1-Review for technical offers.
2-Review for schematic diagram.
3-Detailed design of high voltage substations secondary, control and protection systems.
4-Testing and commissioning for H.V. Substations.
tTYPE OF WORK:
1- Electrical National Energy Control Center (The Project Included Power plants in addition to 102 Substations with voltage levels 220KV&500KV.)
2-Detailed design of high voltage substations secondary, control and protection systems.
• Communication, protection, control design including preparation of the schematic and wiring diagrams and cable lists for the following substations:-
-Extension of Abo Zaabal 500/220 KV GIS substation by one 500/220 kV transformer bay and one 220/66 kV transformer bay. Egypt 2010
-El Marg 66/11KV GIS substation, Egypt 2011
-Giza North 1500MW Combined Cycle Power Plant 500kV and 220kV GIS substation, Egypt 2012
-Port Said 220/22/22KV GIS substation (under design), Egypt 2013
• TIME: From March 2010 to till now.
• COMPANY: Shaker Consultancy Group
• POSITION: Protection and Control Engineer
TYPE OF WORK:
Electrical National Energy Control Center: • The Project Included Power plants in addition to 102 Substations with voltage levels 220KV&500KV and the scope of work is:-
- Status of all circuit breakers at 500 KV, 220 KV.
- Status of all connecting switches.
- Status of all protection signals for transmission lines,
transformers, coupler, and bus bar.
- Control and monitoring of the transformer tapping.
- Monitoring all protection relays for all generating units
- Monitoring all active power, reactive power, and accumulated energy between different zones.
- Executing and preparation of site survey reports.
- Preparation of wiring diagrams, connection and cable
lists documents.
Detailed design of high voltage substations secondary, control and protection systems.
• Communication, protection, control design including preparation of the schematic and wiring diagrams and cable lists for the following substations:-
- Extension of Abo Zaabal 500/220 KV GIS substation by one
500/220 kV transformer bay and one 220/66 kV
TYPE OF WORK:
1- Electrical National Energy Control Center (The Project Included Power plants in addition to 102 Substations with voltage levels 220KV&500KV.)
2-Detailed design of high voltage substations secondary, control and protection systems.
• Communication, protection, control design including preparation of the schematic and wiring diagrams and cable lists for the following substations:-
-Extension of Abo Zaabal 500/220 KV GIS substation by one 500/220 kV transformer bay and one 220/66 kV transformer bay. Egypt 2010
-El Marg 66/11KV GIS substation, Egypt 2011
-Giza North 1500MW Combined Cycle Power Plant 500kV and 220kV GIS substation, Egypt 2012
-Port Said 220/22/22KV GIS substation (under design), Egypt 2013
I have worked for 3 years as an electrical design engineer.
Detailed design of high voltage substations secondary, control and protection systems for the following projects in Egypt:-
-Extension of Abo Zaabal 500/220 KV GIS substation by one 500/220 kV transformer bay and one 220/66 kV transformer bay.
-El Marg 66/11KV GIS substation, Egypt 2011
-Giza North 1500MW Combined Cycle Power Plant 500kV and 220kV GIS substation, Egypt 2012
-Port Said 220/22/22KV GIS substation (under design)
• B.Sc. In Electrical Engineering, Power Section, Helwan University, July 2009. • Final Year Grade: Very good. • Accumulative Grade: Good. • Graduation Project Grade: Excellent. • Graduation Project: Distribution