مينا محب فنلي  تيموثاوس, Acting As Project Manager

مينا محب فنلي تيموثاوس

Acting As Project Manager

Orascom Construction Limited

البلد
مصر - القاهرة
التعليم
بكالوريوس, Bachelor's Degree, Civil Engineering
الخبرات
14 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 6 أشهر

Acting As Project Manager في Orascom Construction Limited
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ يناير 2024

• Company: Orascom Construction PLC.
• Project Title: Cairo Metro Line 3 - Phase 3
• Project Scope: Imbaba Workshop, Escalators & Elevators at Stations, 20 KV Cable Trough for Line
• Budget: 320 Million Egyptian Pound & 75 Million Euro.
• Client: National Authority of Tunnels (NAT).
• Consultant: Systra (CEJV).
• Key Responsibilities:
• Establishment of an internal team in the project for the construction of precast concrete works such as Main Beam Girder, Sewage Manholes, Duct Gutters, Electric Chambers, CCTV Handholes, Roads Removable Panels and Light Poles.
• Review the project in-depth to schedule deliverables and estimate costs
• Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations
• Coordinate and direct construction workers and subcontractors
• Select tools, materials and equipment and track inventory.
• Meet contractual conditions of performance.
• Review the work progress on daily basis.
• Ensure quality construction standards and the use of proper construction techniques.

Construction Manager في Orascom Construction PLC
  • مصر - القاهرة
  • ديسمبر 2021 إلى ديسمبر 2023

• Position Held: Construction Manager
• Company: Orascom Construction PLC.
• Project Title: Cairo Metro Line 3 - Phase 3
• Project Scope: Imbaba Workshop, Escalators & Elevators at Stations, 20 KV Cable Trough for Line
• Budget: 320 Million Egyptian Pound & 75 Million Euro.
• Client: National Authority of Tunnels (NAT).
• Consultant: Systra (CEJV).
• Key Responsibilities:
• Establishment of an internal team in the project for the construction of precast concrete works such as Main Beam Girder, Sewage Manholes, Duct Gutters, Electric Chambers, CCTV Handholes, Roads Removable Panels and Light Poles.
• Review the project in-depth to schedule deliverables and estimate costs
• Oversee all onsite and offsite constructions to monitor compliance with building and safety regulations
• Coordinate and direct construction workers and subcontractors
• Select tools, materials and equipment and track inventory.
• Meet contractual conditions of performance.
• Review the work progress on daily basis.
• Ensure quality construction standards and the use of proper construction techniques.

Construction Manager في Orascom Saudi Arabia Co.
  • المملكة العربية السعودية - جدة
  • سبتمبر 2018 إلى نوفمبر 2021

• Position Held: Construction Manager
• Company: Orascom Saudi Arabia Co.
• Project Title: King Abdul-Aziz International Airport Development Project (KAIA), Jeddah
• Project Scope: Land Side Roads, Utilities, Tunnels, Bridge, Grey Water Pump Station, 6 Sewage Pump Stations, Under Viaduct, Aprons.
• Budget: One Billion Fourteen Million Saudi Riyal.
• Client: GACA
• Consultant: Dar al Handasah
• Key Responsibilities:
• Establishing Precast Concrete Manufacturing Plant.
• Supervising Construction workers and hiring subcontractors.
• Select tools, materials and equipment and track inventory.
• Meet contractual conditions of performance.
• Review the work progress on daily basis.
• Ensure quality construction standards and the use of proper.

Site Team Leader في Orascom Saudi Arabia
  • المملكة العربية السعودية - جدة
  • فبراير 2016 إلى أغسطس 2018

• Position Held: Site Team Leader
• Company: Orascom Saudi Arabia Co.
• Project Title: King Abdul-Aziz International Airport Development Project (KAIA), Jeddah
• Project Scope: Land Side Roads, Utilities, Tunnels, Bridge, Grey Water Pump Station, 6 Sewage Pump Stations, Under Viaduct, Aprons.
• Budget: One Billion Fourteen Million Saudi Riyal.
• Client: GACA
• Consultant: Dar al Handasah.
• Key Responsibilities:
• Following My Crew (Engineers), Subcontractors Activities according to the Project Schedule
• Managing of The Precast Units Factory
• Managing of The Rebars, Carpenter and Welding Workshops
• Supervising the Elevated Bridge including the Horz. Post Tension Cables
• Supervising of Gravity Networks (Storm & Sewage) and Pressurized Networks (Fire, Grey, Potable) Including Excavation, Bedding and Backfilling
• Supervising of Dry Utilities (MV, LV, IT and Street Light) Including Excavation, Duct bank And Backfilling.

Senior Civil Engineer في ORASCOM SAUDI
  • المملكة العربية السعودية - جدة
  • يونيو 2011 إلى يناير 2016

• Position Held: Senior Civil Engineer
• Company: Orascom Saudi Arabia Co.
• Project Title: King Abdul-Aziz International Airport Development Project (KAIA), Jeddah, KSA
• Project Scope: Land Side Roads, Utilities, Tunnels, Bridge, Grey Water Pump Station, 6 Sewage Pump Stations, Under Viaduct, Aprons.
• Budget: One Billion Fourteen Million Saudi Riyal.
• Client: GACA.
• Consultant: Dar al Handasah.
• Key Responsibilities:
• Mobilization of Sites, Workshops and Precast Units Yard
• Supervising of all production area Civil Works Including Excavation, Formwork, Steel Reinforcement Erection and Scaffolding
• Managing of The Precast Units Factory.
• Managing of The Rebars, Carpenter and Welding Workshops
• Manufacture of Special Forms Used on Site.

Site Civil Engineer في Orascom Construction
  • مصر - القاهرة
  • أبريل 2011 إلى يونيو 2011

• Position Held: Site Civil Engineer.
• Company: Orascom Construction Industries Co.
• Project Title: National Bank of Abu Dhabi.
• Project Scope: 3Basements, Ground floor, six typical floors, Roof.
• Budget: 150 million Egyptian Pound. (stage1).
• Client: National Bank of Abu Dhabi.
• Consultant: Dar al Handasah.
• Key Responsibilities:
• Supervising The Excavation works, Raft Foundation including Formwork, Steel Reinforcement Erection and Concrete Pouring.

Site Civil Engineer في Orascom Construction
  • مصر - القاهرة
  • أبريل 2010 إلى أبريل 2011

• Position Held: Site Civil Engineer.
• Company: Orascom Construction Industries Co.
• Project Title: Development Workers Bank of Egypt.
• Project Scope: Excavation works, Support of the sides of drilling, Blinding Raft and insulation.
• Budget: 16 million Egyptian Pound. (stage1).
• Client: Development Workers Bank of Egypt.
• Consultant: Dar al Handasah.
• Key Responsibilities:
• Supervising The Excavation works, Support of the sides of drilling with Shotcrete System
• Supervising the Insulation EPDM for Shotcrete System
• Supervising The Raft Foundation including Formwork, Steel Reinforcement Erection and Concrete Pouring.

Junior Engineer في Orascom Construction
  • مصر - القاهرة
  • سبتمبر 2009 إلى أبريل 2010

• Position Held: Junior Engineer.
• Company: Orascom Construction Industries Co.
• Project Title: BNP PARIBAS Project.
• Project Scope: 3Basements, Ground floor, six typical floors, Roof.
• Budget: 200 million Egyptian Pound.
• Client: BNP PARIBAS Project.
• Consultant: Dar al Handasah.
• Key Responsibilities:
• Supervising The Basement, Ground and Typical Floors including Formwork, Steel Reinforcement Erection and Concrete Pouring.

الخلفية التعليمية

بكالوريوس, Bachelor's Degree, Civil Engineering
  • في Helwan university
  • مايو 2009

Specialties & Skills

TUNNELS
WELDING
EXCAVATION
REINFORCEMENT
CONSTRUCTION
DRILLING
CLOSED-CIRCUIT TELEVISION SYSTEMS (CCTV)
BIDDING
NEGOTIATION