review and presents the Contractors Valuation Payments for final approval by Project Manager.
•Witness and supervises commissioning and start-up activities. Assists in preparing the Final Acceptance and Completion Report.

Electrical Engineer at ECG Engineering Consultants Group
  • Egypt
  • December 2009 to June 2012

Responsible for inspecting the installation of electrical systems and equipment to detect faulty wiring and ensure they comply with electrical codes and standards, Visits construction sites, perform inspection and make recommendations for improvement.
Primary responsibilities
•Examine electrical systems and equipment.
•Inspect new and existing sound and security systems, wiring, lighting, motors, and generating equipment.
•Inspect the installation of the electrical wiring for heating and air-conditioning systems, appliances, and other components.
•Keep records and write reports.
•Report findings to contractors or government agencies.
•Report violations.
•Stop the construction of non-compliant installations.
•Examine and inspect wire harnesses, control panels, coaxial cables, and electrical jig boards, for completeness of assembly, quality, and conformance to blueprints. •
•Inspect wiring of assemblies for accuracy of stripping, soldering, and crimping, and for defects.
•Look for frayed wires and loose connections.
•Test continuity.
•Compile inspection reports.
•Write up recommendations for improvement.
•Verify wire and cable length.
•Examine parts and assemblies.

Projects Handled
•Doha Live project, Doha Live is a unique modern lifestyle destination in Doha, Qatar fusing a 5-Star design hotel with retail, dining, and leisure located in Najma district and consists of a multi-story building with six basement car parks with total built-up area 40000 m2
•PHCC supervision consultancy services for construction, testing and commissioning of CCTV Control Room at Seventeen (17) Health Centers, This project is a new CCTV control room at seventeen (17) health center to include all disciplines pertinent to construction & installation services as well as post-construction commissioning services.
•Design and built Al Wakra Souq Wakif Hotel 1& 2 is located within the boundaries of Al Wakra Heritage village, project consists of (2) Heritage Hotels, This hotel is a renovation for a part of the heritage houses of Al Wakra village to turn it into a five stars Heritage theme hotel and preserve the heritage theme of the buildings.
•North Gate Mall is a major new development by the busy North Road in Doha. The project consists of a shopping center with 280 shops including five anchor stores, a state of the art screen Cineplex. The varied shop types including, jewelry, fashion, sports, electronics and supermarket, family and fine dining and a crystal garden full of luxury shops, landscaped terrace with pavilions, and 4, 000 parking spaces. Imagined as a northern gateway to the city, North Gate aspires to the top of the market in Qatar and the Middle East
•Souq Wakif Boutique Hotel Supervision Works. The Project is mainly refurbishment of and existing old Building in Souq Wakif, in which the Concept is already produced by Mr. /s Highness, who is a subsidiary of Al Khayyatt. The New Hotel will be of a very high standard with only 17 Suites/Rooms.
•Lekhwiya sports stadium. The Lekhwiya Sports Stadium Project consists of the design and build of a 10, 000 seat Football Stadium and 4 No. Training Fields and associated Roads, Parking and Infrastructure as well as the future development of a Hotel, Fitness Centre and Multipurpose Hall. The project’s scope of works is divided into several phases, consisting of various elements as detailed belo
Phase 1:
10, 000 seat Football Stadium.
Phase 2:
Roads & Walkways. 2, 406 No. Car parking. 4 No. Training Fields. Mosque. Centralized Utility Building. Sewage Treatment Plant. 6 No. Electrical Substations. 2 No. Changing Rooms. Hard and soft landscape
•10 schools -Ashgal, the project consists of 18 Classrooms, Art Rooms, Laboratories, Auditorium, Assembly Hall, Indoor & Outdoor Sports Courts with all other amenities and necessary facilities. The project is being constructed with high-quality finishing materials and fully compliance with Fire Safety Standards.
•4 Residential Building - Awqaf. The Scope of Construction works covers the construction, completion, and maintenance of those works known as (WAQF - 128) Residential Buildings for the General Directorate of Endowments AWQAF. The Project comprises of construction of Residential Buildings

Education

Bachelor's degree, Electrical Power and Computer Control Engineering
  • at Arab Academy for Science and Technology
  • November 2019

MS in Strategic Management Implementation of Defensive Strategy in Construction Industry

Specialties & Skills

Electrical
CONCEPT DEVELOPMENT
MATERIALS MANAGEMENT
QUALITY
CONTRACT MANAGEMENT
ENGINEERING
GRAPHIC DESIGN
MEETING FACILITATION
POLICY ANALYSIS

Languages

Arabic
Native Speaker
English
Expert

Training and Certifications

MBA (Certificate)
Date Attended:
April 2019

Hobbies

  • Listening To Music
  • Squash
  • Reading