Marcelino Kamel Sobhy, Regional Manager

Marcelino Kamel Sobhy

Regional Manager

East West for trading and contracting

Lieu
Egypte - Alexandrie
Éducation
Baccalauréat, Mechanical Engineer (Naval architecture and Marine engineering)
Expérience
18 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 7 Mois

Regional Manager à East West for trading and contracting
  • Egypte - El-Alamein
  • mars 2020 à décembre 2021
Ready mix branch manager à United cement group
  • Egypte - El-Alamein
  • novembre 2018 à février 2020
Ready mix operation manager à Alex mix for Ready mix concrete and developed concrete
  • Egypte - Alexandrie
  • mai 2017 à novembre 2018

Direct the company in keeping with the vision outlined for the company by the board of directors. Establishing goals for each department in partnership with division managers.

Ready mix Plant Manager à Detac for ready mix concrete
  • Egypte - Alexandrie
  • août 2010 à mai 2017

oversee all plant activities and manufacturing operations, including safety norms, quality control, sales, scheduling, client compliances, warehousing, production, product, storage, loading and shipping.

Plant and Equipment Department Manager à Archirodon Construction (Overseas) CO.S.A
  • Egypte - Damietta
  • juillet 2007 à août 2010

Monitored on a daily basis the schedule of work associated, initiated corrective action, ensure equipment and plant operations are conducted within the agreed financial parameters. Participate and coordinate for the purchasing of new equipment for the project construction activities and proposed supplier.

GRP Factory Manager and Yachts Engine room à DeBirs Yachts (Luxury Motor Yachts)
  • Egypte - Alexandrie
  • juillet 2006 à juillet 2007

Lamination of fiberglass for yachts (structure, main deck... etc), Gel coating, painting, Engine room installation and testing.

Plant and Equipment Department Manager à Archirodon Construction (Overseas) CO.S.A
  • Egypte - Port Saïd
  • février 2004 à juillet 2006

Maintenance of Geotechnical Equipment Drilling Rigs
(Cutter BC-32 on BG 40), Desanding Plant, Crane Crawlers up to 70T, Land Equipment and Light Vehicles.

•Coordinating parts equipment, new model stock order, pre-bookings trends, back orders with sales department and body shop to ensure the right parts are available and there is no delay or loss of labor hours due to lack of coordination.

•Ensure that all the workshop functions are staffed with the requisite numbers and caliber of staff to meet its objective and that they are developed and motivated and encouraged to maximize their capability and contribution.

Plant and Equipment Engineer à Saudi Archirodon Limited,Central Facility Yard
  • Arabie Saoudite - Jeddah
  • novembre 2003 à février 2004

Following a periodical schedule program for different equipment operating, instruction manuals, service, hydraulic and transmissions systems for different equipment makes and models, wire ropes, bearing and pumps.

Plant and Equipment Engineer à Archirodon Construction (Overseas) CO.S.A
  • Egypte - Alexandrie
  • juin 2003 à novembre 2003

Recording of daily defects and remarks for project’s marine floating, geotechnical and earth moving equipment, follow corrective, predictive maintenance programs.

Éducation

Baccalauréat, Mechanical Engineer (Naval architecture and Marine engineering)
  • à Alexandria University
  • juin 2001

Specialties & Skills

Microsoft Word
Naval Architecture
Production
CUSTOMER RELATIONS
MECHANICAL
INSTRUCTION
FINANCIAL
LANGUAGES
Analyzer
Cost Controlling

Langues

Arabe
Expert
Anglais
Expert

Formation et Diplômes

The New Zealand Qualification Framework (NZQA) (Certificat)
Date de la formation:
October 2016
Occupational Safety & Health Administration(OSHA) (Certificat)
Date de la formation:
February 2014
Accreditation: Stage 1 from the Institute of Marine Engineering (UK) (Certificat)
Date de la formation:
June 2001
Valide jusqu'à:
May 2006

Loisirs

  • fitness, photography,