Surveyor
Dongfang Electric Corporation
مجموع سنوات الخبرة :14 سنة, 3 أشهر
- Calculation of co-ordinates from approved drawings for centerline and elevation by programmer calculater 880P, Fx 4500.
- Setting out the different permanent and temporary facilities.
- Topographical survey of upstream and downstream
- Setting out of turbine (Well) all around the Power House for dewatering purpose.
- Leveling for preparation of sub grade, sub base, aggregate base course and asphalt base course and wearing base course.
- Setting out of left and right services blocks
- Setting out the Cable Trenches
Sokkia Set 3CS, Sokkia 610k, Topcon 229