مظهر حسين, Lead Planning  and Estimation Engineer

مظهر حسين

Lead Planning and Estimation Engineer

Olayan Descon

البلد
المملكة العربية السعودية - الجبيل
التعليم
بكالوريوس, Mechanical engineering
الخبرات
17 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 9 أشهر

Lead Planning and Estimation Engineer في Olayan Descon
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ مارس 2015

• Responsible for implementation of best planning and scheduling practices in and assignment/project
• Planning Focal Point project scope, schedule and cost.
• Develop and maintain planning control structures in alignment with approved project Work Breakdown Structure (WBS).
• Develop and maintain baseline resource and cost loaded schedules using Primavera P6 software.
• Monitor and control planning activities and costs through all phases of project lifecycle.
• Liaise with engineering, procurement and construction functions, and others as required, including third parties, to ensure awareness of project activities, their status, and their impact on the project schedule and manpower requirements.
• Provide project progress reports consist of plans and schedules as per project reporting requirements.
• Produce and issue updates to project plans and schedules and resource requirement to meet project milestones and goals in timely manner.
• Evaluate schedule and cost impact of scope change and notify management for the same.
• Monitor overall project progress status, achievement of major milestones, and analyse project performance in relation to planned performance.
• Participate in project progress and performance status meetings.
• Delegate and manage the work of subordinate Project Controls planning staff and provide guidance as required.
• Ensure accurate and timely control and forecasting of man-hour budgets and ensure that the impact of all change requests are properly assessed and included in the schedules.
• Participate in schedule risk analysis as required.
• Ensure implementation of company Quality Assurance systems and procedures.
• Ensure personal safety and working as per company HSE procedures.
• Project schedules shall be maintained in accordance with approved contract and project Work Breakdown Structure.
• Ensure that project schedules are logically linked and show the critical path and total float for all activities.
• Ensure milestones shall be clearly identified within the project schedules and standard set of agreed milestones shall be maintained within both the schedule and the cost reporting database.
• Facilitates scheduling process with Project Management, estimating, design and engineering.
• Freeze project schedule base-line at the time of approval by the client.
• All project schedules resources loaded in accordance with the company standards.
• Provide site management information regarding manpower, equipment and material forecasts.
• Status meetings provide progress reporting documents and briefing materials.
• Alert management and all departments of critical delivery dates.
• Provide clear, accurate and complete scheduling data to Project Team to accomplish the schedule and updates to properly convey project status.
• Manage the schedule change management process.
• Critical Path Method (CPM) Scheduling.
• Periodic Scheduling Updates.
• Construction Project Acceleration.
• Schedule Delay Analysis and Quantification.
• Total Float Management.
• Time Impact Analysis.

Project Planning and Control Engineer في China Petroleum Engineering and Construction Corporation
  • العراق
  • أبريل 2014 إلى فبراير 2015

Project Planning and Control Engineer
I worked as Planning Engineer in CPECC on “Field surface facility expansion project Ahdeb Iraq”.
• Review Primavera P6 schedule submitted by construction contractor and finalize baseline schedule.
• Review weekly, monthly progress reports from contractors and compile overall project progress reports.
• Coordination and follow-up with engineering, procurement and construction to meet upcoming milestone dates.
• Preparation of catch-up / mitigation plans in case of considerable delay.

Lead Planning & Control Engineer في Descon Engineering Ltd Qatar L.L.C
  • قطر - الدوحة
  • يونيو 2012 إلى مارس 2014

LEAD PLANNING AND CONTROL ENGINEER, MAY-2012 TO PRESENT

I worked as Planning Engineer on “QATARGAS brown field Projects”. These are EPC Projects undertaken by Descon.
As project planning engineer, my roles & responsibilities have been as follows:
• Managing the planning and scheduling parts of assigned projects, resource allocation and performance progress.
• Prepared the EPC and construction schedule in Primavera P6 and perform CP analysis. Prepare schedule performance measurements reports, forecasts and studies on a regular basis.
• Develop and implement Project Execution Plan scheduling documents related to project control procedures in conjunction with supporting project ancillary functions.
• Perform schedule analysis of alternative studies and schedule impact of scope adjustments before and during schedule deviation negotiations.
• Develops plans and provide recommendations for mitigation of impacts of schedule issues and problems.
• Provide project management consultation & schedule risk factors on factors affecting the timely completion of projects.
• Project Costing, Budgeting, Earned value management and Forecasting by calculating TCPI, ETC etc
• Project Procurement
• Generating look-ahead plans for construction team
• Managing and monitoring subcontractor construction activities
• Developing contingency manpower and resource deployment plans for meeting deadlines
• Verification of invoices raised by subcontractors during the course of project
I worked as Turnaround Planning Engineer successfully completed following Turnarounds
Qatar Gas Operating Company
• QG2 Turnaround 2012 SEP~OCT (LNG Train 4 & Train 5)
• QG1 Turnaround 2013 MAY~JUN (LNG Train 3)
• QG3 Turnaround 2013 OCT~NOV (LNG Train 6)
Role and Responsibilities
• Prepared level 06 plan on P6, resource loading, developed S’ curve for progress monitoring.
• Scope management, Scope verification, monitoring and control.
• Preparation of work packages.
• Preparation of Proposals at bidding stage. Estimation of time cost and resource for proposal against RFP’s from different clients.

Planning and Cost Engineer في Descon Engineeering Ltd
  • الإمارات العربية المتحدة - أبو ظبي
  • أبريل 2011 إلى مايو 2012

DESCON ENGINEERING LTD, ABU DHABI UAE

PLANNING AND COST CONTROL ENGINEER April 2011 - May 2012

Worked as the Planning Engineer Mechanical (Piping, Equipment and Steel Structure) on “Integrated Gas Development Plant Habshan - 5 by GASCO”.
Project was undertaken on EPC basis by Joint venture of JGC and Technimont for Process Area and Hyundai for Utilities. Descon worked as the subcontractor to JGC for construction works (Civil, Mechanical, Electrical and Instrumentation).

My role as Project Planning & Cost control Engineer involved performing various activities such as:
• Managing the Integrated change control by close coordination with all 3 phases of the project, Engineering, Procurement, and Construction as well as with Project Sponsors, Project management team and Client
• During Planning phase review of the contract draft and Bid documents for developing the scope Baseline, Identification of Key points in SOW (Scope Of Work) for developing the WBS structure, Clarification of ambiguous points in contract draft for clear scope definitions
• Maintain the current and baseline schedule, analyze the effect of proposed changes and maintain the baseline change control authorization process
• Prepare regular status reports and forecasts for project management and client review.
• Development of cost performance Baseline for Equipment and Manpower to reflect detailed estimation of costs.
• Development of Schedule Baseline Plans on P6.
• During monitoring phase controlling the schedule by developing latest forecasts of baseline plan. Development of Level-IV Plans, Monthly Execution Plans, and Three weeks look ahead Plans, Catch-Up Plans and Project success sheet throughout the life cycle of the project.
• Preparation of schedule of quantity of material with reference to IFC drawings, BOQ and project specification, sorting all the ambiguities with the client.
• Prepare MRP (Material Requirement Plan) and submission of selected material for approval and handled procurement activities related to contract in accordance with the company procedure.

Sr Mechanical Engineer في Sitara chemical industries ltd
  • باكستان - فيصل أباد
  • أغسطس 2006 إلى أبريل 2011

Sitara Chemical Industries LTD Pakistan. (SCIL)
PLANNING ENGINEER (MECHANICAL) 2006 to 2011
Job responsibilities:
• Plan for Routine/ Shutdown/ Turnaround Maintenance Activities (Preventive, ‎Corrective, Predictive & Modification Jobs) by arranging internal & external resources ‎like services and material (available in stock and non-stock items)‎
• Schedule Preventive & predictive maintenance work orders for Rotary ‎and Stationary Equipments.‎
• ‎ Involve in modification jobs for carrying out Feasibility study, preparation of design ‎packages including BOM and planning for execution through internal/ external ‎resources.‎ ‎
• Assess man-hour and equipment availability data for scheduling work orders for the ‎purpose of planning, prepare weekly schedules, and coordinate the inter-departmental ‎work.‎
• Prepare annual maintenance budget for mechanical activities and monitor the ‎utilization of the same on quarterly basis and report the same to Management.‎
• Ensure that equipment history as a result of any major maintenance activity carried out ‎is captured in the CMMS. ‎
• ‎ Support Reliability and Inspection teams by providing with data for Equipment history ‎tracking, rework done in maintenance activities and analysis of frequent failures. ‎‎
• ‎‎ Manage external resources through administering Contracts for the same. Tracking of ‎Contract expenses and report to management for budget utilization through Cost ‎Reports.‎
• ‎‎ Assess man-hour and equipment availability data for scheduling work orders for the ‎purpose of planning, prepare weekly schedules, and coordinate the inter-departmental
• Involved in implementation of Quality systems certification ISO 9001:2000/ 14000‎
• Monitoring, tracking and interpreting the progress of projects to accurately forecast resources required (cost and manpower).
Projects completed at SCIL
• Erection and commissioning of Membrane II plant (Caustic Soda plant) (UHDENORA Milano Italy). 135 ton/day capacity
• Chlorinated paraffin wax plant. Piping and equipment fabrication (12 ton/day)
• Calcium chloride plant. Piping and equipment fabrication (50 ton/day)
• Oxygen and Carbon dioxide installation and piping. (10 ton/day)
• Caustic solidification plant (BETRAMS Germany) III&IV equipment fabrication &installation piping and commissioning. (50 ton/day& 100 ton/day)
• Shut downs of caustic solidification and bleaching plants.
• Installation of two gas powered (DEUTZ) engine generators (7.8 MW) including boiler, cooling towers, compressors, RO water unit installation and related piping
• Ammonium Chloride plant. 10 ton/day capacity.

الخلفية التعليمية

بكالوريوس, Mechanical engineering
  • في National university of scirnce and technology
  • أغسطس 2006

2006 NATIONAL UNIVERSITY OF SCIENCE AND TECHNOLOGY (NUST) PAKISTAN NAVY ENGINEERING COLLEGE KARACHI BE (Mechanical Engineering) 2002 Federal Board, Islamabad HSSC 2000 Sargodha Board, Sargodha. SSC

Specialties & Skills

Project Plans
Primavera P6
Maintenance Planning
Project Management
Earned Value Management
implentation of ASME and API stansards

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Project Management (تدريب)
معهد التدريب:
PMI USA
تاريخ الدورة:
May 2013
Costing and Budgeting (تدريب)
معهد التدريب:
Descon
تاريخ الدورة:
October 2012