Construction Site Manager
Julius Berger Nigeria
مجموع سنوات الخبرة :16 years, 4 أشهر
Dualization of Ahoada - Omoku Road, Tank Flyover, 11th and 12th Flyover, Dualization of Azikiwe/Iloabuchi Road, Ring Road, Elebele Opolo Road, Emouha Degema Road
Abuja Kano Road Rehabilition Project - 390 km
Gold mining project
Tekirdağ Muratlı Motorway - Modified Bitumen Aspahlt work
26 km - 45.000 ton - Drainage channel 29 km - Guardrail 36
km - 14.000 m3 Concrete
YAPI YAPI CONSTRUCTION -
Works of Istanbul
Metropolitan Municipality
* 17 sports complexes were repaired. Some of those;
* Sinan Erdem Sports Complex
* Bahçelievler Swımmıng Pool
* Hıdayet Turkoğlu Sports Complex
* Bayrampasa Sports Saloon
* Cebeci Spor Complex
* Okcular Vakfı
* Sılıvrıkapı Ice Pıst
- -Service Road Construction between Pendik and Çayırova on the D100 Highway
14 km 2x3 lane additional road on main road,
400.000 m3 earthworks, 50.000 m3 concrete,
25.000 m pile construction ...
10 km retaining Wall, 4 bridge, 1 Underpass, 3 roundabout
Antalya 2. Stage (Square- Airport-EXPO 2016) Light Rail System Construction
Antalya 2. Stage (Square- Airport- EXPO 2016) Light Rail Suppy, Installation and Commissioning Works of Electromechanical Systems With System Construction
- North Marmara Highway
4.500.000 m3 earthworks and fillings
Box culvert constructions
-Europe Second Area, Year 2012, 2. and 3. part Waste Water, Rain Water Channels and Stream Reclamation Works in Istanbul
• 180 km waste water, rain water channels Works.
• 12 km stream reclamation Works.
-Repair and Maintenance Works for Viaducts, Bridges and other Major Engineering Structures located on İstanbul Ring Roads, TURKEY
Repair works for viaducts and bridges including exit and access road connections. The works consists of repair works for viaducts and bridges including exit and access road connections. Asphalt replacement and painting steel safety rail bars at Bosporus Bridges, insulation work and mastic asphalt replacement on FSM Bridge deck, repainting of interior and exterior surfaces of Bosporus bridge deck. Under the scope; 51.000 ton mastic asphalt, 540.000 ton bituminous hot mix, 20.000 ton plentmix base, 20.000 ton plentmix sub base, 16.800 m bored pile, 140.000 m3 cut excavation and 10.000 m3 concrete works were completed
- Maklim Ambarlı Port / TURKEY
250.000 m3 filling in the sea for RO-RO Port
- Batinah Coastal Road Section I: Barka to Wadam as Sahil (Km: 0+000 - 59+500) / OMAN
Construction of 60, 8 km and 2x2 lane coastal road. Project also comprises 80 km of service road, 15, 5 km of connection road, enginnering structures, 17 roundabouts and 10 bridges. Under the scope; 7.800.000 m3 excavation, 7.770.000 m3 filling, 120.000 m3 concrete, 17.500 Ton construction steel, 3.166.000 ton plentmix and 982.000 Ton asphalt were also completed.
- East-West Motorway DIDOUCHE MOURAD-Section 2- Camp 7, Construction of Major Engineering Structures, ALGERIA
- East-West Motorway DIDOUCHE MOURAD-CW 128 Section - Camp 3&4, Construction of Minor Engineering Structures / ALGERIA
Construction of viaduct, bridge and box culvert structures
- Bomonti Tunnel Exit Junction and Road Arrangement, Turkey
- Completion of Incomplete Electro-mechanical and Other Remaining Works for Kağıthane-Piyalepaşa- BomontiDolmabahçe-Road Tunnels, Turkey
This project provides safe and continuous connection from the exit at Bomonti of Kağıthane-Piyale Paşa- BomontiDolmabahçe Tunnel to the ring road.
Yeniyuzyil University - Occupational Health and Safety
CIVIL ENGINEERING