MANISH KUMAR MITTAL, SENIOR CONSTRUCTION MANAGER

MANISH KUMAR MITTAL

SENIOR CONSTRUCTION MANAGER

THE RED SEA DEVELOPMENT COMPANY

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Civil & Construction Tech
الخبرات
21 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 2 أشهر

SENIOR CONSTRUCTION MANAGER في THE RED SEA DEVELOPMENT COMPANY
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أكتوبر 2020

Role on this project involves project delivery management team and responsible for the coordination of the
construction plan and targets and execute the strategic, operational for a highway and local & Coastal roads on
reclaimed land, Bridges, Side wide, Building works, installation of Deep Utilities and infrastructure works,
Datacenter, GSM towers, Patrol gas stations within the Beach Precinct and Cultural Precinct of The Red Sea
Development Company Umluj, Saudi Arabia

Construction Manager في JASARA(PIF-JACOBS-SAUDI ARMCO)-JV
  • المملكة العربية السعودية
  • أغسطس 2018 إلى سبتمبر 2020

JASARA (PIF- JACOBS-SAUDI ARAMCO(JV)) Program Management Company
Client - King Abdullah Financial District (KAFD)

Construction Manager في JACOBS-ZATE
  • المملكة العربية السعودية
  • يوليو 2015 إلى أغسطس 2018

Current role on Riyadh-2, Industrial city project for MODON as

Sr. Highway Engineer في ASHGHAL
  • قطر
  • نوفمبر 2007 إلى أكتوبر 2011

The project involves the construction
of 28km of secondary road network of the main North road including all major & minor bridges, Viaduct, Coastal
roads, stressing and traffic management, Infrastructures, utilities like sewer, storm, potable, irrigation lines etc.
Responsibilities:
• My duties on this project involved supervision of the construction works including road pavement works,
Bridges structure, Infrastructures & utilities works, storm and irrigation networks, lighting works and
pavement and curb works.
• Review of drawings and method statements
• Approving material submittals and Contractor running bills.
• Working with the scheduler to monitor progress and agree mitigation plans
• Attending and contributing to Technical & Progress meetings
• Managing close out of the projects including snagging works
• Monitoring the contractor’s safety performance on site.
• Project Handing over, preparation of snags & punch list.
Page 4 of 6
Parsons International Limited, Abu Dhabi - U. A. E
Client -Tourism Development & Investment Company

senior engineer في Parsons International Limited
  • المملكة العربية السعودية
  • يناير 2007 إلى يناير 2011

Krishna Koyana Lift Irrigation Project at Sangali, Tapi major lift irrigation
project, Dudh Ganga Hydro power project at Maharashtra.
Responsibilities:
• All type of construction of minor bridges, culverts, underpass, pump houses, Potable water and
construction of concrete dam & earthen dams, turbine foundation, gallery, tunneling, river training,
launching apron, spillways, Viaduct bridges and contractors billing, government billing, dealing with
client and Authority, site program and planning

Asst. Construction Manager في National Highways Authority of Indi
  • أبريل 2004 إلى نوفمبر 2007

Responsibilities:
Execution at site as a precast yard In charge for Viaduct, segmental (short line & long line method), Shuttering,
Stressing, 3-D stressing, Concrete laying, Launching of segments (Incremental & balanced cantilever method),
Steam curing, Schedule making & planning of Viaduct Precast Yard, Cable stay bridges, Metro bridges, Micro
tunneling, Break water works for utilities and contractor
billing.
Construction of PSC Girder I-type, 40 mtr. Length of PSC Girder. Execution at site, Shuttering, Stressing,
Concrete lying, Schedule, Launching of Girders
Responsible for construction of a number of projects comprising Concrete works, installation of deep sewer and
storm water systems. Also experience of managing micro tunneling with TBM (Tunnel boring machine) and open
trench works.
In the role I was also responsible for preparing schedules and monitoring progress and coordinate with concern
authorities, consultants and contractors.

Senior Bridge Engineer في S.E.W. Construction Ltd
  • الهند
  • أغسطس 1999 إلى مارس 2004

Senior bridge engineer working on a project for upgrading to 4/6 Lane of Major Bridge on Visakhapatnam to
Srikakulam section of NH-5(Client: NHAI). The project composed Construction of Major Bridges, Viaduct,
Superstructure, voided slab. Foundation, Pier 8.0m dia well, Abutment 12mX6m Double D well, Bored Cast in
situ 750 to1200 mm dia Pile and coastal roads.
Responsibilities:
My role involved supervision of construction works at site and preparation of Method statement for all type of
civil & utilities works, In charge of precast yard. I was also responsible for coordinate with concern authorities,
consultants and contractors.
I was also senior engineer for the Tapi Medium Lift Irrigation Project at Sulwade Barrage in Dule (M.S). This
involved all types of steel structures in barrage, pier, stilling basin, and bridge, river training works,
Infrastructures, Potable water line, storm water line & construction of colgrout masonry structures and micro
tunneling works with Tunnel boring machine (TBM) for deep irrigation water line

الخلفية التعليمية

بكالوريوس, Civil & Construction Tech
  • في Amaravati University
  • يونيو 1997

courses: Certified Engineer

بكالوريوس, Civil & Construction Tech
  • في Amaravati University
  • يونيو 1997

courses: Certified Engineer

Specialties & Skills

Project Management
Highways
Infrastructure Projects
BRIDGES
CUSTOMER RELATIONS
ENGINEERING
MEETING FACILITATION
MICROSOFT WORKS
PROGRESS
SUPERVISORY SKILLS

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الأوردو
متمرّس