Trainee
Next Step IT
Total years of experience :1 years, 8 Months
End of Study Project: Extraction of a network matrix from a network capture
In this project, we analyzed the flow matrix of our firewall Cisco ASA 5505. We
configured our ASA 5505, also the trio of ElasticSearch, Kibana and Logstash to
collect and view our Syslog. Logstash is our Syslog server. ElasticSearch is our
database and Kibana is our web interface for viewing logs.
Professional Personnel Project: Estimated by the method of moments SNR in a SIMO wireless channel
Through the study of time based on the estimated SNR are M2M4 and GT. We will eventually introduce a new method for estimating M4 will be the best for times compared to previously used and it is through the evaluation of SNR performance of different estimators by Monte Carlo method
End of Study Project: Implementation of a simulator and performance evaluation a DVB-T2 chain The objective of our project is to study the DVB-T2 standard, to implement the tool MATLAB issue a chain of Transmit / Receive in hierarchical mode accordance with the parameters of the ETSI EN 302 755 and evaluate performance of the implemented system.
Mini project : Optimization of UMTS network
This work focuses on the analyses and the optimization of UMTS network. We
discussed this theme with an overview of the UMTS, WCDMA radio various network
interfaces. Then we studied the different optimization techniques especially Test Drive
and the quality indicators.