13- Giving hand
Air liquide egypt
مجموع سنوات الخبرة :7 years, 0 أشهر
- GENELEC Constructor (01/12/1992 till 01/04/1998)
Electrical erection "power, and control".
- Messer Egypt (01/03/1998 till transaction of AirLiquide)
Current job: - AirLiquide Egypt
Position: Shift leader & Electrical Technician in Alexandria Co2 recovery plant.
Responsibilities: 1- Leading my shift's personnel in accordance to the safety regulations of AirLiquide.
2- Follow up the production process KPIs (Key Performance Indicators), and plant parameters.
3- Logging the abnormal observations and taking the necessary actions towards it.
4- Insuring the IMS (Industrial Management System) SOPs implementation in any operation covered by SOP.
5- Reporting any near misses, and taking the corrective action at once if that was possible and agreed by my manager.
6- Performing both planned and breakdown maintenance activities for plant equipment, especially those related to electrical field.
7- Handling and controlling the road tankers charging operation.
8- Compressor motors overhauling and bearing replacement.
9- Control panels wiring erection, tagging and testing.
Alsthom Export Egypt Branch (10/07/1992 till 01/11/1992)
Erection electrician and in the maintenance of the main transformer (420 MVA)