Instrument & Control Engineer
PDO
Total years of experience :22 years, 5 Months
Instrument & Control in utility
Governor & gas Turbine protection supervisor experienced in power plants in Bagdad, Iraq and Iran
commissioning and start up of Turbine & Compressor. I was an Instrument supervisor in PTEC CO (contractor commissioning and start up Turbine and Compressor) . My responsibilities were: Loop check and calibration; analyze and trouble shooting Turbine and Centrifuge Compressors & Commissioning; Trouble shooting control system; PLC S7, Wood Ward, Bently Nevada; I taught and trained Loop check and wire check in groups.
As an instrument construction supervisor, I was responsible for construction supervision for all types of instrument devices such as transmitters, Valves positioner, thermocouple and etc; reviewed documents such as vendor mechanical catalogue and Erection drawing (instrument Lay out; Hook up P&ID; Material take off and review instrument data sheets for order Instrument devices.
Pre commissioning and commissioning and maintenance of filed instrument for steam Turbine and Generator at thermal power plant 2*325 MW in Iran.
As an instrument Technician I was responsible for commissioning; Loop check and calibration filed instrument devises.
Instrument maintenance Technician
BS. In instrumentation & control engineering from Shiraz university, Iran
AS. In Electronic Engineering from Tabriz university, Iran