Electrical Engineer
Capital Group
Total years of experience :2 years, 5 Months
a) Organization: Capital Group
b) Job title: Electrical Engineer
c) Job duration: From 01 February 2013 to till now.
Responsibilities:
➢ To Design & Drawing Electrical Layout at Capital Design-2 (New Project)
➢ To Maintain 1250 KVA Sub-Station & Generator and IPS.
➢ To Maintain load consumption for all parties
➢ Follow-up Gas, Water supply, Fire protection, Staff 's Duty roster & Security roster.
.
Job Experience (b):
a) Organization: High Energy Company Ltd.
b) Job title: Engineer Co-Ordination
c) Job duration: From 01 January 2011 to January 2012.
Responsibilities:
❖ Banding &Commissioning Sub-Station.
❖ Supervising & Installation Sites.
❖ Follow up Purchas Raw Materials
Job Experience (c):
a) Organization: Shakti Engineering Ltd.
b) Job title: Assistant Engineer
c) Job duration: From 01 February 2007 to from 31 January 2012.
Responsibilities:
♦ Troubleshooting & Maintenance of VSAT
♦ Survey & Marketing VSAT
♦ Keeping correspond with Satellite company to establish link
♦ Keeping correspond with Satellite company to establish link
♦ To Design & Drawing Electrical Sub-Station layout.
Job Experience (d)
a) Organization: Silver Disc Company ltd.
b) Job title: Junior Engineer
c) Job duration: From 01 January 2003 to 2005.
Responsibilities: ❖ Operation & maintenance computer based Moulding matching (PLC Based)
❖ Operation & maintenance Sub- Station
B Sc in EEE Electrical & Electronics Atish Dipankor University 2013 3.39 Out of 4
Diploma in engineer Electrical Sylhet Polytechnic Institute 2002 First Division
S.S.C Science Dhaka 1998 First Division Computer Skill: (a) Operating system: Windows -7, 98, XP, Vista. (b) Application: Ms Office, Inter net browsing, Outlook Express
Academic Qualification: Name of Exam Subject Board/Institute Passing Year Division
(c) Graphic design: Auto-Cade, Photoshop-CS, Illustrator. (d) Hardware: Familiar with Hardware Maintenance and Trouble Shooting, Computer Assembly. Industrial Training: Training at Sylhet Poly Buddit Sumity-1 (Durition: 60days) • operation and maintenance transmission and distribution line • operation and maintenance Sub-station • Pepper Billing System