منكندن بلسبرمنين, Instrumentation Project Engineer

منكندن بلسبرمنين

Instrumentation Project Engineer

SSE AUTOMATION & SOLUTIONS

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Electronics and Instrumentation Engineering
الخبرات
10 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 4 أشهر

Instrumentation Project Engineer في SSE AUTOMATION & SOLUTIONS
  • الهند - تشيناي
  • أشغل هذه الوظيفة منذ أكتوبر 2016

 Programming and Trouble-shooting for sensors, Transducers, PID Controllers Thermistors and all kind of Instrumentation equipment’s.
 Developed software requirements for the Supervisor Control and Data Acquisition (SCADA) graphical Displays.
 Work with various PLC technologies and develop and update existing code for the equipment’s.
 Prepare the technical documentation of application source code.
 Designed, developed and tested assembly systems for engineer and automotive components
 Determine and Implement error handling of PLCs
 Responsible for engineering, Maintenance and repair work activities in the all kind plant.
 Provided control systems programming and integration for the plant.
Projects:
 Titan Watch gold molding process - 2010
 Berger paints conveyor system - 2010
 Motherson Pondicherry Data logging software Design - 2011
 Abbreff Data logging Software for Furnace temperature oil measurement. - 2012

Tunnel Electrical Instrumentation Engineer في Saudi Tumpane
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2015 إلى أكتوبر 2016

 Previously worked at Saudi Tumpane Waste water Treatment company, Saudi Arabia as a Site Engineer / PLC Electrical Engineer. ( Tunnel)
 1. Electrical :
 After assembly I was one of two onboard maintenance electricians responsible for daily work orders and troubleshooting all electrical problems pertaining to the tunnel boring machine as the Al Hayer Tunnel was being bored.
 Assisted the Electrical Technicians with testing and modifying TBM functions on HMIs and PLCs.
 Pulling and terminating cable from 3/750MCM to 22AWG, terminating PLC system for control cabin and full machine assembly.
 I’ve worked with voltages from 11, 000 to 12v DC and was directly involved with the complete assembly and wiring of the entire Tunnel Boring Machine.
 11, 000 - volt main power supply from FLP stepped down to 480 at transformer banks and MDB’s ( Main Distribution Bank)
 Installing VFD’s PLC’s, Motors, Panel Boards, Emergency Lighting, proximity and pressure sensors.
 This machine utilized a ABB PLC system with over 2500 I/O.
 Work with various PLC technologies and develop and update existing code for the equipment’s.
 Designed, developed and tested assembly systems for engineer and automotive components
 New loops adding as per process requirements.
 Fixing troubleshoot problems in the systems, and the enhancements that support systems.
 Review technical drawings and manage tunnel related engineering projects.
 Very well knowledge on Mining Operation.
 Site project management, daily site operations and to manage a projectteam.
 Handling technical and engineering issues.
 Site project management, daily site operations and to manage a project team.
 Handling technical and engineering issues.
 Overall project planning, scheduling, monitoring and updating to meet project completion targets.
 Site co-ordination, monitoring and report work progress.
 Trouble Shooting the PLC Panel Board, PLC Coding, Sensors, Transmitters and all instrumentation parts in the tunnel.
 Understanding specifications for programming and developing code for them.
 Fixing troubleshoot problems in the systems, and the enhancements that support systems.
 Installation, commissioning, calibration and loop checking of various field instruments

LABVIEW Software Engineer في MAXEYE TECHNOLOGIES Pvt Ltd.
  • الهند - بنغالورو
  • فبراير 2014 إلى سبتمبر 2015

 Responsible for leading the projects and project management activities
 Communicate with the clients to understand their requirements, and analyze them.
 Understanding specifications for programming and developing code for them.
 Implement the new tool (JKI) in all old projects.
 Database creation.
 Developing the codes as per client requirements.
 Create the MATLAB codes for different type PID controllers.
 Compare the PI and PID Analog controller with Discrete Controllers.
 Fixing troubleshoot problems in the systems, and the enhancements that support systems.
 Review and propose cost efficient engineering solutions for engineering related projects.

الخلفية التعليمية

بكالوريوس, Electronics and Instrumentation Engineering
  • في Anna University
  • نوفمبر 2009
دبلوم, Electronics and Communication Engineering
  • في Lathamathavan Polytechnic College
  • مايو 2006

Specialties & Skills

MS Office Automation
Project Engineering
Field Testing
ASSEMBLY
AUTOMOTIVE
CHANGE MANAGEMENT
CLIENTS
CONFIGURATION MANAGEMENT
CONTROL SYSTEMS
DATA ACQUISITION
ENGINES
HARDWARE SPECIFICATIONS
INSTRUMENTATION

اللغات

التاميلية
اللغة الأم
الانجليزية
متمرّس
العربية
مبتدئ
الهندية
مبتدئ

التدريب و الشهادات

CAE (الشهادة)
تاريخ الدورة:
October 2009