مايكل أنجيلو Liceralde, Jr. Cost Control Engineer

مايكل أنجيلو Liceralde

Jr. Cost Control Engineer

Contraco WLL

البلد
الفلبين
التعليم
بكالوريوس, Civil Engineering
الخبرات
10 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 5 أشهر

Jr. Cost Control Engineer في Contraco WLL
  • قطر - الدوحة
  • يناير 2014 إلى فبراير 2019

Allocate actual costs to assigned cost codes within the scope of works.
Produce monthly cost report by each cost code.
Assign cost code in every invoice by the supplier & Subcontractor.
Review & assign cost code of each Labor activities in every month.

Assistant Cost Control Engineer في Odebrecht Construction International Inc.
  • ليبريا
  • مايو 2010 إلى أكتوبر 2012

Duties and Responsibilities:

• Allocate actual costs to assigned cost codes within the scope of works.
• Summarizing all the weekly man hour according to assigned cost code.
• Preparing of Variation orders for approval from Client and Tracking the cost of variation orders.
• Preparing summary of Fuel consumption for Light Duty & Heavy Duty equipment.
• Produce monthly cost report by each cost code.
• Assign & Verify cost codes by each requisition & time sheets.

Cost Control Engineer في UnitedODB Engineering and Construction
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2010 إلى مايو 2010

Duties and Responsibilities:

• Gathering all information regarding the expenses of the project to import to SISENG.
• Controlling the cost code assign of each work and manpower
• Checking the equipment hours in each week.
• Updating all the cost accounts in MYWEBDAY every month.

Assistant Cost Control Engineer في Odebrecht Engineering and Construction
  • جيبوتى
  • يونيو 2008 إلى أكتوبر 2009

Job Description:
Controlling all the cost, consumption and production report of crushing plant materials, concrete plant, interlock block .Preparing payment reports for the subcontractor. Preparing subcontractor service order and amendments of contract. Estimates structural and civil plans according to standard and specification.

Duties and Responsibilities:


• Checking and controlling all equipment hours, materials and manpower by area according to their cost codes and inputting into the system.
• Control and inspect plant production, distribution and consumption.
• Inputting into the system the direct and indirect cost area according to their respective cost accounts.
• Controlling all the materials and spare parts cost.
• In charge of all the payment reports of the entire subcontractor.

Project Engineer/Quantity Surveyor في Adobe Building System, Inc.
  • الفلبين
  • أكتوبر 2007 إلى مايو 2008

• Supervising all workers in job site
• Attending Pre Bid Meeting
• Performing Estimate
• Tallying all the estimate in Excel

Estimator في House Research Development (S) PTE. , LTD.
  • الفلبين
  • يونيو 2007 إلى أكتوبر 2007

• Performing Estimate
• Tallying all works that we have done.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في University of the East
  • مايو 2005
الثانوية العامة أو ما يعادلها,
  • في Catholic Central School
  • يناير 1995

Catholic Central School Tabaco Albay 1989 - 1995

Specialties & Skills

Microsoft Word
Microsoft Excel
Primavera P6
CONCRETE
ENGINEER
MS EXCEL
PROJECT ENGINEER
SURVEYOR
Primavera
COST CONTROL

اللغات

الانجليزية
متمرّس