MSc Placement with Cementing Team
HALLIBURTON
مجموع سنوات الخبرة :6 years, 0 أشهر
Dissertation/Project Title:
Part 1: “Analysis of the mechanical properties of various oil well cement systems using the WellLife software.”
Part 2: “Analysis of oil well cement shrinkage and identifying a testing method.”
Managed preliminary technical and financial data gathering for the investment projects
•Prepared specs/scope of works where needed for Business Approval Proposal (BAP) purposes or project developments. Created BAP documents in the intranet system.
•Scheduled and monitored program activity to achieve an “on-time” result including follow-up with external suppliers to ensure timely response to action items
•Monitored program cost activity to achieve an “in budget” result using the CAPEX tracker
•Managed technical teams in the installation and commissioning of the following projects: new cigarette line, co-generation and HVAC
•Conducted an inspection of the new cigarette line in
Optimized the water and energy use across all 4 beer breweries in Tanzania
•Designated super-user and trainer of the Montage software that aims at reducing utility consumption & conserving energy
•Conducted a water audit with Camco and then implemented some of their ideas in order to improve our water ratio/footprint
•Aided in providing maintenance to the following utility systems: Natural Gas/HFO Boilers, Ammonia/IMS Refrigeration, Diesel Generators, Compressed Air Plant, Effluent Treatment Plant, Water Treatment Plant, and Carbon Dioxide Plant
•Managed an account whose sole purpose is the reduction of our main incoming electrical, thermal, untreated water, and total energy KPIs (Key Performance Indicators)
Penasquito project, Zacatecas, Mexico
Aided in the pre-commissioning of the Pinto Valley Restart Copper mine site.
•Gathered documentation (i.e. Punch list, Planned Event List) from the area superintendents who in turn obtained it from the contractors that verified the systematic testing of the functional performance of the installed/refurbished equipment and established that it was ready for “commissioning.”
•Verified construction completion and the testing of equipment in the absence of ore and reagents (wet testing).
Engineer-In-Training Registration No
Business Administration Minor
,