Project Director
GARC SpA
Total years of experience :21 years, 3 months
responsible of foreign projects (UAE and Sultanate
of Oman): new construction of Al-Ghubra office building, 25.000 sqm, 12
storey in Muscat (Oman) - 17M € construction cost; new construction of
Jebel Ali office park, 20.000 sqm, 19 storey in Dubai (UAE) - 20M €
construction cost; industrial plant in port of Duqm (Oman), 12.000 sqm -
5M € construction cost.
Planning of the pre-construction stage: tender analysis, feasibility, bids,
execution strategy, value engineering, subcontractors' contracting.
Direction of the construction stage: supervision of execution, budget and
cashflow control, construction programme control, contract management,
relationships with clients.
- Senior Project Manager of the KAROLKOWA BUSINESS PARK: new
construction of a mixed use scheme of 18.500 sqm GLA and overall
30.000 sqm, 14 storey including class-A Office, residential and retail
spaces in Warsaw (Poland); turn-key project executed by general
contracting - 22M € construction cost - http://www.asbud.com/pl/pagekarolkowa/
karolkowa-business-park/; project developed in a joint venture
including Ablon Group Ltd. and Asbud Group https://www.asbud.com/,
private real estate developer. Responsible for the direction and
management of the construction process.
Senior Project Manager and Hotel's specialist consultant of the
HOTEL MARRIOTT COURTYARD, new construction of a 4-star hotel, 235
rooms, 6 storey, part of a mixed-use scheme of overall 126.000 sqm in
Budapest (Hungary); turn-key project executed by construction
management - 25M € construction cost -
http://www.marriott.com/hotels/travel/budcy-courtyard-budapest-citycenter/,
http://www.cpigroup.hu/en/project/324#3; Responsible for the
project development and for the construction process; hotel specialist
consultant.
Project Manager of the EUROPEUM FASHION CENTER, new
construction of a shopping mall of 3 storey and 6.500 sqm, part of a mixeduse
scheme of overall 126.000 sqm in Budapest (Hungary); turn-key
project executed by construction management - 6M € construction cost -
http://www.europeum.hu/en/, http://www.cpigroup.hu/en/project/326#4
Responsible for the project development and construction process during
the finalization phase.
- Project Manager of the HOTEL PALAZZO ZICHY: refurbishment of a
listed historic palace in a 4-star superior boutique hotel, 80 rooms, 3.500
sqm 6 storey in Budapest (Hungary); turn-key project executed by
construction management - 6, 5M € construction cost - (ranked 16th of “Top
25 Hotels in the world” and 6th of “Trendiest Hotels” in Europe in 2010 by
TripAdvisor's users) www.hpz.hu, http://www.savim.biz/en/hotel-zichy.
Responsible for the multidisciplinary design coordination and for the
procurement and execution of the interiors and FF&E, reporting to the
Project Director.
- Project Manager for the interiors and FF&E of the SAVHOTEL: new
construction of a 4-star business hotel, 120 rooms, 6.300 sqm, 7 storey in
Bologna (Italy); turn-key project executed by construction management -
9M € construction cost - http://www.savhotel.com/,
http://www.savim.biz/en/savhotel. (note: project joined during the
superstructure stage) Responsible for the design, the procurement and the
execution of interiors and the FF&E.
- Project Manager of the AC HOTEL BOLOGNA: new construction of a 4-
star business hotel, 127 rooms, 6.500 sqm, 7 storey in Bologna (Italy);
turn-key project executed by construction management - 10M €
construction cost http://www.marriott.com/hotels/travel/blqbo-ac-hotelbologna/.
Responsible for the project development and construction
process, acting as General Contractor service provider.
Project Manager of the AC HOTELS ITALIA HEADQUARTERS
OFFICES: fit-out of an office building 1.500 sqm 3-storey in Bologna (Italy)
- 1M € construction cost. Responsible for the fit-out phase.
Responsible of design and construction supervision for several projects of refurbishment and conversion to residential of historical buildings in Bologna.