Total des années d'expérience: 13 Années, 2 Mois
août 2010
A juin 2014
Quality Assurance Manager
à Jose Cartellone Construcciones Civiles S.A.
Lieu :
Bahamas
Created a Quality Management Plan in lieu with project specifications and ISO 9001 requirements; in addition to quality control reports, method statements, post-construction reports and detailed progress reporting.
Monitored a team of Inspectors for daily inspections
Developed analytical spreadsheets for Lab Testing and Quality Control Records
Prepared material submissions for Engineers approval. Prepared Request for Inspections and Request for Information (RFI's)
Formulated inspection and information schedules
Responsible for developing, implementing, and maintaining inventory control processes, ensuring security and accountability of inventory, documenting transactions and developing inventory systems to maximimze turn ratios.
Managed a Change Management System
Lead Auditor in carrying out ISO 9001:2000 system audits
Monitored a team of Inspectors for daily inspections
Developed analytical spreadsheets for Lab Testing and Quality Control Records
Prepared material submissions for Engineers approval. Prepared Request for Inspections and Request for Information (RFI's)
Formulated inspection and information schedules
Responsible for developing, implementing, and maintaining inventory control processes, ensuring security and accountability of inventory, documenting transactions and developing inventory systems to maximimze turn ratios.
Managed a Change Management System
Lead Auditor in carrying out ISO 9001:2000 system audits
août 2008
A juillet 2010
Quality Control Manager
à E. Pihl & Sons A/S (INT’L)
Lieu :
Jamaïque
Highway Improvement project / Wharf Expansion Project
Implemented the Quality Management Plan in lieu with project specifications and ISO 9001 requirements; in addition to quality control reports, method statements, post construction reports and detailed progress reporting at site for a 100km Highway Project.
Verify that the quality related site activities were in compliance with the applicable contract codes and standards Submittal management & control of documents and document changes, prepared submittals to contract specification.
Identified delivered materials and equipment by specs based on the approved standards laid down by the contract. Subcontractor and supplier control: Conducted external quality audits.
Inspection and testing plan: Elaborated / Developed Inspection & Testing Plans as per specifications, Codes & Standard practice.
Generated and identified all definable features of works (developed method statments).
Conducted Quality Induction Meetings, prior to the start of any definable features of work.
Mock-up samples initial and follow up inspections. Wrote surveillance reports. Identified “Hold Points” per specification.
Control of measuring and testing equipment; verified all calibration report for equipments, welders certifications etc.
Preventative action and control of nonconforming conditions: Generated nonconforming conditions and generated Preventive Action based on the existing problems and compliance.
Conducted internal and external (Sub-contractors) quality audits.
Developed statistical analysis such as random sampling.
Implemented the Quality Management Plan in lieu with project specifications and ISO 9001 requirements; in addition to quality control reports, method statements, post construction reports and detailed progress reporting at site for a 100km Highway Project.
Verify that the quality related site activities were in compliance with the applicable contract codes and standards Submittal management & control of documents and document changes, prepared submittals to contract specification.
Identified delivered materials and equipment by specs based on the approved standards laid down by the contract. Subcontractor and supplier control: Conducted external quality audits.
Inspection and testing plan: Elaborated / Developed Inspection & Testing Plans as per specifications, Codes & Standard practice.
Generated and identified all definable features of works (developed method statments).
Conducted Quality Induction Meetings, prior to the start of any definable features of work.
Mock-up samples initial and follow up inspections. Wrote surveillance reports. Identified “Hold Points” per specification.
Control of measuring and testing equipment; verified all calibration report for equipments, welders certifications etc.
Preventative action and control of nonconforming conditions: Generated nonconforming conditions and generated Preventive Action based on the existing problems and compliance.
Conducted internal and external (Sub-contractors) quality audits.
Developed statistical analysis such as random sampling.
juillet 2006
A juillet 2008
Quality Control Manager
à Kier Construction Limited (KIER GROUP INT’L)
Lieu :
Jamaïque
Airport Expansion project-
•Quality Management Plan in lieu with project specifications and ISO 9001 requirements; in addition
to quality control reports, method statements, post construction reports and detailed progress
reporting
Monitored a Team of Inspectors for Daily Inspection
Developed analytical spreadsheets for Lab Testing and Quality Control Records
Monitored Submission and processing of Request for Inspections and Request for Information
(RFI's)
Formulated inspection schedules and Information schedules
Responsible for developing, implementing, and maintaining inventory control processes, ensuring
security and accountability of inventory, documenting transactions and developing inventory
systems to maximimze turn ratios.
Managed a Changed Management System
Lead Auditor in carrying out ISO 9001:2000 system audits
•Quality Management Plan in lieu with project specifications and ISO 9001 requirements; in addition
to quality control reports, method statements, post construction reports and detailed progress
reporting
Monitored a Team of Inspectors for Daily Inspection
Developed analytical spreadsheets for Lab Testing and Quality Control Records
Monitored Submission and processing of Request for Inspections and Request for Information
(RFI's)
Formulated inspection schedules and Information schedules
Responsible for developing, implementing, and maintaining inventory control processes, ensuring
security and accountability of inventory, documenting transactions and developing inventory
systems to maximimze turn ratios.
Managed a Changed Management System
Lead Auditor in carrying out ISO 9001:2000 system audits
janvier 2003
A février 2006
Quality Control Engineer
à Bouygues Travaux Publics (Jamaican Branch)-
Lieu :
Jamaïque
Highway 2000 Project:
-Provided administrative duties ·
-Constructed spreadsheets to aid in organized production
-Maintain product quality integrity·
-Analyze and interpret Soil Settlement results.·
-Analyzed Asphalt Mix designs·
-Organized day to day activities for the Road Works & Civil Works Teams
-Assist in the development of standards & procedures· Liaised with all production departments as it
relates to quality procedures and specifications·
-Control and archiving of quality records
Education
-Provided administrative duties ·
-Constructed spreadsheets to aid in organized production
-Maintain product quality integrity·
-Analyze and interpret Soil Settlement results.·
-Analyzed Asphalt Mix designs·
-Organized day to day activities for the Road Works & Civil Works Teams
-Assist in the development of standards & procedures· Liaised with all production departments as it
relates to quality procedures and specifications·
-Control and archiving of quality records
Education
Partager sur Facebook
Partager sur Twitter
Partager via Email