Mark dawn ميكولوب, Project HSE Manager

Mark dawn ميكولوب

Project HSE Manager

arabian bemco contracting co. ltd.

البلد
المملكة العربية السعودية - الخبر
التعليم
بكالوريوس, Bachelor of Science in Electrical engineering
الخبرات
20 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 5 أشهر

Project HSE Manager في arabian bemco contracting co. ltd.
  • المملكة العربية السعودية - الخبر
  • أشغل هذه الوظيفة منذ أبريل 2012

• Modify the HSE Safety Program to project specifications including drafting/amending site specific safety plan.
• Organize oversight processes, which ensure the integrity of the safety inspection, training and reporting procedures.
• Evaluate successes, failures and safety trends and present the analysis to the Program Manager for monthly reporting.
• Assist in the development and implementation of effective safety education and management processes for the Project, and conduct safety training.
• Contribute on Incident Analysis (IA) Teams and complete incident reporting to Safety personnel, and insure proper reporting.
• Provided full-time support in the field, on construction projects, to assure operations are planned and conducted in a safe manner.
• Provided advice, guidance, and assistance to personnel involved in our projects regarding safety and health issues and work practices.
• Interfaced with Client Safety & Health Department on site safety & health issues and coordinate preventative measures.
• Coordinated and mentored project safety & health walk-through assessments.
• Periodically distributed information by updating memos relative to safety, including assisting Site Management with correspondence.
• Reviewed and complete, as necessary, Near Miss, Incident and Accident Investigation reports and recommend countermeasures as appropriate.
• Reported to Corporate Safety & Health periodically regarding the Project Safety & Health Program progress, challenges, and objectives

Project HSE Deputy Manager في Arabian BEMCO contracting co. ltd.
  • المملكة العربية السعودية - الشرقية
  • أغسطس 2011 إلى أبريل 2012

• Identify and anticipate safety and health concerns and hazards by surveying environmental, operational, and occupational conditions and render opinions on new procedures and recommend preventative programs.
• Develop safety campaigns, safety systems, policies, and procedures, and train management and employees on rules and regulations.
• Conduct safety inspections and investigate violations to ensure safety procedures are being followed and counsel managers and employees accordingly.
• Maintain worker training schedules and complete all required regulatory documentation.
• Review Contractors safety records, documents to ensure major construction equipment is maintained regularly.
• Initiate meeting with Contractors HSE Managers to ensure that HSE policy is implemented.
• Participate in weekly meetings and monthly client meetings. Prepare a monthly safety report for the project.

Project involved: Qurayyah Combined Cycle Power Plant II-Saudi Electric Company

HSE Coordinator / Safety Engineer في Arabian BEMCO for Contracting Company
  • المملكة العربية السعودية - الشرقية
  • أكتوبر 2007 إلى أغسطس 2011

• Lead and coordinate with the client (Saudi ARAMCO)Loss Prevention and Safety Department policies and procedure
• Coordinate with Plant Work Permit Requirements and relevant safety matters
• Administer the HSE Management system by encouraging all project teams to function as per the proper procedure and guidelines.
• Consolidate HSE reporting data (Environmental reporting, Safety statistics, pro-active indicators) for the project to the HSE Director.
• Ensuring standardized HSE Integrated Management Systems, practices & procedures are developed, maintained & implemented consistently in the project
• Provide necessary training to key management personnel for the implementation of the Integrated Management System.
• Participate & manage Incident /Accident Investigations.
• Prepare and maintain Project Safety Manual.
• Review Safety Procedures as submitted by the Contractors and ensure implementation is in compliance with Contract requirements.
• Review Inspection Test Plans and safety plans as submitted by the Contractors and ensure compliance with projects overall requirements.
• Ensure all activities on site are in compliance with safety procedures in respect of the format signed off by Contractors Safety Officer.
• Ensure Contractors safety staff are adequate, suitably experienced on site and report to the Project Director in case of shortfall.
• Review Contractors safety records, documents to ensure major construction equipment is maintained regularly.
• Participate in weekly meetings and monthly executive meetings. Prepare a monthly safety report for the project.
• Coordinating with other HSE Managers to ensure that HSE policy is implemented by Contractors.

Projects involved: Juayhmah Gas Plant Saudi ARAMCO (Two Projects) - Saudi Arabia 1) Upgrade JGP Wastewater and Spent Caustic System
2) Upgrade Utility at JGP-Boiler Construction

Safety Engineer في M.R.AL-KHATHLAN FOR CONTRACTING ( Saudi Aramco Oil Company Contractor)
  • المملكة العربية السعودية - جدة
  • يوليو 2005 إلى سبتمبر 2007

• Lead and coordinate with the client (Saudi ARAMCO)Loss Prevention and Safety Department policies and procedure
• Improved the programs from facility modifications to application methods.
• Facilitated training programs concerning all phases of production operations in all personnel levels.
• Developed safety programs and ensured its implementation.
• Assessed project management system and conducted HSE audits.
• Analyzed the deficiencies relating to HSE matters.
• Promote Safety Awareness and enforce Safety Rules
• Ensuring that all HSSE related audits, inspections and checks and carried out in the plant and corrective actions implemented

Projects involved: Saudi ARAMCO Projects Western Region
1) Contract # 6600012792 / BI-00069/03458
Upgrade Two Grades Gasoline 91/95 Asdditional Capacity- SAUDI ARAMCO 2005-2006
Location: Jeddah Refinery
Yanbu Refinery
South Jeddah Bulk Plant
North Jeddah Bulk Plant

2) Contract # 660001741 / BI-03563
Waste Water Treatment Facilities Marine Area - SAUDI ARAMCO 2006 -2007
Location: Jeddah Marine Area
LUBREF AreaParticipated in the following Saudi ARAMCO Projects

PROCESS ENGINEER في Luzon Magnetics,Inc. ( HITACHI METALS-NEOMAX )
  • الفلبين
  • أبريل 2004 إلى أبريل 2005

· Ensures the efficiency and productivity targets are met and initiate continuous improvements on product quality, yields and technologies.
· Providing and establish operating policies and standard procedures.
· Formulates corrective and preventive actions by conducting evaluations for process improvements.
· Establish strategic plans to ensure production schedules are met within established quality and cost objectives.
· Evaluates and analyzes quality problems to ensure high quality level of performance.
· Prepare technical report of the evaluations and discuss the root cause of the problems.
· Develop and execute assembly strategy for new products including design for manufacturability.
· Develop assembly processes, associated fixtures and specialized tools.
· Design different kinds of jigs, carrier gear, fixture board and other different tools used on production using AutoCAD software.
· Promotes safety and good housekeeping within the section.

Process Design في Geltech Metal and Services
  • الفلبين
  • أكتوبر 2003 إلى مارس 2004

ENGINEERING STAFF (AutoCAD Designer)
· Process and line planning.
· Provide immediate countermeasure on material cost based on production consumption (maximize usage of raw materials).
· Investigate and analyzes causes of abnormality in the line and do countermeasure to avoid repetitive problems.
· Reviewing and do counter checking all technical drawings before it will issue to the production.
· Design different kinds of mechanical parts used for automotive and electronics industry.
· Sketching and design special tools as per customer requirements and converted it to AutoCAD drawings.
· Performs such other duties and responsibilities; machine troubleshooting, wiring installation and other engineering jobs.

الخلفية التعليمية

بكالوريوس, Bachelor of Science in Electrical engineering
  • في Mindanao State University-Iligan Institute of Techology
  • مايو 2003

CGPA : 98/100

Specialties & Skills

Production
Refinery
Science
Project Management
Computer literate: AutoCAD 2D&3D Version (R14, 2000,2003), Basic 3D studio Max
Knowledge in SPC, 7QC tools, Six Sigma, Cpk computation and 5’S.
Able to read and interpret technical drawings and schematic diagrams.
Microsoft Office (Excel, Word, Power point), Internet and other computer works.
ISO 14001: 2000(EMS) and (OSHAS) 18001.
Driving skills

اللغات

الانجليزية
متمرّس