مانوج Gupta, QA/QC Electrical Inspector.

مانوج Gupta

QA/QC Electrical Inspector.

SEPCO

البلد
المملكة العربية السعودية
التعليم
دكتوراة, Ph.D. in IT
الخبرات
17 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 2 أشهر

QA/QC Electrical Inspector. في SEPCO
  • المملكة العربية السعودية - جازان
  • أغسطس 2017 إلى مارس 2021

I worked here as a QA/QC Electrical Inspector at Power Block for the Generation of power and transmission of Electrical Power.

QA/QC ELECTRICAL INSPECTOR (SADARA Approved) في EL-SEIF ENGINEERING & CONTRACTING COMPANY
  • المملكة العربية السعودية - الجبيل
  • أغسطس 2014 إلى يونيو 2017

To inspect all electrical activity, receiving of electrical material etc

QA/QC Electrical Inspector في el-seif Engineering Contracting Co.
  • المملكة العربية السعودية - جدة
  • مارس 2014 إلى يوليو 2014

Hyundai Elseif Joint venture for Saudi Aramco - King Abdullah
Sports City, Jeddah

QA/QC Electrical Inspector في Eastern Trading & Construction Est. (ETE)
  • المملكة العربية السعودية - جدة
  • يناير 2013 إلى مايو 2013

To check all work and inspect by standard.To make RFI and conduct work, surveillance report, etc...

QA/QC Electrical Inspector (Aramco approved) في Technip
  • المملكة العربية السعودية - الجبيل
  • مايو 2012 إلى أغسطس 2012

• Installation of wiring, conduits, panels, transformers and switchgear, distribution panels.
• Motor control center, instrumentation metering and monitoring display system, installation switch yard transformer
• Installation of medium and low voltage lighting termination emergency lighting system.
• Installation of Sub-station equipment 13kv, Substation and all inside cable laying, Switchgear and MCC panel control cable laying and wiring termination.
• Installation of 13kv.brass bar transformer to switchgear, substation LC & RC panels
• Installation and termination of low voltage transformer and dry type.

QA/QC Electrical Inspector (Aramco approved) في Othman Saleh Al-Ghamdi Contracting
  • المملكة العربية السعودية - الهفوف
  • نوفمبر 2011 إلى أبريل 2012

• Material receiving inspection/electrical equipment, meager test of cable
• Insulation, continuity of cable.
• Preparation of inspection reports and testing
• Preparation of weekly Minutes of Meeting
• Installation of switchgear and control gear
• HV/MV Cable splicing
• Hi-Pot test and meager test

QA/QC Electrical Inspector في Shan International
  • المملكة العربية السعودية - الدمام
  • يوليو 2011 إلى أكتوبر 2011

• Material receiving inspection/electrical equipment, meager test of cable
• Insulation, continuity of cable.
• Preparation of inspection reports and testing
• Preparation of weekly Minutes of Meeting
• Surveying of installation and report preparation prior to the pre-commissioning
• Testing of LV, Data and Fiber Optics cables.
• Inspection of CCTV Systems, Access Control Systems, Intercom, and public address systems.
• Inspection of security system such as fiber optic fence sensor system.
• Emergency Siren System inspections.
• Emergency Call Points inspections
• Termination and testing of fiber optic cables, Coaxial cable.
• Termination inspection report prior to commissioning.
• Participation in Walk down for the completed systems.
• Punch points clearing.
• Prepares necessary documentation needed for Project acceptance and Turn- over.
• Material receiving inspection/electrical equipment, meager test of cable Insulation, continuity of cable.

• Cable pulling on tray, induct bank, drowpit, mandatory test of duct bank, High potential test of cable, power cable splicing, control cable splicing, Covering of cable tray.

• Installation of switchgear in substation, commissioning of motor control Center.

• BMC building management center to arrange control cable and install the Equipment

• Installation of VFD & Motor 3 phase in different load.

• Installation of AHU, FHU and termination of equipment, balancing of Air Unit, etc.

Senior Electrical Supervisor في petrofac
  • المملكة العربية السعودية - الجبيل
  • أكتوبر 2010 إلى يونيو 2011

• Material receiving inspection/electrical equipment, meager test of cable insulation, continuity of cable.
• Cable pulling on tray, induct bank, drowpit, mandatory test of duct bank, high potential test of cable, power cable splicing, control cable splicing, Covering of cable tray.
• Installation of power lighting fixture, earthling cable, earthling bar, junction box, etc.
• Installation of gladding, dressing cable, tagging, termination of instrument & electric cables.
• Installation of poles lights, area lights, emergency lights, and normal lights.

Project Co-ordinator في SAMEER AIR CONDITION AND ELECTRICALS - QATAR
  • قطر - الدوحة
  • مارس 2007 إلى مايو 2009

Directly responsible for the supervision of construction activities & Quality of work with high grade Safety Point of View by following all rules & regulation.

Coordinate with the KAHARMA. Engineer, Inspector, Contracts Engineer operation department & loss Prevention during execution of project for improvement of quality with safety. Preparation of technical queries & proposal for materials of the project for submission to the KAHARMA Engineer & Technical support unit.

Preparation & submission of accomplishment report & other related information to the KAHARMA Engineers of Qatar for related different type of projects.

Strictly monitoring the construction activities, safety awareness & effective manpower utilization in order to minimize loss of manpower as well as safely.

Direct responsible for the preparation of operations & the maintenance manual of the project as on the requirement of Qatar rules & regulation.

Prepare other related engineering works of Qatar such as estimating, site visit & job monitoring as required in a certain project. Direct responsible for the project from the beginning from the line of job explanation to the final inspection of the project.

Directly responsible for all the electrical projects of the company from beginning (Biding) up to the final inspection of the projects.

Responsible for the preparation of the startup the project & manpower schedule. Attended co-ordination meeting with the owner, consultant & Engineers of the department (KAHRAMA) of Qatar

Conduct general site inspection from time to time & performs all the other duties required in the constructions of the project.

Maneger في NARITA INDUSTRIAL & COMMERCIAL INTERPRISES-BELARUS
  • بيلاروسيا
  • مايو 2003 إلى أكتوبر 2006

As manager of sales and marketing department of All the production of different industries, different countries to bring on market of the Soviet Union on the competitive manner & competitive supplier

electrical engineer في Choudhry Electric Company
  • نيبال
  • أبريل 2001 إلى أبريل 2003

Installation of Power Supply at multi Story’s buildings,
Installation of Air-conditions and Installations of cable under ground.

To take new project & according to requirement of the factory newly designed & erected the plant, during designing strictly considered the load of factory, motors capacity, the rating of cables, the capacity of generators, transformers, fuses, suitable control system for the operation in order the rules & regulations of the government of Nepal and the Nepal Electricity Authority & follow the all safety requirement of Nepal Electricity Authority which is applied for the erection of factories in the safely, reliable & economically manner for the better output ratio of the factories.

Maintenance of electric equipments. Install various type of motors, Repairing motors, repairing of various type of electrical equipments and Repairing of Transformer 3 phase and single phase.

الخلفية التعليمية

دكتوراة, Ph.D. in IT
  • في S.L.C.
  • مارس 2001

Ph.D. in Information Technologies (Energetics)

ماجستير, Electrical
  • في Belarush National Technical University
  • مايو 1999

Master of Science in Electric Power Engineering - 1999 Minsk, Belarus (Former USSR)

Specialties & Skills

Electric Power
Electrical Maintenance
Electrical Engineering
Electrical Engineer
QA/QC Electrical Engineer
installation
Instrument Engineering
Quality Control

اللغات

الانجليزية
متمرّس
العربية
متوسط
الروسية
متمرّس
الهندية
متمرّس
الأوردو
متوسط

العضويات

Nepal Engineering Association
  • To eliminate the problem of engineering association
  • April 2001

الهوايات

  • Movie Watch, Read the book
    Read the book and watch movie and watch the news.