project manager water transfer dam Boussiaba - dam Haroun
KOU GC Sarl
Total years of experience :22 years, 4 Months
Employed as project manager water transfer dam Boussiaba - dam Haroun:
- Ensure the project management.
- Review of studies made by Canadian research firm RSWi.
- Group representation before the contracting authority.
- Monitoring of the assembly work of electrical, electromechanical and mechanical equipment subcontractor ≠ Siemens / KSB ≠.
- Lifting of reserves for pipe laying and suction and drain works along the route.
- Contractual follow-up, progress control in relation to the planning and invoicing follow-up of subcontractors.
- Negotiation and preparation of amendments within the framework of the contract.
- elaboration of contradictory attachments and signature of work situations and price revision.
- Commissioning of the 12.5MVA pumping station and 60 / 10KV electrical substation.
- preparation of the DGD general provisional account.
- writing of weekly and monthly reports with cost calculation.
- Preparation of the provisional acceptance of the project.
- Contractual correspondence with the client and different stakeholders.
• Responsible for monitoring the design offices involved in the Hydraulics and Building projects.
• Contractual follow-up, progress control compared to the planning and billing follow-up of the BET.
• Preparation of technical briefs for water transfer projects and pipeline part.
• Participation in meetings with the various offices of studies and follow-up.
• Preparation of bid files for national and international bidding.
• Critique of specifications, development of metrics and details of packages.
• Establishment of technical briefs, HSE plans, quality manual for hydraulic projects and public works.
• Preparation of tender files for hydraulic projects (WWTP, water transfer, pumping stations ...) with the masters of works (ANBT, ONA, ONID, ADE and DRE).
Employed as TECHNICAL PROJECT MANAGER at KOU.G.C:
Transfer of water between the dam Boussiaba 120 million m3 and dam Blessed Haroun1 000 million m3.
o amount of contract is 100 million euro
o Steel Pipe Ø 1400, Ø 1600 and Ø2000 in length of 30Km and 12.5MVA, looks of visit, traps and dumps, including equipment, two surge tanks capacity of 100 m3 each.
o Pumping station including electrical substation 60/ 10KV.
o Client: ANBT "National Agency Of Dams and Transfers"
• Project management technical, planning and contractual monitoring.
• Development of attachments, situations and provisional statements.
Valuation and preparation time and cost endorsements.
• Monitoring and enforcement profile study long and rating calculation, preparation of monthly reports (internal and client).
• Negotiation and preparation of sub-contracts, agreements and purchase orders for delivery.
• Contractual and technical monitoring of subcontractors.
• Technical follow in carrying out the work as planned executions.
• Participation in monthly meetings with the project owner, design department, administration and stakeholders).
• Establish work schedule, cost control and tracking billing / charge.
• Monitoring progress of civil works, laying pipe and hydro mechanical equipment, electrical and electromechanical 12.5MVA of the pumping station.
Employed as responsible for contracts and tenders KOU.G.C :
• Price Study party equipment (pipes, pumps, electromechanical, internal piping of the station, special parts, fittings, anti- ram and remote transmission system).
• Benefits procurement (purchasing different materials need to site ) Water Division (electromechanical equipment, mechanical, electrical and civil engineering materials ) .
• Establish technical briefs for the scenario of realization of installation sites, in pipe-laying works, works in lines and pumping stations.
• Plan the project with PERT and Gantt using MS Project software and primavera.
• Preparation of offers, contracts, negotiation and all the procedures until the contract is signed).
• Establishment of attachments, work situations, endorsements and contracts.
• Technical and economic study and comparison table for supplier selection.
Project Manager Training PMP “project manager professional’s CEPAM – OPTEAM: - Management of the project, its context and technical. - Preliminary studies and before detailed project. - Accounting and Finance. - Financial Evaluation. - Manage time and resources a Project. - Integration Management Project. - Management of project content. - Project Time Management. - Management of project costs. - Quality management project. - Management Project Human Resources. - Project Communications Management. - Management of project risks. - Management Project Procurement.
Training OPTEAM - Discover the requirements and components of the project manager's job - Implement the basic techniques of Project Management as management tools - To establish its leadership in the project, to adapt its management style - To experience the creation and management of a project team - Implement the communication process among stakeholders on the project - Mastering negotiation and conflict management - Ability to organize work - Effectively Conduct project meetings , journals
- cost estimate for civil engineering projects - dry cost calculation - calculation of site costs - seat cost calculation - sales coefficient calculation. - Study price. - Construction costs. - Office expenses. - Different general expenses.
indices and price revision formula for construction work contracts in algeria
State engineer in urban hydraulics "option supplying the city of Larbaa (200,000 inhabitants) with drinking water". prospecting topographic and site study environmental study hydraulic calculation and sizing of hydraulic structures.
Thus, during my professional career; in the fields of hydraulic and environmental works, I obtained a good knowledge of hydraulic studies, hydromechanical equipment (valves, check valves, anti-hammer ...) electromechanical (pumps, variable speed drive ...), concrete, construction works earthmoving building materials, hydrostatic testing of hydraulic structures, provisional and final acceptance.