Electrical Maintenance Engineer
SEL
مجموع سنوات الخبرة :14 years, 9 أشهر
Implement, maintain, and improve electrical instruments, equipment, facilities and systems.
Confer with seniors and others to discuss existing or potential engineering projects.
Inspect completed installations and observe operations and compliance with operational & safety standards.
To co-ordinate with Electrical Contractor for Electrification, Execution, Erection and Commissioning.
Installing, testing, commissioning & maintenance of electrical equipments and machines.
Supervise and train juniors, foreman and electricians as necessary.
Compile data and write reports regarding power consumption, electrical breakdowns, machines maintenance and existing electrical system.
Ensure completeness of all kind of documentation related to compliance or audits.
Plan, schedule and conduct preventive maintenance of All electrical machines, Water treatment plants, Air humidification plant, Air compressors, MCCs, PDBs, LT & HT Panels, Voltage stabilizers, Lighting and 11-0.433KV Sub Station.
Supervising the functions of troubleshooting & predictive / preventive maintenance for identifying areas of obstructions and reducing machinery downtime to minimum.
Analysis of repetitive equipment failure.
Tracking of Testing Equipments and Instruments for Calibration Records.
Upgrade existing system to improve efficiency and performance.
Taking care of breakdowns related to electrical (Control panels, Motors, PLC, Lighting, VFDs etc.)
Forecasting of spare parts, Material management and indenting material as per requirement also ensuring fewer inventories.
Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in expenditures and work within the budget.
ACHIEVEMENTS
Served as a project engineer for multiple projects:
Erection of 11-0.433KV Sub Station.
Route survey of HT & LT transmission lines, HT & LT line testing.
Commissioning of MCCs, PDBs and HT & LT panels.
Erection of Water treatment plants & Air humidification plants.
Installation & Cabling of machines of textile plants of 5MW & 7MW connected load.
Installation of Intercom, Fire Alarm systems & E.O.T Hoists.
Electrification of 6 Worker buildings (384 Rooms).
Lighting of both plants & facilities with different types of light luminaries (Indoor, Outdoor, & Special application).
Successful in bringing down the operational costs of the designated departments.
Handled a team of 15 - 20 people within a short span of my career.
Was able to eliminate machine failures to the minimum possibility.
Power cost reduction with energy saving by introducing drives & timer.
Proved to be an excellent team leader and motivator.
The “service turn-around time” was highly appreciated by the superiors.
B.Tech in ELECTRICAL ENGINEERING > With 64.1%, Passed out in 2008 > From Rayat institute of engineering and information technology, Railmajra, Nawanshahr (Punjab) affiliated to P.T.U Jalandhar & AICTE New Delhi INDUSTRIAL TRAINING > Ess Ess Kay Engg. Co. Pvt. Ltd, Kapurthala -Punjab > Surya Transformers Ltd, Ludhiana -Punjab
12th - CBSE Board with 61.4% in 2004 DAYANAND SR. SEC. SCHOOL, JALANDHAR - PUNJAB
10th - CBSE Board with 63.4% in 2002 SHIVALIK PUBLIC SCHOOL, NAWANSHAHR - PUNJAB