محمود جمعه, Projects Director

محمود جمعه

Projects Director

United Contracting & General Supplies Co

البلد
مصر
التعليم
ماجستير,
الخبرات
30 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 years, 3 أشهر

Projects Director في United Contracting & General Supplies Co
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ سبتمبر 2020

Won excellent contacts in the market including strong ties with clients and various engineers.
* Upholds positive outlook in work profile thus, perform projects on time and at highest quality.

  • فبراير 2016 إلى يونيو 2016
Project Manager في Qatar Rail Company
  • قطر
  • فبراير 2016 إلى يونيو 2016

Project Title: Doha Metro - Giga project with budget more than 15 billion us dollar
• Brief: - the project consists of 3 Underground, Elevated and at Grade a metro lines as following
project with budget more than 15 billion us dollars
• Brief: - the project consists of 3 Underground, Elevated and at Grade a metro lines as follow
Red Line: - contain from: -
underground metro line 28 km boring by (TBM) and 10 under ground station the average foot print area
20, 500 m2 per station.
Elevated & at Grade section 14.331 km included Via duct and Bridges and 3 Elevated Station the average
foot print area 14, 700 m2 per station & one at Grade station total Area 10, 785 m2 & one Elevated and at
Grade station total Area 8, 482 m2 .
Gold Line: - contain from: -
underground metro line 11 km boring by (TBM) and 9 under ground station the average foot print area
22, 258 m2 per station.
Green Line: - contain from: -
underground metro line 17 km boring by (TBM) and 6 under ground station the average foot print area
33, 600 m2 per station.
Elevated & at Grade section 3.065 km included Via duct and Bridges and one Elevated Station the
average foot print area 10, 688 m2
Main duties as follow: - supervision of all construction activities and Coordinate and sharing with the
different department as follow :
Technical & Planning of Program construction teams to study and accept the construction Method of
statement
PMO to do, the 8 Steps to Earned Value Analysis as follow:
Determine Planned Value (PV), Determine Earned Value (EV), Obtain Actual Cost (AC), Calculate
Schedule Variance (SV)., Calculate Cost Variance (CV), Calculate Other Status Indicators (SPI, CPI, EAC,
ETC, and TCPI ), Compile Results
Program construction teams for each lines to study and analysis contractor claim for EOT ( Extension of
Time )
Change dept., technical dept. and PMO to study and evaluate the Request for change and scope control
requested by employer and contractor
Commercial dept. and contract admin dept. to study and review the assessment of claim or variation
order submitted by contractor and study and evaluate the Employer claim based on the awarded
contract
Tender and evaluation dept. to study and prepare the pre-tender Estimate (PTE) for all tender by QR and
other expected Rail Extension ( Green line Extension & Red line Extension ) also for other government
project like new Doha slaughterhouse, fish market & vegetable market

Sr. Project Manager في Combined Group Contracting Company
  • قطر
  • سبتمبر 2013 إلى فبراير 2016

Project Title: Arab Canter for Research & policy study (DOHA INSTITUTE), contract Amounts QAR 880 m
Contact Value = 880, 000, 000 QR Client: PEO Consultant: ACE
* Brief: The project contains the buildings: -
PHASE ( 1 ) Administration building ( G +F ), Academic building ( G + 2F ), Culture Foundation ( G +F ),
Library ( G + M +2F ), University Life ( 1 ) \{ G +F / Consists of ( swimming pool, sauna, squash, tunes
court, cafeteria, offices & rooms \}, University Life ( 2 ) \{ G + F \}, University Life ( 3 ) \{ G \}, Gust House ( G+
2 F ) Hotel for 50 gust
All these buildings above one Basement contain
3 substations + main kitchen + fire pump rooms + fire command centre + data centre rooms \{IT rooms,
security room & BMS WITH CCTV room\} + electrical rooms + Ooredoo room + car park for 500 cars -
PHASE ( 2 ) Accommodation buildings :- 5 Buildings FOR Students ( S1 to S5 ) \{ G + 2F )
5 Buildings for Family ( F1 to F5 ) \{ G + 2F ), Family swimming pool, student swimming pool, jakozy,
External Road networks & light pool, External landscape between buildings (Soft + Hard )

Project Manager في AL DARWISH ENGINEERING
  • قطر
  • يناير 2012 إلى أغسطس 2013

Project Title: 10 School Project @ Doha and Around Villages Package # 6
* Brief: Project consists of 10 school each school contain \{Main Building 12 classroom and administration
rooms + 4 ancillary buildings (substation - guard room - tank yard - septic tank ) + External landscape &
Boundary wall \}
Contact Value = 259, 000, 000 QR Client: PWA (Ashghal) Consultant: Khatib & Alami

Project Manager في TARGET ENGINEERING CONSTRUCTION
  • الإمارات العربية المتحدة
  • أكتوبر 2008 إلى يناير 2012

Project Title: Bawabat Al Shariq Commercial & Residential Complex@ Bani yas
* Brief: Project consists of \{shopping Mall + 3 Buildings (G + 6 Floors / Building) + 65 Villas + internal and
external Roads network\} Contact Value = 834, 000, 000 AED
Consultant: World Planner (WP) Client: Bani Yas Company

Sr. Projects Manager في AL HUDA ENGINEERING WORKS
  • قطر
  • أكتوبر 2005 إلى أكتوبر 2008

Crushed Stone Facility Roads & Bridges Project @ Mesaieed
* Museum Islamic Park (Landscape )
( B ) Public Works Authorities ( PWA - Ashghal )
* Industrial Area Sewerage Phase (2) project 505 Consultant: Parsons
* Industrial Area Sewerage Phase (3) project 505/1 Consultant: Asco
* West Bay Roads & Infrastructures project 101 Consultant: Minuscule

PLANNING MANAGER في ARAB CONTRACTOR COMPANY (Osman Ahmed Osman)
  • مصر
  • نوفمبر 1996 إلى أكتوبر 2005

Main Projects @ Egypt
* El - Kurimat Compound Cycle Power Station Project
* Abu Zabal Rolling Mill & Rolling Project (steel structure
* Mansura University Medicals Centers projects
* El Shake Ibrahim Irrigation Canales

Civil Engineer في El Rewuta Company
  • المملكة العربية السعودية
  • أكتوبر 1994 إلى نوفمبر 1996
Road Engineer في Riyadh Municipality
  • المملكة العربية السعودية
  • أكتوبر 1992 إلى أكتوبر 1994

Technical engineer for road maintenance and road construction

Civil Engineer في Arab Contractor Company
  • مصر
  • ديسمبر 1989 إلى أكتوبر 1992

Civil site manger to construct gravity drainage pipe lines, water treatment plant aeration tanks
and screw pump; pump stations and road work

الخلفية التعليمية

ماجستير,
  • في ZAGAZIG UNIVERSITY
  • أغسطس 1998

بكالوريوس, Civil Construction And Civil Engineering
  • في ZAGAZIG UNIVERSITY
  • نوفمبر 1987

بكالوريوس, Civil Engineering
  • في ZAGAZIG UNIVERSITY
  • يوليو 1987

courses: PMP - PMI, United States Courses: * Training Course for Management (PMP) – UAE

Specialties & Skills

Cost Control
Engineering
Planning
CONSULTING
CUSTOMER RELATIONS
BRIDGES
BUSINESS PLANS
CASH FLOW
ENGINEERING
FINANCIAL
MATERIALS MANAGEMENT
MICROSOFT WORKS

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Project Management Institiute
  • membership
  • July 2009

التدريب و الشهادات

• Training Course for Contract & Claim Management (FIDIC) – Qatar (تدريب)
معهد التدريب:
Economic Group - Qatar
• Training Course for Management (PMP) (تدريب)
معهد التدريب:
AL QABAS - Abu Dhabi