Mayor Kumar, Head  (Engineering),

Mayor Kumar

Head (Engineering),

LSI Engineering and Consultants Ltd, New Delhi.

Lieu
Inde
Éducation
Master, Environmental Engineering
Expérience
36 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :36 years, 10 Mois

Head (Engineering), à LSI Engineering and Consultants Ltd, New Delhi.
  • Inde - Delhi
  • Je travaille ici depuis mai 2015

• Raising of Water and Wastewater Division for the Start-up by
aggressive business development by tying up with well
established reasonable sized Engineering Consultancy firms.
• Preparation of Technical and Financial proposals.

Consultant (Deputy Team Leader) à NJS Engineers India Pvt Ltd.—New Delhi.
  • Inde - Delhi
  • mai 2014 à mai 2015

• Managing the Yamuna Action Plan-III (JICA funded )for the
Delhi Jal Board which included preparation of DPRs for
rehabilitation of WWTPs by improving the treated effluent
standards & rehabilitation of gravity sewers and pumping
mains using Trench-less techniques.
• Getting DPRs approved by Third Party Inspection ( IIT
Roorkee) before submission to the Central Ministry.
Preparation of Contract documents on DBO basis
including O & M for 10 years.It included following Packages:

1. Construction Of New Okhla Phase - I Wastewater Treatment
Plant of 30 MGD with Effluent Standards Of BOD - 10 mg/l,
TSS - 10 mg/l or better and Power Generation On Turnkey
Basis and then Demolition of Existing
Phase - I WWTP under YAP (III)
2. Rehabilitation and Up-gradation of Okhla - Phase II 12
MGD, Phase III 45 MGD & Phase IV 37 MGD Wastewater
Treatment Plants with effluent standards
of BOD -10 mg/l, TSS - 10 mg/l or better under YAP (III)
3. Rehabilitation and Up-gradation of Kondli - Phase I \{45.5
MLD(10 MGD)\}, Phase II 25 MGD & Phase III 10 MGD
Wastewater Treatment Plant with effluent standards of
BOD -10 mg/l, TSS - 10 mg/l or better under YAP (III)
4. Rehabilitation and Up-gradation of Rithala Phase - I
Wastewater Treatment Plant 40 MGD with effluent standards
of BOD -10 mg/l, TSS - 10 mg/l or better under YAP (III)

• Preparation of Technical Bid Evaluation Report
• Attending YAP-III Progress Review Meeting with the client
representing a Consortium of NJS Consultants, AECOM,
TTI and NJSEI.

Principal Consultant(Water &Wastewater)/Associate Director( Water & Wastewater) à Scott Wilson India Pvt Ltd / URS Scott Wilson India Pvt Ltd./ URS—New Delhi/ Gurgaon
  • Inde - Delhi
  • juin 2009 à février 2014

• Design of Sewerage and Water Supply Schemes.
Preparation of Tender Proposals.
• Attending negotiation meetings with the client and signing
Consultancy Contract Agreement. Mobilization of the
Consultancy Team to project site.
• Attending the project review meetings with the client.
• Worked on ADB, World Bank, JnNURM & Fifth Finance
Commission funded projects.
• Following projects were undertaken:--
--24X7 Water Supply Scheme for 5 towns for BUIDCo\[As W/S
Designer &Project Manager\]
--Improvement of integrated Sewerage Scheme of
Bhubaneswar city under OWSSB -- JnNURM & Finance
Commission.--\[As Project Manager and Sewerage
Engineer\]
It involved design of STPs( based on Extended Aeration
treatment process) & SPSs.
Preparation of Contract documents on DBO basis including
O & M for 10 years.

--Preparation of complete DPR for Sewerage & Non
Sewerage Schemes incld Feasibility report and City
Sanitation Plans for Package-1 for seven towns for
Uttrakhand Pey Jal Nigam (World bank funded Project) ----
\[As Team Leader\]
It involved design of Sewerage system including SPSs and
STPs.
--Preparation of DPR for rural water supply on PPP Model
including transaction advisory for implementation of
scheme for Agra-Saharanpur for UP Jal Nigam.\[As Project
Manager\]
--Consultancy of Infrastructural Project of 10 ULBs under
Karnataka Municipal Reform Project(World bank funded)--
\[As Project Manager\]
--Preparation of DPR of storm-water drainage network of
Industrial Sector 1 to 11 of
Noida for HUDCO--\[As Project Manager\]
--Preparation of Sewerage System DPR for Panihati under
Kolkata Municipal Development Authority.---\[As Project
Manager-cum-Sewerage Engineer\]
It involved design of Sewerage system including SPSs and
STPs
--Bina Complex Irrigation & Multipurpose Project for WRD,
M.P.\[ As Project Manager\]
--Assessment of Utility Services and infrastructure of Township
for its refurbishment ---\[As Sewerage & Water Supply
Expert\]
Gave a lecture on "Sewerage Conveyance System" India
Infrastructure Pvt Ltd Conference.

Team Leader-cum-Water Supply Engineer / General Manager (PHE) à Intercontinental Consultants and Technocrats Pvt Ltd
  • Inde
  • septembre 2007 à mai 2009

• Undertook preparation of DPRs, Contract Documents on
DBO Basis including O & M for 10 years, , floating of
tenders, Technical and financial evaluation of bids, award of
contracts & construction supervision including Quality
Control as Team Leader for all the Packages of Urban
Sector of ADB funded project for Jammu & Kashmir
Economic Reconstruction Agency. The packages were as
follows:
--Laying, jointing and testing of water transmission mains for
Rangil Water Supply Scheme
--Laying, jointing and testing of water transmission mains for
Nishat - Talemanzil
--Laying, jointing and testing of water transmission mains for
Doodhganga Water Supply
--Construction of 16 No. Toilets.
--Revamping of existing 5 No. Water Treatment Plants at
Srinagar
--Construction of primary, secondary & main drains\[ Pohru to
Bemina Chowk\] incld PS.
--Construction of storm water network incld PS \[Tengpura to
Rawalpura\] .
As General Manager(PHE) undertook design of Water Supply using EPANET /WATERCAD .

General Manager (Operations) à Shriram EPC—New Delhi
  • Inde - Delhi
  • mai 2007 à septembre 2007

• Undertook the rehabilitation of brick barrel from Pili Kothi to
Ajmeri Gate & from Ajmeri Gate to Indian Express sewer. It
involved carrying out following activities:
--Approval of methodology of rehabilitation of sewer by Delhi Jal
Board .
--To brief media at the project site.
--To attend review meetings with Joint Venture Partner/Client.
Liaison with civic agencies

Director (Design), Superintending Engineer à Military Engineers Service, Director General (Naval Projects) Vizag.
  • Inde
  • novembre 2006 à mai 2007

Oversaw the Project Management activities, Infrastructure Development, Facilities Renovation, expansion of various Structures, for Port and Harbour works

Staff Officer (Public Health) / Joint Director(PHE), à Military Engineers Service—CE Zone Pune/ ADG Design & Consultancy, Pune/ AHQ, Delhi
  • Inde
  • décembre 1999 à novembre 2006

• Carried out Structural Design of technical buildings & up to
4-storeyed Married Accommodation, Under/Ground tanks
using STAAD PRO & STRUDS software.
• Design of central Sewerage Scheme for Bhuj (AF), Ambala
Cantt, Adampur (AF) Andaman & Nicobar(AF), Ambala (AF)&
Agra (AF) Station including STPs and SPSs.
• Developed a program on Excel for Hydraulic & Structural
design of sewer network. ·
• Published articles “Trench less Construction Techniques” &
“Problems Afflicting Sewerage Systems” in the magazine of
ADG (D & C) Pune.
• Drafted and issued the policy on Tertiary treatment and
Recycling of sewage. ·
• Scrutiny of Water Supply Agreements between State and
Defence. ·
• Presented Technical Papers (a) " Water Supply Distribution in
Sub-Zero Region" at an International Conference organized
by Chief Engineer Srinagar Zone at Leh in 2004. ·
(b) "Rainwater Harvesting- A need of hour "at a
National conference organized by MES & DRDO at New Delhi
in Aug 2005.
• Gave a lecture on "Wastewater Management in Military
Cantonments" in a Central Air Command Conference.

Garrison Engineer (AF) Suratgarh à Military Engineers Service---Air Force Station Suratgarh
  • Inde
  • août 1995 à janvier 1999

• Design, tendering and execution of augmentation of
Sewerage Scheme of Cantt. including Stabilisation Pond
and SPS.
• Was Head of nearly 300 industrial, basic staff with a team
of 5 No. Site Executives.
• Provided entire infrastructural support to an Operational Air
Base including O and M of AC plants, 33kV Sub Station,
Transformers, DG sets, Runway, Taxi Track including
Shoulders, Blast Pens, Technical and Residential
Buildings, 3 Lakhs gallon capacity Water Treatment Plant,
water distribution network, sewerage system including
Stabilization Ponds .
• Planning of works, preparation of tenders and
implementation works.
• Oversaw the O & M of a Water Treatment Plant comprising
of storage of 100Million Gallons U/G tanks followed by
Clari- flocculator, Rapid Sand filters, chlorinator and
pumping station.
• Submitted a paper “Improvement of Sewerage System of
AF Station” to Water Asia.
• Undertook Rehabilitation the Hangar of size 30m x 90m
Rehabilitation the Hangar of size 30m x 90m within a
record time .

AGE & Staff Officer (PHE) (Class I Gazetted Officer recruited by UPSC), à Military Engineers Service
  • Inde
  • juillet 1986 à septembre 1995

• Was responsible for maintenance of external water supply, sewage disposal,
buildings and roads.
• Was responsible for design and scrutiny of water supply and sewerage schemes at E-in-C's Branch Army Headquarters.

Éducation

Master, Environmental Engineering
  • à Indian Institute of Technology Roorkee
  • mai 1985
Baccalauréat, Civil Engineering
  • à Indian Institute of Technology, Delhi
  • mai 1982

Specialties & Skills

Public Health
Military
Preparation
Project Management
Monitoring of progress & Budget
Contract Administration
Construction Supervision
Quality Assurance/Quality Control
Preparation of Contract Document
Technical Evaluation of Bid
Financial Evaluation of Bids
Leading the Team
Material Testing

Langues

Hindi
Langue Maternelle
Anglais
Expert

Adhésions

Indian Water Works Association.
  • Life Member
  • July 2004
Indian Council of Arbitration
  • Fellow
  • November 2013