QA/QC Electrical Inspector.
SEPCO
مجموع سنوات الخبرة :17 years, 2 أشهر
I worked here as a QA/QC Electrical Inspector at Power Block for the Generation of power and transmission of Electrical Power.
To inspect all electrical activity, receiving of electrical material etc
Hyundai Elseif Joint venture for Saudi Aramco - King Abdullah
Sports City, Jeddah
To check all work and inspect by standard.To make RFI and conduct work, surveillance report, etc...
• Installation of wiring, conduits, panels, transformers and switchgear, distribution panels.
• Motor control center, instrumentation metering and monitoring display system, installation switch yard transformer
• Installation of medium and low voltage lighting termination emergency lighting system.
• Installation of Sub-station equipment 13kv, Substation and all inside cable laying, Switchgear and MCC panel control cable laying and wiring termination.
• Installation of 13kv.brass bar transformer to switchgear, substation LC & RC panels
• Installation and termination of low voltage transformer and dry type.
• Material receiving inspection/electrical equipment, meager test of cable
• Insulation, continuity of cable.
• Preparation of inspection reports and testing
• Preparation of weekly Minutes of Meeting
• Installation of switchgear and control gear
• HV/MV Cable splicing
• Hi-Pot test and meager test
• Material receiving inspection/electrical equipment, meager test of cable
• Insulation, continuity of cable.
• Preparation of inspection reports and testing
• Preparation of weekly Minutes of Meeting
• Surveying of installation and report preparation prior to the pre-commissioning
• Testing of LV, Data and Fiber Optics cables.
• Inspection of CCTV Systems, Access Control Systems, Intercom, and public address systems.
• Inspection of security system such as fiber optic fence sensor system.
• Emergency Siren System inspections.
• Emergency Call Points inspections
• Termination and testing of fiber optic cables, Coaxial cable.
• Termination inspection report prior to commissioning.
• Participation in Walk down for the completed systems.
• Punch points clearing.
• Prepares necessary documentation needed for Project acceptance and Turn- over.
• Material receiving inspection/electrical equipment, meager test of cable Insulation, continuity of cable.
• Cable pulling on tray, induct bank, drowpit, mandatory test of duct bank, High potential test of cable, power cable splicing, control cable splicing, Covering of cable tray.
• Installation of switchgear in substation, commissioning of motor control Center.
• BMC building management center to arrange control cable and install the Equipment
• Installation of VFD & Motor 3 phase in different load.
• Installation of AHU, FHU and termination of equipment, balancing of Air Unit, etc.
• Material receiving inspection/electrical equipment, meager test of cable insulation, continuity of cable.
• Cable pulling on tray, induct bank, drowpit, mandatory test of duct bank, high potential test of cable, power cable splicing, control cable splicing, Covering of cable tray.
• Installation of power lighting fixture, earthling cable, earthling bar, junction box, etc.
• Installation of gladding, dressing cable, tagging, termination of instrument & electric cables.
• Installation of poles lights, area lights, emergency lights, and normal lights.
Directly responsible for the supervision of construction activities & Quality of work with high grade Safety Point of View by following all rules & regulation.
Coordinate with the KAHARMA. Engineer, Inspector, Contracts Engineer operation department & loss Prevention during execution of project for improvement of quality with safety. Preparation of technical queries & proposal for materials of the project for submission to the KAHARMA Engineer & Technical support unit.
Preparation & submission of accomplishment report & other related information to the KAHARMA Engineers of Qatar for related different type of projects.
Strictly monitoring the construction activities, safety awareness & effective manpower utilization in order to minimize loss of manpower as well as safely.
Direct responsible for the preparation of operations & the maintenance manual of the project as on the requirement of Qatar rules & regulation.
Prepare other related engineering works of Qatar such as estimating, site visit & job monitoring as required in a certain project. Direct responsible for the project from the beginning from the line of job explanation to the final inspection of the project.
Directly responsible for all the electrical projects of the company from beginning (Biding) up to the final inspection of the projects.
Responsible for the preparation of the startup the project & manpower schedule. Attended co-ordination meeting with the owner, consultant & Engineers of the department (KAHRAMA) of Qatar
Conduct general site inspection from time to time & performs all the other duties required in the constructions of the project.
As manager of sales and marketing department of All the production of different industries, different countries to bring on market of the Soviet Union on the competitive manner & competitive supplier
Installation of Power Supply at multi Story’s buildings,
Installation of Air-conditions and Installations of cable under ground.
To take new project & according to requirement of the factory newly designed & erected the plant, during designing strictly considered the load of factory, motors capacity, the rating of cables, the capacity of generators, transformers, fuses, suitable control system for the operation in order the rules & regulations of the government of Nepal and the Nepal Electricity Authority & follow the all safety requirement of Nepal Electricity Authority which is applied for the erection of factories in the safely, reliable & economically manner for the better output ratio of the factories.
Maintenance of electric equipments. Install various type of motors, Repairing motors, repairing of various type of electrical equipments and Repairing of Transformer 3 phase and single phase.
Ph.D. in Information Technologies (Energetics)
Master of Science in Electric Power Engineering - 1999 Minsk, Belarus (Former USSR)