مازن محمد, Piping, pipeline and precommissioning Engineer

مازن محمد

Piping, pipeline and precommissioning Engineer

LEAD

البلد
سوريا - حمص
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
16 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 10 أشهر

Piping, pipeline and precommissioning Engineer في LEAD
  • سوريا - حمص
  • أشغل هذه الوظيفة منذ أغسطس 2007

Feb. 2011 to March 2012
Asab FFD Project CatCroup ( UAE ) http://www.catgroup.net/

Construction Manager for Asab full field development ( FFD). The project scope is construction of 74 line of water and gas lines connecting the stations in asab and delivering gas and water to well heads for injection. The sizes of the lines are from 4” to 30”. The owner of the project is ADCO and the main contractor is PETROFAC.

August 2010 to Feb. 2011
Disi-Mudawarra to Amman Water Group Five International
Conveyance System Project ( Jordan ) http://www.groupfive.co.za/

Construction Manager for the construction of 66” Water pipeline, 120 km from Amman to Maan.

Oct. 2008 to July 2010
JHAR STG 3 Gas project LEAD Contracting ( Syria)
http://www.lead-co.com/

Senior Pipeline and Pre-commissioning Engineer for JHAR Gas Project owned by HPC (Haian Petroleum Company), and the main contractor is Petrofac, my job is to execute all the activity of constructing the pipelines( 10” ) and flow lines ( 8”, 6”, 4” ) of the plant (excavating, welding, insulating, laying in trench, backfilling, tie-in’s) and be sure it’s according to specifications,
Pre-commissioning (cleaning, Hydro testing, dewatering and drying) of the plant, sub stations, flow lines and pipelines.
The capacity of the plant is 4 million cubic meter.

Ebla Gas Project

Senior Piping and Pre-commissioning Engineer for Ebla Gas Project owned by PetroCanda, and the main contractor is Petrofac; my job is to execute all the activity of piping (welding according to isometric in workshop, field weld on site for the spools and tie-in’s) and pre-commissioning (cleaning, Hydro testing, dewatering and drying) of the plant, substation, flow lines ( 6”, 4”)and pipelines (18”, 16”).
The capacity of the plant is 5 million cubic meter

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Damascus University
  • نوفمبر 1999

Specialties & Skills

Project Collaboration
Proficient in the use of Microsoft Windows 2000/Mi/XP, MS Word, Office, Project and Excel.

اللغات

الانجليزية
متمرّس