مارتن Nock, Marketing and sales Rep

مارتن Nock

Marketing and sales Rep

Hanwill Tyres

البلد
جنوب أفريقيا
التعليم
دبلوم, Elementary Mine Survey
الخبرات
31 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :31 years, 6 أشهر

Marketing and sales Rep في Hanwill Tyres
  • جنوب أفريقيا
  • أغسطس 2015 إلى أكتوبر 2015

Sales and Marketing of all tyre brands to private and bussinesses

Senior Surveyor في Siguiri Gold Mine
  • مارس 2012 إلى مارس 2014
Site Manager في De Beers management
  • جنوب أفريقيا
  • يناير 2012 إلى ديسمبر 2012

12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.

Site Manager Oaks Mine في Mafofela Mining
  • يونيو 2005 إلى ديسمبر 2008

Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Surveyor Open Cast Mine and Site Manager في De Beers Consolidated Mines, The Oaks Mine
  • نوفمبر 2002 إلى مايو 2005

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.

في Self Employed
  • الإمارات العربية المتحدة
  • يناير 1998 إلى نوفمبر 2002

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Site Manager في Benoni
  • يناير 1997 إلى يناير 1998

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

في Rob Stephens CC
  • يناير 1989 إلى يناير 1997

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Surveyor في FDF Civil Contractors
  • يناير 1988 إلى يناير 1989

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Underground Surveyor في Brakpan
  • يناير 1986 إلى يناير 1988

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Manager في Eastrand Region
  • يناير 1985 إلى يناير 1986

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)


Period: June 2005 - December 2008.Retrenched due to operational requirements.

Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.

• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.

Branch Manager في Sterns Jewellers
  • يناير 1983 إلى يناير 1985

Position: Branch Manager
Sterns Jewellers.
Roodepoort.

Period: 1983-1985
Responsibility: 1. Sales and reaching of sales targets.
2. Hire, control and training of staff.
3. Organizing sales promotions.
4. Client liaison.

Underground Surveyor في Westonaria
  • يناير 1980 إلى يناير 1983

Position: Underground Surveyor
Western Areas Gold Mine
Ranfontein \ Westonaria

Period: 1980-1983
Responsibility: 5. Setting out of direction lines and grades for mining purposes.
6. Measurement of face positions for month end payments.
7. Plotting of direction lines and face positions surveyed underground on surface plans.

Senior Surveyor في Aveng Moolmans
  • إلى
Senior Surveyor في PlatiStone
  • إلى

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum

Senior Surveyor في MCC Group
  • الإمارات العربية المتحدة
  • إلى

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group

Senior Surveyor في Mafofela Mining
  • إلى

Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)

Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.


Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane

Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)

Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.


Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg

Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)

Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.


Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)

Surveyor Open Cast Mine and Site Manager في Henzen Civils
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002

Surveyor Open Cast Mine and Site Manager في Rob Stephens CC
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002


Position: Site Manager
Henzen Civils
Benoni

Period: 1997 -1998
Contact Person: Petrus Oosthuizen.

Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site



1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.


Position: Site Manager

Surveyor Open Cast Mine and Site Manager في Roads and Earthworks
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002


Position: Site Manager
Henzen Civils
Benoni

Period: 1997 -1998
Contact Person: Petrus Oosthuizen.

Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site



1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.


Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635

Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.

Surveyor Open Cast Mine and Site Manager في Cons Modderfontein Gold
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002


Position: Site Manager
Henzen Civils
Benoni

Period: 1997 -1998
Contact Person: Petrus Oosthuizen.

Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site



1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.


Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635

Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.


Position: Surveyor
Roads and Earthworks
FDF Civil Contractors

Period: 1988 -1989
Retrenched

Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.

Surveyor Open Cast Mine and Site Manager في Ster Kinekor
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002


Position: Site Manager
Henzen Civils
Benoni

Period: 1997 -1998
Contact Person: Petrus Oosthuizen.

Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site



1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.


Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635

Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.


Position: Surveyor
Roads and Earthworks
FDF Civil Contractors

Period: 1988 -1989
Retrenched

Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.

Position: Underground Surveyor
Cons Modderfontein Gold mine
Brakpan

Period: 1986-1988
Responsibility: 1. Setting out of direction lines and grades for mining purposes.
2. Measurement of face positions for month end payments.
3. Plotting of direction lines and face positions surveyed underground on surface plans.
4. Measure and plot of development face positions.

Surveyor Open Cast Mine and Site Manager في Sterns Jewellers
  • إلى

Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151

Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.


Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002


Position: Site Manager
Henzen Civils
Benoni

Period: 1997 -1998
Contact Person: Petrus Oosthuizen.

Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site



1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.


Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635

Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.


Position: Surveyor
Roads and Earthworks
FDF Civil Contractors

Period: 1988 -1989
Retrenched

Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.

Position: Underground Surveyor
Cons Modderfontein Gold mine
Brakpan

Period: 1986-1988
Responsibility: 1. Setting out of direction lines and grades for mining purposes.
2. Measurement of face positions for month end payments.
3. Plotting of direction lines and face positions surveyed underground on surface plans.
4. Measure and plot of development face positions.


Position: Manager
Ster Kinekor
Eastrand Region

Period: 1985-1986
Responsibility: 1. Sales and reaching of sales targets.
2. Hire, control and training of staff.
3. Organizing sales promotions.
4. Client liaison.

الخلفية التعليمية

دبلوم, Elementary Mine Survey
  • في Chamber of Mines
  • يناير 1983

Elementary Mine Survey. Chamber of Mines. Courses and Training done on Western Areas Gold Mine • Elementary Legal Knowledge. (Certificate) • Elementary Mine Geology. (Certificate) • Elementary Mine Survey. (Certificate) Completed Matric (Grade 12) in 1977

Specialties & Skills

COST CONTROL
DOCUMENTATION
LIAISON
ORDERING
PAYMENTS
RECONCILIATION
SURVEYING
SURVEYOR

اللغات

الأفركانية
متوسط
الانجليزية
متمرّس

العضويات

of special areas committee
  • Member
  • January 2012