Mahram Khan Taheem, Internee Engineer

Mahram Khan Taheem

Internee Engineer

Descon

Lieu
Pakistan - Islamabad
Éducation
Baccalauréat, B.S. Civil Engineering
Expérience
0 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :0 years, 3 Mois

Internee Engineer à Descon
  • Pakistan - Lahore
  • juillet 2015 à août 2015

I work there as an Internee and learn about construction of an oil & gas power plant. It is great experience and I have learn the office environment. I learned there a team work which is very helpful for me.

In Descon head office I have an overview of
-Descon overview
-Soil Investigation of GAMBAT SOUTH GAS PROCESSING FACILITY TRAIN-I (GPF-II)
-Soil Investigation of MAKORI GAS POWER PLANT (GPF)
-Civil works in Oil & Gas Power Plant
-Sheds
-Steel Structures
-Pipe Racks
-Pipe Sleepers
-Equipment Supporting Structures
-Loading Arms Structure
-Drainage System
-Sewerage System
-Cable Trenches
-Underground Firewater Piping
-Reinforced Concrete Buildings
-Pre-fabricated Buildings
-Advantages & Disadvantages of RC buildings
-Design of Pipe Rack
-Design of Pipe Sleeper
-Pipe Support
-Design of Footings

Internee à Wapda Academy Faisalabad, Pakistan
  • Pakistan - Faisalabad
  • juin 2015 à juillet 2015

Some description about the civil works which are done on any dam project and then the soil investigation of any dam site and then how the construction work is commenced on dam. At the end they told in detail the case studies of all the hydraulics projects in Pakistan.
In WAPDA Academy Faisalabad I have an overview of

-Pakistan Water Sector Issues, Challenges & Strategies
-Types of Canals in Pakistan
-High Efficiency Irrigation System
-Soil Properties
-Concrete Tests
-WAPDA vision 2025
-Tunnels
-Case Study of Jinnah Hydro Power Project
-Case Study of Basha Dam
-Case Study of Neelum Jhelum Hydro Power Project
-Financial Issues releated to Hydro Power Project
-Environmental Impacts
-TBM
-Soil Classification
-Plastic Limit Test
-Liquid Limit Test
-Permeability Test
-Vane Shear Test
-Slump Test
-Specific Gravity Test
-Los Angeles Abrasion Test
-Absorption Test
-SSD Test
-Compacting Factor Test
-Pundit Ultrasonic Concrete Tester
-Concrete Test Hammer
-Windsor Probe Test
-Air Entrainment
-IRSA
-PSDP
-Mangla Dam Project
-Tarbela Dam Project

Éducation

Baccalauréat, B.S. Civil Engineering
  • à University of Engineering & Technology, Taxila
  • mai 2016

I Have got 4.-point GPA in fifth semester and got 1st position in my Department. I am also attaining HEC need base Scholarship and I have done internships in Descon and Wapda.

Etudes secondaires ou équivalent, Pre-Engineering
  • à Government Emerson College Multan
  • août 2012

Specialties & Skills

Risk Control
MS Project
AutoCAD
Project Management
Efficient management and organizational abilities
Strong designing skills
Ability to work in complex environments
Strong Mathematical Skills
Strong logical and reasoning abilities
Creative and innovative
Knowledge of various scientific methods for problem solving
Expertise in Auto-CAD
Effectively work with Microsoft office tools.
Ability to work independently and in team
Safety conscious

Langues

Urdu
Expert
Anglais
Moyen
Punjabi
Expert

Adhésions

ICE Student Chapter U.E.T. Taxila
  • Event Head
  • September 2014
Environmental Protection Society
  • Media Head
  • March 2014
American Society of Civil Engineers
  • My purpose as ASCE student member is to increase participation and interest in civil engineering
  • November 2015

Formation et Diplômes

Quaid-e-Azam Boys Scout (Formation)
Institut de formation:
Pakistan Boy Scouts Association
Date de la formation:
December 2012

Loisirs

  • Cricket
  • Listening Music
  • Hiking
  • Reading
  • Bed-minton
  • Football