مايكل Agustin, Project Support Engineer

مايكل Agustin

Project Support Engineer

Omnix International

البلد
الإمارات العربية المتحدة - دبي
التعليم
دبلوم, License Electronics Engineer
الخبرات
7 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :7 years, 6 أشهر

Project Support Engineer في Omnix International
  • الإمارات العربية المتحدة - دبي
  • يونيو 2007 إلى فبراير 2011

 Conduct Quality Inspection of installed AV equipments at site to provide sufficient requirements with the client satisfactory
 Assist in commissioning of infrared receivers at Atlantis Lost Chamber
 Visit site for Project Progress Report and actual inspection of installed cameras to see to it that equipments are installed as per the plan at Dubai Mall Pedestrian counting system project.
 Prepare Material Inspection Request (MIR) for material approval for construction and Work Inspection Request (WIR) for site inspection in locations where final fixing is finished.
 Generate weekly and monthly reports as per the site progress
 Recommends the type of thermal camera suitable to be used in specific locations as per the height and width of the area to be covered in Dubai Mall Pedestrian counting system.
 Coordinate all site activities related to technical documents and drawings
 Review architectural drawings: Main Contractors Instruction (MCI) & Project Managers Instruction (PMI).
 Review and Revision of shop drawings and As-built
 Material take off
 Preparation of material & drawing submittals
 Generate the various Project Progress reports as required
 Hand-over and provide technical training to the end user
 Installation and termination of AV equipments
 Installation of device software
 Structured cabling and cable laying
 Maintenance of audio/visual systems

Project Engineer cum Project Coordinator في MB Construction
  • الفلبين
  • أغسطس 2004 إلى يناير 2007

 Supervising and monitoring of projects.
 Electrical layout and design
 Reporting project status at progress meeting
 Prepare project progress report including materials and operational cost.
 Reporting project status at progress meeting
 Ensuring Target Program is being followed
 Coordinate with suppliers and order required materials

Maintenance Engineer في National Power Corporation
  • الفلبين
  • مايو 2003 إلى يوليو 2004

 Conduct preventive maintenance of generator and pneumatically controlled circuit breaker and other electrical components.
 Perform Preventive and emergency maintenance, especially during plant shutdowns
 Monitor/check all instruments during plant operation for possible malfunction/defects.
 Maintenance, troubleshooting and repair of electronic instruments such as, valves, pneumatic circuit breakers, temperature gauges, and pressure gauges
 Supervised clearing of transmission lines.
 Direct supervision of annual preventive maintenance of generators.
 Prepare preventive maintenance reports.

الخلفية التعليمية

دبلوم, License Electronics Engineer
  • في Professional Regulation Commission
  • مايو 2003

Licensure examination for Electronics Engineer

بكالوريوس, BS Electronics and Communication Engineering
  • في Saint Louis University
  • أكتوبر 2002

Specialties & Skills

اللغات

الانجليزية
متوسط
التاغلوج
متمرّس

العضويات

Institute of Electronics and Communication Engineers in the Philippines (IECEP)
  • Member
  • May 2003