Majed Khan, radio frequency optimization consulting engineer

Majed Khan

radio frequency optimization consulting engineer

Ericsson

Lieu
Koweït
Éducation
Baccalauréat, Networks And Telecommunications Engineering
Expérience
11 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 11 Mois

radio frequency optimization consulting engineer à Ericsson
  • Pakistan - Islamabad
  • avril 2021 à mars 2024

Configure Nemo Invex (Nemo Toll) and TEMS Paragon (TEMS Tool) Analysis and recommend Soft and Hard changes.
Cluster Reporting and Analysis the Bad Patch and Bad Events. VDT & CHR reports
Tuning of parameters related VoLTE, LTE, WCDMA and GSM
Traffic balancing between LTE and WCDMA
TEMS Discovery Report Templets Script creation .
DT Team Aligning
Monitoring KPIs.

Senior Nemo Invex Expert à LCC Pakistan
  • Pakistan - Islamabad
  • février 2020 à mars 2021

Configure Nemo Invex according to Plan.
Analysis and recommend Soft and Hard changes. Quarter base Cluster Reporting
DT Team Aligning
Making Reports of all activities performed. Updating Audit Sheets, MIPT, Stats 2G, 3G and LTE .

rf drive test lead engineer à LCC Pakistan
  • Pakistan - Peshawar
  • février 2015 à janvier 2020

Performing Cluster Drives/Walk Tests, SSV's, attempting customer/corporate complaints
Conducting Joint Visits with Operations team and Sales Dept. to resolve major site issues.
Performing Surveys for New site installation and sector addition. Resolving customer complaints.
Making Reports of all activities performed.
Updating Audit Sheets, MIPT, Stats 2G, 3G and LTE .
Performing Cluster Voice & Data and troubleshooting.
Making SSV's, Cluster drive and scanner logs reports using MapInfo.
Femto & Cell‐fi Configurations & Installation

dt project engineer à UCE Pakistan
  • Pakistan - Islamabad
  • janvier 2015 à février 2015

Inter ‐operator benchmarking and interference analysis
Data Analysis Ul/Dl Throughput Measurements .
Measuring Download and upload speed in r99 mode and HSPA Using data card.
Performing SSV.
Monitoring of RSCP & EC/N0 level of 3G sites.

dt project engineer à LCC Pakistan
  • Pakistan - Islamabad
  • septembre 2014 à décembre 2014

Performing SSV.
Monitoring of RSCP & EC/N0 level of 3G sites.
Verifying swap and Missing neighbor issue.
Verifying Softer/soft handovers (SHO)
Verifying CS and PS IRAT.
Performing Cluster Voice & Data and troubleshooting.
Making SSV's, Cluster drive and scanner logs reports using MapInfo.
Making Drive test routes.
Performing drive test on roll out sites of Mobilink (TRx, Data, AHO, CHO testing).
Identifying Intra/Inter cell Handover Failures and Missing Neighbor Issues.
Identifying Call Drops and Call Failure Issues.
Rx Quality and C/I Measurements in Dedicated Mode.

executive engineer à Technology at Work
  • Pakistan - Lahore
  • février 2014 à septembre 2014

Operates ETHER SCOPE &OptiView.
Monitor network performance and make adjustments as required. Configure the Network Assistant in the Ether Scope
In Ether Scope LAN maintenance &troubleshooting.
Diagnose network problems and fix them faster in the Ether Scope In the Ether Scope Switched LAN & VLAN visibility to identify source of problems
Verify a network from a single connection
Successful Achievements:
Successfully done the WATEEN's GTR (Gujranwala Telecom Region) Audit.
Successfully done the PTCL's FTR (Faisalabad Telecom Region) Audit.
Successfully done the WATEEN's FTR (Faisalabad Telecom Region) Audit

bss telecommunications lead engineer à AAC Telecommunication Company
  • Pakistan - Lahore
  • octobre 2013 à janvier 2014

Documents preparation i.e. Technical Site Survey Reports, Daily Progress Reports, Bills of Quantity etc. Professional
Civil Survey for Site. Site layout, Site Measurement, New Outdoor Pad Purposed, Indoor Solution, Existing Cable
Performed Battery testing by using DMM tool in Mobilink and Ufone Swap Project
Providing daily progress to customer and management
Pre‐ATP (Acceptance Test Procedure) for many sites
Dismantling and Packing of equipment in the given frame of time Dismantling RTN RRU
Done Mobilink 3G RRU Project
Done Mobilink Roll Out Sites
Meet Company targets for fault‐clearing times
Audit the physical condition of the premises and equipment in stated area
Align emergency duties and will be readily available to carryout such duties when ever required

trainee engineer à CACTUS FERTILIZER Pvt Ltd
  • Pakistan - Haripur
  • janvier 2012 à mai 2013

To Developed LAN and Wireless Network System in the Cactus Fertilizer.
Structured Cabling System (SCS) including technical support. Includes
Inside plant structural cabling and inside cabling layout Installation of IP and CCTV cameras in the Cactus Fertilizer Office. To developed databases for Cactus Fertilizer.
Give Lectures to colleagues about the usage of modern technologies and computers.
Installation of IP and CCTV cameras in sensitive areas of factory.

Éducation

Baccalauréat, Networks And Telecommunications Engineering
  • à Iqra University
  • décembre 2012
Etudes secondaires ou équivalent, Pre-Engineering
  • à Abdul Qadeer Khan College Haripur
  • août 2008

Specialties & Skills

Networks
Engineering
Coordination
Telecommunications
Microsoft Office

Langues

Anglais
Expert
Arabe
Débutant
Urdu
Langue Maternelle
Punjabi
Expert
Pashto
Moyen